home / openregs / legislation

legislation: 113-s-545

Congressional bills and resolutions from Congress.gov, filtered to policy areas relevant to environmental, health, agriculture, and wildlife regulation.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

bill_id congress bill_type bill_number title policy_area introduced_date latest_action_date latest_action_text origin_chamber sponsor_name sponsor_state sponsor_party sponsor_bioguide_id cosponsor_count summary_text update_date url
113-s-545 113 s 545 Hydropower Regulatory Efficiency Act of 2013 Water Resources Development 2013-03-13 2013-06-03 By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-36. Senate Sen. Murkowski, Lisa [R-AK] AK R M001153 12 Hydropower Regulatory Efficiency Act of 2013 - (Sec. 3) Amends the Public Utility Regulatory Policies Act of 1978 (PURPA) to increase from 5,000 to 10,000 kilowatts the size of small hydroelectric power projects which the Federal Energy Regulatory Commission (FERC) may exempt from its license requirements. (Sec. 4) Amends the Federal Power Act to revise the limitation on the maximum installation capacity of qualifying conduit hydropower facilities that are eligible for an exemption from licensing requirements. Requires any person, state, or municipality proposing to construct a qualifying conduit hydropower facility to file with FERC a notice of intent to do so. Requires FERC, within 15 days after receiving such a notice of intent, to make an initial determination as to whether the facility meets the qualifying criteria. Waives license requirements for any conduit hydroelectric facility that: (1) uses for electric power generation only the hydroelectric potential of a non-federally owned conduit, (2) has a maximum installed capacity of 5 megawatts, and (3) is not currently licensed or exempted from license requirements. Redefines "conduit" to specify any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. Authorizes FERC to: (1) exempt from license requirements any electric power generation facility that utilizes for such generation only the hydroelectric potential of a conduit, and has an installed capacity or 40 megawatts or fewer; and (2) extend the preliminary permit period for up to 2 additional years beyond the 3 years otherwise allowed if it finds that the permittee has implemented activities under the permit in good faith and with reasonable diligence. (Sec. 6) Directs FERC to: (1) investigate the feasibility of issuing a license for hydropower development at nonpowered dams and closed loop pumped storage projects during a two-year period, and (2) hold workshops and develop hydropower pilot projects. (Sec. 7) Directs the Secretary of Energy (DOE) to study: (1) the technical flexibility that existing pumped storage facilities can provide to support intermittent renewable electric energy generation, including the potential for such facilities to be upgraded or retrofitted with advanced commercially available technology; and (2) the technical potential of existing pumped storage facilities and new advanced pumped storage facilities to provide grid reliability benefits. 2023-01-11T13:23:20Z  

Links from other tables

  • 10 rows from bill_id in legislation_actions
  • 15 rows from bill_id in legislation_subjects
  • 12 rows from bill_id in legislation_cosponsors
  • 0 rows from bill_id in cbo_cost_estimates
Powered by Datasette · Queries took 11.27ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API