home / openregs / legislation

legislation: 113-hr-1769

Congressional bills and resolutions from Congress.gov, filtered to policy areas relevant to environmental, health, agriculture, and wildlife regulation.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

bill_id congress bill_type bill_number title policy_area introduced_date latest_action_date latest_action_text origin_chamber sponsor_name sponsor_state sponsor_party sponsor_bioguide_id cosponsor_count summary_text update_date url
113-hr-1769 113 hr 1769 Recognizing the National Benefits of Flood Protection Act of 2013 Water Resources Development 2013-04-26 2013-04-29 Referred to the Subcommittee on Water Resources and Environment. House Rep. Richmond, Cedric L. [D-LA-2] LA D R000588 0 Recognizing the National Benefits of Flood Protection Act of 2013 - Requires a feasibility study for a flood, hurricane, or storm damage reduction project to include calculations of the anticipated: (1) reduction in damage to public and private property and infrastructure; (2) direct and indirect economic benefits, including from potential reductions in national and regional economic volatility, disruptions, and losses; and (3) benefits to public safety, including protection of evacuation routes. Authorizes the non-federal interest for such a project to submit to the Chief of Engineers a request for a project review if the Chief: (1) determines that the project is not feasible, (2) issues an unfavorable report for the project, or (3) identifies the feasibility study for the project as inactive. Directs the Chief to establish a panel to conduct such reviews for each Corps of Engineers division not later than 60 days after the first request for a review of a project within that division is submitted. Requires such panel to conduct a review of: (1) the feasibility study for the project; (2) the adequacy and accessibility of the economic, engineering, and environmental methods, models, and analyses used in preparing such study; (3) public comments on the project; and (4) any additional information submitted by the non-federal interest as part of the review request. Requires: (1) the panel to submit a final report containing an economic, engineering, and environmental analysis of the feasibility study and a determination of the project's feasibility; and (2) the Chief, if the panel determines that a project is feasible, to issue a favorable report for the project. Directs the Chief to: (1) give priority to the completion of feasibility studies for projects in areas that have experienced flooding or hurricane damage during the preceding 10 years, and (2) submit an analysis of the connection between such Corps projects and navigation and the protection of energy infrastructure. 2022-11-15T16:33:57Z  

Links from other tables

  • 4 rows from bill_id in legislation_actions
  • 10 rows from bill_id in legislation_subjects
  • 0 rows from bill_id in legislation_cosponsors
  • 0 rows from bill_id in cbo_cost_estimates
Powered by Datasette · Queries took 0.759ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API