{"database": "openregs", "table": "federal_register", "rows": [["2020-28708", "Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America", "Notice", "The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft NUREG, knowledge management NUREG, NUREG/KM- 0015, \"Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United States of America.\" The NRC Staff and Oak Ridge National Laboratory have prepared a reference document summarizing recent lessons-learned in connection with a review of the site-specific probable maximum precipitation (SSPMP) estimates used by some nuclear power plant owners and operators in connection with a recent re-evaluation of external flooding at their respective project sites.", "2020-12-29", 2020, 12, "https://www.federalregister.gov/documents/2020/12/29/2020-28708/considerations-for-estimating-site-specific-probable-maximum-precipitation-at-nuclear-power-plants", "https://www.govinfo.gov/content/pkg/FR-2020-12-29/pdf/2020-28708.pdf", "Nuclear Regulatory Commission", "383", "The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft NUREG, knowledge management NUREG, NUREG/KM- 0015, \"Considerations for Estimating Site-Specific Probable Maximum Precipitation at Nuclear Power Plants in the United...", null]], "columns": ["document_number", "title", "type", "abstract", "publication_date", "pub_year", "pub_month", "html_url", "pdf_url", "agency_names", "agency_ids", "excerpts", "regulation_id_numbers"], "primary_keys": ["document_number"], "primary_key_values": ["2020-28708"], "units": {}, "query_ms": 22.616754053160548, "source": "Federal Register API & Regulations.gov API", "source_url": "https://www.federalregister.gov/developers/api/v1", "license": "Public Domain (U.S. Government data)", "license_url": "https://www.regulations.gov/faq"}