home / openregs / federal_register

federal_register: 2018-23191

All Federal Register documents (rules, proposed rules, notices, presidential documents) from 1994 to present. Nearly 1M documents with full-text search.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts regulation_id_numbers
2018-23191 Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Fire Protection System Nonsafety Cable Spray Removal Notice The U.S. Nuclear Regulatory Commission (NRC) is issuing License Amendment Nos. 145 and 144 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, and Georgia Power Company, Oglethorpe Power Corporation, MEAG Power SPVM, LLC, MEAG Power SPVJ, LLC, MEAG Power SPVP, LLC, and the City of Dalton, Georgia (collectively SNC); for construction and operation of the Vogtle Electric Generating Plant (VEGP) Units 3 and 4, located in Burke County, Georgia. The amendment authorizes changes in the form of departures to the VEGP Units 3 and 4 plant specific Design Control Document (PS-DCD) Tier 2 information contained within the Updated Final Safety Analysis Report and plant-specific Tier 1 information, with corresponding changes to Appendix C of the COL removing the fire protection system (FPS) nonsafety-related containment cable spray and installing passive fire stops and radiant energy shields. Specifically, the changes were for the removal of the FPS containment open nozzle water spray suppression system for the open nonsafety-related cable trays in fire zone 1100 AF 11300B and for installing passive fire stops and radiant energy shields. The exemption allows changes that impact Tier 1 of the PS-DCD and associated COL Appendix C of the Facility COL as specified in LAR 18- 015. This exemption is related to, and necessary for, the granting of the amendment which is being issued concurrently. 2018-10-24 2018 10 https://www.federalregister.gov/documents/2018/10/24/2018-23191/southern-nuclear-operating-company-inc-vogtle-electric-generating-plant-units-3-and-4-fire https://www.govinfo.gov/content/pkg/FR-2018-10-24/pdf/2018-23191.pdf Nuclear Regulatory Commission 383 The U.S. Nuclear Regulatory Commission (NRC) is issuing License Amendment Nos. 145 and 144 to Combined Licenses (COL), NPF-91 and NPF-92, respectively. The COLs were issued to Southern Nuclear Operating Company, and Georgia Power Company, Oglethorpe...  

Links from other tables

  • 1 row from document_number in federal_register_agencies
  • 1 row from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 48.217ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API