federal_register: 2017-24292
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts | regulation_id_numbers |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2017-24292 | Drawbridge Operation Regulation; Lake Washington, Seattle, WA | Rule | The Coast Guard is removing the existing drawbridge operation regulation for the Evergreen Point Floating Bridge (SR-520 Floating Bridge) across Lake Washington, mile 4.3, at Seattle, WA. The drawbridge was replaced with a fixed bridge in 2016, and the operating regulation is no longer applicable or necessary. The SR-520 Floating Bridge was rebuilt, and the center span was built with a fixed span that replaced the draw. | 2017-11-08 | 2017 | 11 | https://www.federalregister.gov/documents/2017/11/08/2017-24292/drawbridge-operation-regulation-lake-washington-seattle-wa | https://www.govinfo.gov/content/pkg/FR-2017-11-08/pdf/2017-24292.pdf | Homeland Security Department; Coast Guard | 227,53 | The Coast Guard is removing the existing drawbridge operation regulation for the Evergreen Point Floating Bridge (SR-520 Floating Bridge) across Lake Washington, mile 4.3, at Seattle, WA. The drawbridge was replaced with a fixed bridge in 2016, and the... |