home / openregs / federal_register

federal_register: 2015-20065

All Federal Register documents (rules, proposed rules, notices, presidential documents) from 1994 to present. Nearly 1M documents with full-text search.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts regulation_id_numbers
2015-20065 Pipeline Safety: Public Workshop on Hazardous Liquid Integrity Verification Process Notice This notice is announcing a public workshop to be held on the concept of "Hazard Liquid Integrity Verification Process (HL IVP)." The HL IVP is to confirm the Maximum Operating Pressure when pipeline records are not traceable, verifiable, or complete. The Pipeline and Hazardous Materials Safety Administration (PHMSA) held a similar workshop in August 2013 on the Integrity Verification Process for gas transmission pipelines to help address several mandates in the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 and National Transportation Safety Board recommendations. At this one day workshop, PHMSA will present the latest information for a proposal for HL IVP and have presentations of perspectives from pipeline operators, state regulatory partners, and the public. Earlier draft material provided to stakeholders along with comments in response from the American Petroleum Institute and the Association of Oil Pipelines are available via the same docket for this workshop. 2015-08-14 2015 8 https://www.federalregister.gov/documents/2015/08/14/2015-20065/pipeline-safety-public-workshop-on-hazardous-liquid-integrity-verification-process https://www.govinfo.gov/content/pkg/FR-2015-08-14/pdf/2015-20065.pdf Transportation Department; Pipeline and Hazardous Materials Safety Administration 492,408 This notice is announcing a public workshop to be held on the concept of "Hazard Liquid Integrity Verification Process (HL IVP)." The HL IVP is to confirm the Maximum Operating Pressure when pipeline records are not traceable, verifiable, or complete....  

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 1 row from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 2.021ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API