federal_register: 2014-24772
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts | regulation_id_numbers |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2014-24772 | Drawbridge Operation Regulation; Atlantic Intracoastal Waterway (AIWW), Chesapeake, VA | Rule | The Coast Guard has issued a temporary deviation from the operating schedule that governs the I-64 (High Rise) Bridge across the AIWW, South Branch of the Elizabeth River, mile 7.1, at Chesapeake, VA. This deviation is necessary to facilitate maintenance work on the movable spans drive machinery. This temporary deviation allows the drawbridge to remain in the closed to navigation position. | 2014-10-17 | 2014 | 10 | https://www.federalregister.gov/documents/2014/10/17/2014-24772/drawbridge-operation-regulation-atlantic-intracoastal-waterway-aiww-chesapeake-va | https://www.govinfo.gov/content/pkg/FR-2014-10-17/pdf/2014-24772.pdf | Homeland Security Department; Coast Guard | 227,53 | The Coast Guard has issued a temporary deviation from the operating schedule that governs the I-64 (High Rise) Bridge across the AIWW, South Branch of the Elizabeth River, mile 7.1, at Chesapeake, VA. This deviation is necessary to facilitate... |