2013-30665 Black Hills National Forest, South Dakota; Thunder Basin National Grassland, Wyoming; Teckla-Osage-Rapid City Transmission 230 kV Project Notice The Forest Service will prepare an environmental impact statement (EIS) on a proposal by Black Hills Power (BHP) to construct and operate a 230 kilovolt (kV) transmission line between the Teckla and Osage Substations in northeastern Wyoming to the Lange Substation in Rapid City, South Dakota. The Bureau of Land Management (BLM) is a cooperating agency on this EIS. The Teckla-Osage-Rapid City Transmission 230 kV Project would be approximately 150 miles long. It would cross portions of the Black Hills National Forest and private lands in South Dakota and portions of the Thunder Basin National Grasslands, private lands, BLM lands, and state lands in Wyoming. The line would be constructed on wood or steel H-frame structures for most of its length with possibly some steel monopole structures in the Rapid City area. The structures would be 65 to 75 feet tall and the line would require a right-of-way approximately 125 feet wide. This corrected notice of intent (corrected NOI) updates information in the original notice, published in the Federal Register August 26, 2011 (76FR53400). A corrected notice was needed to update the timing information for the Draft and Final EISs, and to clarify the mailing address for comments. Also, this project analysis is being conducted under the authority of the Forest Service predecisional objection regulation at 36 CFR 218, Subparts A and B, issued in the Federal Register on March 27, 2013 (78FR18481). 2013-12-24 2013 12 https://www.federalregister.gov/documents/2013/12/24/2013-30665/black-hills-national-forest-south-dakota-thunder-basin-national-grassland-wyoming-teckla-osage-rapid https://www.govinfo.gov/content/pkg/FR-2013-12-24/pdf/2013-30665.pdf Agriculture Department; Forest Service 12,209 The Forest Service will prepare an environmental impact statement (EIS) on a proposal by Black Hills Power (BHP) to construct and operate a 230 kilovolt (kV) transmission line between the Teckla and Osage Substations in northeastern Wyoming to the...  

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 1 row from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 0.389ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API