federal_register: 2012-23855
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts | regulation_id_numbers |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2012-23855 | Safety Zone, Changes to Original Rule; Boston Harbor's Rock Removal Project, Boston Inner Harbor, Boston, MA | Rule | The Coast Guard is establishing three temporary safety zones within Sector Boston's Captain of the Port (COTP) Zone for the drilling, blasting, and dredging operation on the navigable waters of Boston Inner Harbor, in the main ship channel near Castle Island. These temporary safety zones are necessary to enhance navigation, vessel safety, marine environmental protection, and provide for the safety of life on the navigable waters during the drilling, blasting and dredging operations in support of the U.S. Army Corps of Engineers rock removal project. Entering into, transiting through, mooring or anchoring within these safety zones is prohibited unless authorized by the COTP or the designated on-scene representative. | 2012-09-28 | 2012 | 9 | https://www.federalregister.gov/documents/2012/09/28/2012-23855/safety-zone-changes-to-original-rule-boston-harbors-rock-removal-project-boston-inner-harbor-boston | https://www.govinfo.gov/content/pkg/FR-2012-09-28/pdf/2012-23855.pdf | Homeland Security Department; Coast Guard | 227,53 | The Coast Guard is establishing three temporary safety zones within Sector Boston's Captain of the Port (COTP) Zone for the drilling, blasting, and dredging operation on the navigable waters of Boston Inner Harbor, in the main ship channel near Castle... |