79 rows where docket_id = "FRA-2011-0104" and document_type = "Other" sorted by posted_date descending
This data as json, CSV (advanced)
| id | agency_id | docket_id | title | document_type | subtype | posted_date ▲ | posted_year | posted_month | comment_start_date | comment_end_date | last_modified | fr_doc_num | open_for_comment | withdrawn | object_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| FRA-2011-0104-0096 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | FRA Letter to I-ETMS Host Railroads Regarding Security final signed | Other | Letter(s) | 2026-02-19T05:00:00Z | 2026 | 2 | 2026-02-19T05:00:00Z | 2026-02-19T22:30:00Z | 0 | 0 | 09000064b91c1acd | ||
| FRA-2011-0104-0095 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-250903-007 Twenty-one Host Railroads Joint RFA to Their PTCSPs | Other | Decision | 2025-09-08T04:00:00Z | 2025 | 9 | 2025-09-08T04:00:00Z | 2025-09-08T23:17:49Z | 0 | 0 | 09000064b8f528f7 | ||
| FRA-2011-0104-0091 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Joint ITC RFA to PTCSP - July 2025 | Other | Petition(s) | 2025-08-04T04:00:00Z | 2025 | 8 | 2025-08-04T04:00:00Z | 2025-08-04T19:02:08Z | 0 | 0 | 09000064b8ecca6a | ||
| FRA-2011-0104-0089 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC PTCIP V11.1 | Other | Report | 2025-07-03T04:00:00Z | 2025 | 7 | 2025-07-03T04:00:00Z | 2025-07-03T22:24:31Z | 0 | 0 | 09000064b8e1461f | ||
| FRA-2011-0104-0088 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor’s Request for Amendment to Its Positive Train Control Implementation Plan – Approval (Docket Number FRA-2011-0104) | Other | Decision | 2025-04-24T04:00:00Z | 2025 | 4 | 2025-04-24T04:00:00Z | 2025-04-24T19:18:26Z | 1 | 0 | 0900006486ab69e7 | ||
| FRA-2011-0104-0085 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Response | Other | Response(s) | 2025-03-11T04:00:00Z | 2025 | 3 | 2025-03-11T04:00:00Z | 2025-03-11T18:25:38Z | 1 | 0 | 09000064869db792 | ||
| FRA-2011-0104-0087 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-240328-010 CFRC RFA to Its PTC System v1.0 Temporary Outage-FRA-2010-0104 final signed | Other | Decision | 2025-03-11T04:00:00Z | 2025 | 3 | 2025-03-11T04:00:00Z | 2025-03-11T18:27:28Z | 1 | 0 | 09000064869db78e | ||
| FRA-2011-0104-0086 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-240328-010 CFRC RFA to Its PTC System v1.0 Temporary Outage-FRA-2010-0104 final signed | Other | Decision | 2025-03-11T04:00:00Z | 2025 | 3 | 2025-03-11T04:00:00Z | 2025-03-11T18:26:52Z | 1 | 0 | 09000064869db790 | ||
| FRA-2011-0104-0081 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-240717-003 Twenty-One Host Railroads ITC Joint RFA for OB 6.5.4.0 final signed | Other | Decision | 2024-07-23T04:00:00Z | 2024 | 7 | 2024-07-23T04:00:00Z | 2024-07-23T18:37:42Z | 0 | 0 | 0900006486603645 | ||
| FRA-2011-0104-0080 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC RFA to PTCSP – July 2024 | Other | Report | 2024-07-22T04:00:00Z | 2024 | 7 | 2024-07-22T04:00:00Z | 2024-07-22T13:20:32Z | 0 | 0 | 09000064865fb09c | ||
| FRA-2011-0104-0077 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Joint I-ETMS Mixed RFA to PTCSP Jun 2024 | Other | Report | 2024-06-11T04:00:00Z | 2024 | 6 | 2024-06-11T04:00:00Z | 2024-06-11T15:00:38Z | 0 | 0 | 09000064865ac03e | ||
| FRA-2011-0104-0073 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor’s Request for Temporary Outage – February 2024 | Other | Request | 2024-03-12T04:00:00Z | 2024 | 3 | 2024-03-12T04:00:00Z | 2024-03-12T19:06:02Z | 0 | 0 | 09000064864751d4 | ||
| FRA-2011-0104-0071 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-231025-004 CFRC's RFA to Its PTCSP and Certification as an I-ETMS Mixed System-FRA-2011-0104 final signed | Other | Decision | 2023-11-01T04:00:00Z | 2023 | 11 | 2023-11-01T04:00:00Z | 2024-11-12T06:20:24Z | 1 | 0 | 09000064861c331b | ||
| FRA-2011-0104-0070 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-230816-016 Notification of Delay in a Decision Regarding the CFRC's PTCSP-FRA-2011-0104 | Other | Decision | 2023-08-22T04:00:00Z | 2023 | 8 | 2023-08-22T04:00:00Z | 2024-11-11T21:31:57Z | 1 | 0 | 0900006485ed5e39 | ||
| FRA-2011-0104-0069 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-230619-001 Notification of Delay in a Decision Regarding the CFRC PTCSP-FRA-2011-0104 final signed | Other | Decision | 2023-06-22T04:00:00Z | 2023 | 6 | 2023-06-22T04:00:00Z | 2024-11-07T01:04:43Z | 1 | 0 | 0900006485bb6eb9 | ||
| FRA-2011-0104-0068 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-230424-020 Notification of Delay in a Decision Regarding the CFRC PTCSP-FRA-2011-0104 final signed | Other | Decision | 2023-04-25T04:00:00Z | 2023 | 4 | 2023-04-25T04:00:00Z | 2024-11-12T22:51:04Z | 1 | 0 | 0900006485982c4b | ||
| FRA-2011-0104-0066 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Joint I-ETMS Non-Vital Overlay RFA to PTCSP March 2023 | Other | Report | 2023-03-16T04:00:00Z | 2023 | 3 | 2023-03-16T04:00:00Z | 2023-03-16T12:12:24Z | 0 | 0 | 09000064857b8587 | ||
| FRA-2011-0104-0065 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC RFA to PTCIP v11 Dec 2022 | Other | Report | 2022-12-16T05:00:00Z | 2022 | 12 | 2022-12-16T05:00:00Z | 2022-12-16T21:06:37Z | 0 | 0 | 090000648553dec2 | ||
| FRA-2011-0104-0063 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC PTCSP v4.1 Oct 2022 | Other | Report | 2022-11-07T05:00:00Z | 2022 | 11 | 2022-11-07T05:00:00Z | 2022-11-07T14:16:02Z | 0 | 0 | 0900006485493c22 | ||
| FRA-2011-0104-0062 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC PTCIP Version 10.4 June 2022 | Other | Report | 2022-06-24T04:00:00Z | 2022 | 6 | 2022-06-24T04:00:00Z | 2022-06-24T14:59:33Z | 0 | 0 | 090000648518caf1 | ||
| FRA-2011-0104-0061 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-211101-002 CFRC-TEXRail-TREs Joint RFA to their PTCSPs-Approval | Other | Decision | 2021-11-09T05:00:00Z | 2021 | 11 | 2021-11-09T05:00:00Z | 2024-11-07T00:34:15Z | 1 | 0 | 0900006484e38b8f | ||
| FRA-2011-0104-0059 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-210623-001 Three Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Approval | Other | Decision | 2021-07-09T04:00:00Z | 2021 | 7 | 2021-07-09T04:00:00Z | 2024-11-12T23:32:53Z | 1 | 0 | 0900006484be0bd4 | ||
| FRA-2011-0104-0058 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC RFA to PTCIP and Revised PTCIP Version 10.3 - November 2019 | Other | Report | 2021-06-22T04:00:00Z | 2021 | 6 | 2021-06-22T04:00:00Z | 2021-07-01T13:30:22Z | 0 | 0 | 0900006484b9be2e | ||
| FRA-2011-0104-0056 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 5-26-2021 | Other | Report | 2021-06-01T04:00:00Z | 2021 | 6 | 2021-06-01T04:00:00Z | 2021-06-01T19:24:10Z | 0 | 0 | 0900006484b4893e | ||
| FRA-2011-0104-0055 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor – “SunRail” (CFRC) 2020 Annual PTC Progress Report | Other | Report | 2021-05-05T04:00:00Z | 2021 | 5 | 2021-05-05T04:00:00Z | 2021-05-05T19:30:28Z | 0 | 0 | 0900006484ad0579 | ||
| FRA-2011-0104-0054 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - SunRail (CFRC) Q4 2020 PTC Progress Report | Other | Report | 2021-04-26T04:00:00Z | 2021 | 4 | 2021-04-26T04:00:00Z | 2021-04-26T13:49:42Z | 0 | 0 | 0900006484ab6b63 | ||
| FRA-2011-0104-0053 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-201215-001 CFRCs PTCSP Approval and Certification of Its I-ETMS as a Mixed System | Other | Decision | 2020-12-28T05:00:00Z | 2020 | 12 | 2020-12-28T05:00:00Z | 2024-11-12T23:26:31Z | 1 | 0 | 09000064849cca43 | ||
| FRA-2011-0104-0052 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - SunRail (CFRC) Q3 2020 PTC Progress Report | Other | Report | 2020-11-17T05:00:00Z | 2020 | 11 | 2020-11-17T05:00:00Z | 2020-11-17T17:42:28Z | 0 | 0 | 0900006484964459 | ||
| FRA-2011-0104-0051 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - 'Sunrail' (CFRC) Q2 2020 PTC Progress Report | Other | Report | 2020-08-13T04:00:00Z | 2020 | 8 | 2020-08-13T04:00:00Z | 2020-08-13T13:49:24Z | 0 | 0 | 09000064847fb0ff | ||
| FRA-2011-0104-0050 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - 'SunRail' (CFRC) Q1 2020 PTC Progress Report | Other | Report | 2020-05-15T04:00:00Z | 2020 | 5 | 2020-05-15T04:00:00Z | 2020-05-15T15:13:43Z | 0 | 0 | 090000648460724d | ||
| FRA-2011-0104-0049 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | RRS-200430-001 NOTICE OF DELAY CFRC PTCSP | Other | Letter(s) | 2020-05-05T04:00:00Z | 2020 | 5 | 2020-05-05T04:00:00Z | 2024-11-12T23:19:23Z | 1 | 0 | 09000064845609c7 | ||
| FRA-2011-0104-0048 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | US DOT/FRA- Decision | Other | Decision | 2020-04-24T04:00:00Z | 2020 | 4 | 2020-04-24T04:00:00Z | 2020-04-24T20:47:29Z | 0 | 0 | 09000064844d4eeb | ||
| FRA-2011-0104-0047 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - 'SunRail' (CFRC) 2019 Annual PTC Progress Report | Other | Report | 2020-04-03T04:00:00Z | 2020 | 4 | 2020-04-03T04:00:00Z | 2020-04-03T13:56:34Z | 0 | 0 | 0900006484485596 | ||
| FRA-2011-0104-0046 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - “SunRail” (CFRC) Q4 2019 PTC Progress Report | Other | Report | 2020-02-26T05:00:00Z | 2020 | 2 | 2020-02-26T05:00:00Z | 2020-02-26T14:47:33Z | 0 | 0 | 09000064843b5d46 | ||
| FRA-2011-0104-0045 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - 'SunRail' (CFRC) PTC Safety Plan (PTCSP) Version 3.1 - November 2019 | Other | Report | 2019-12-23T05:00:00Z | 2019 | 12 | 2019-12-23T05:00:00Z | 2019-12-23T14:19:50Z | 0 | 0 | 0900006484248317 | ||
| FRA-2011-0104-0044 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Decision | Other | Decision | 2019-12-23T05:00:00Z | 2019 | 12 | 2019-12-23T05:00:00Z | 2024-11-12T23:14:39Z | 1 | 0 | 0900006484247ff7 | ||
| FRA-2011-0104-0043 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - 'SunRail' (CFRC) Q3 2019 PTC Progress Report | Other | Report | 2019-11-25T05:00:00Z | 2019 | 11 | 2019-11-25T05:00:00Z | 2019-11-25T20:45:20Z | 0 | 0 | 09000064841b237e | ||
| FRA-2011-0104-0042 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - “SunRail” (CFRC) Q2 2019 PTC Progress Report | Other | Report | 2019-09-10T04:00:00Z | 2019 | 9 | 2019-09-10T04:00:00Z | 2019-09-10T18:56:07Z | 0 | 0 | 0900006483f2b694 | ||
| FRA-2011-0104-0041 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Decision | Other | Decision | 2019-06-25T04:00:00Z | 2019 | 6 | 2019-06-25T04:00:00Z | 2024-11-12T23:03:01Z | 1 | 0 | 0900006483d3eb08 | ||
| FRA-2011-0104-0040 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor – “SunRail” (CFRC) Q1 2019 PTC Progress Report | Other | Report | 2019-05-29T04:00:00Z | 2019 | 5 | 2019-05-29T04:00:00Z | 2019-05-29T19:26:00Z | 0 | 0 | 0900006483cd3b4c | ||
| FRA-2011-0104-0039 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor – “SunRail” (CFRC) 2018 Annual PTC Progress Report | Other | Report | 2019-04-10T04:00:00Z | 2019 | 4 | 2019-04-10T04:00:00Z | 2019-04-10T19:51:14Z | 0 | 0 | 0900006483b8015a | ||
| FRA-2011-0104-0038 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Decision | Other | Decision | 2019-04-01T04:00:00Z | 2019 | 4 | 2019-04-01T04:00:00Z | 2024-11-12T22:58:00Z | 1 | 0 | 0900006483b52c57 | ||
| FRA-2011-0104-0035 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Request for Amendment to the PTC Implementation Plan (PTCIP) Version 9.0 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:39:19Z | 0 | 0 | 0900006483ace09c | ||
| FRA-2011-0104-0037 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Revised PTC Implementation Plan (PTCIP) Version 10.1 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:40:38Z | 0 | 0 | 0900006483ace09e | ||
| FRA-2011-0104-0036 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Request for an Alternative Schedule and Sequence with Supporting Artifacts | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:39:54Z | 0 | 0 | 0900006483ace09d | ||
| FRA-2011-0104-0034 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S .DOT/FRA - Decision | Other | Decision | 2019-02-28T05:00:00Z | 2019 | 2 | 2019-02-28T05:00:00Z | 2024-11-12T22:56:14Z | 1 | 0 | 0900006483aaf9a2 | ||
| FRA-2011-0104-0033 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - SunRail (CFRC) Q4 2018 PTC Progress Report | Other | Report | 2019-02-15T05:00:00Z | 2019 | 2 | 2019-02-15T05:00:00Z | 2019-02-15T15:35:45Z | 0 | 0 | 0900006483a7ac28 | ||
| FRA-2011-0104-0032 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Decision | Other | Decision | 2018-12-12T05:00:00Z | 2018 | 12 | 2018-12-12T05:00:00Z | 2024-11-12T22:50:43Z | 1 | 0 | 090000648394ddc4 | ||
| FRA-2011-0104-0031 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - SunRail (CFRC) Q3 2018 PTC Progress Report | Other | Report | 2018-11-23T05:00:00Z | 2018 | 11 | 2018-11-23T05:00:00Z | 2018-11-23T14:38:44Z | 0 | 0 | 09000064838f5df6 | ||
| FRA-2011-0104-0030 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA- Response | Other | Response(s) | 2018-09-19T04:00:00Z | 2018 | 9 | 2018-09-19T04:00:00Z | 2024-11-07T01:38:41Z | 1 | 0 | 0900006483724f38 | ||
| FRA-2011-0104-0029 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Signed Final Central Florida Rail Corridor At-Risk PTC Letter Q2 | Other | Letter(s) | 2018-09-04T04:00:00Z | 2018 | 9 | 2018-09-04T04:00:00Z | 2018-09-04T14:29:22Z | 0 | 0 | 0900006483696c40 | ||
| FRA-2011-0104-0028 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor -SunRail (CFRC) Q2 2018 PTC Progress Report | Other | Report | 2018-08-23T04:00:00Z | 2018 | 8 | 2018-08-23T04:00:00Z | 2018-08-24T19:17:53Z | 0 | 0 | 090000648364bfd8 | ||
| FRA-2011-0104-0027 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Letter | Other | Letter(s) | 2018-06-25T04:00:00Z | 2018 | 6 | 2018-06-25T04:00:00Z | 2024-11-07T01:33:21Z | 1 | 0 | 0900006483456f42 | ||
| FRA-2011-0104-0025 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Substitute Criteria Request Letter to FRA (Oct. 31 2016) | Other | Request | 2018-06-20T04:00:00Z | 2018 | 6 | 2018-06-20T04:00:00Z | 2018-06-20T20:26:43Z | 0 | 0 | 090000648343762e | ||
| FRA-2011-0104-0026 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | FRA Substitute Criteria Approval Letter to CFRC (Jan. 23 2017) | Other | Request | 2018-06-20T04:00:00Z | 2018 | 6 | 2018-06-20T04:00:00Z | 2018-06-20T20:27:32Z | 0 | 0 | 090000648343769b | ||
| FRA-2011-0104-0023 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (SunRail) At-Risk PTC Letter (Quarter 1 of 2018 | Other | Report | 2018-06-07T04:00:00Z | 2018 | 6 | 2018-06-07T04:00:00Z | 2018-06-07T13:54:54Z | 0 | 0 | 09000064833648ba | ||
| FRA-2011-0104-0024 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Florida Department of Transportation - Notification of At-Risk PTC Letter for Central Florida Rail Corridor (SunRail) and South Florida Regional Transportation Authority (Tri-Rail) (Quarter 1 of 2018) | Other | Report | 2018-06-07T04:00:00Z | 2018 | 6 | 2018-06-07T04:00:00Z | 2018-06-07T14:43:42Z | 0 | 0 | 0900006483365e06 | ||
| FRA-2011-0104-0022 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - SunRail (CFRC) Q1 2018 PTC Progress Report | Other | Report | 2018-05-15T04:00:00Z | 2018 | 5 | 2018-05-15T04:00:00Z | 2018-06-06T16:11:37Z | 0 | 0 | 0900006483269fa6 | ||
| FRA-2011-0104-0021 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | At-Risk PTC Letter-Central Florida Rail Corridor Sun Rail | Other | Letter(s) | 2018-04-26T04:00:00Z | 2018 | 4 | 2018-04-26T04:00:00Z | 2024-11-07T01:28:30Z | 1 | 0 | 09000064831d3236 | ||
| FRA-2011-0104-0020 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S.DOT/FRA - Approval | Other | Decision | 2018-04-02T04:00:00Z | 2018 | 4 | 2018-04-02T04:00:00Z | 2024-11-07T01:24:22Z | 1 | 0 | 0900006483088872 | ||
| FRA-2011-0104-0019 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) 2017 Annual PTC Progress Report | Other | Report | 2018-04-02T04:00:00Z | 2018 | 4 | 2018-04-02T04:00:00Z | 2018-04-02T14:16:28Z | 0 | 0 | 09000064830867be | ||
| FRA-2011-0104-0018 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) Q4 2017 PTC Progress Report | Other | Report | 2018-02-12T05:00:00Z | 2018 | 2 | 2018-02-12T05:00:00Z | 2018-02-12T20:08:38Z | 0 | 0 | 0900006482f1b366 | ||
| FRA-2011-0104-0017 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) Q3 2017 PTC Progress Report | Other | Report | 2017-11-30T05:00:00Z | 2017 | 11 | 2017-11-30T05:00:00Z | 2017-11-30T20:00:31Z | 0 | 0 | 0900006482cc2764 | ||
| FRA-2011-0104-0016 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) Q2 2017 PTC Progress Report | Other | Report | 2017-08-15T04:00:00Z | 2017 | 8 | 2017-08-15T04:00:00Z | 2017-08-15T14:34:51Z | 0 | 0 | 0900006482a1ea0b | ||
| FRA-2011-0104-0015 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S. DOT/FRA - Acknowledgment Letter | Other | 2017-07-19T00:00:00Z | 2017 | 7 | 2024-11-07T01:03:06Z | 0 | 1 | 0900006482942166 | ||||
| FRA-2011-0104-0014 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) Q1 2017 PTC Progress Report | Other | Report | 2017-05-16T04:00:00Z | 2017 | 5 | 2017-05-16T04:00:00Z | 2017-05-16T18:51:06Z | 0 | 0 | 09000064825c7213 | ||
| FRA-2011-0104-0013 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) 2016 Annual PTC Progress Report | Other | Report | 2017-04-25T04:00:00Z | 2017 | 4 | 2017-04-25T04:00:00Z | 2017-04-25T18:21:42Z | 0 | 0 | 0900006482574c5a | ||
| FRA-2011-0104-0012 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) PTC Implementation Plan (PTCIP) Version 4.0 | Other | Report | 2017-03-14T04:00:00Z | 2017 | 3 | 2017-03-14T04:00:00Z | 2017-03-14T17:26:27Z | 0 | 0 | 09000064825071f6 | ||
| FRA-2011-0104-0011 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) Q4 2016 Quarterly PTC Progress Report | Other | Report | 2017-02-15T05:00:00Z | 2017 | 2 | 2017-02-15T05:00:00Z | 2017-02-15T21:50:59Z | 0 | 0 | 09000064824c44f1 | ||
| FRA-2011-0104-0010 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Quarterly PTC Progress Report (FRA F 6180.165) 093016 Q3 101316 | Other | Report | 2016-11-18T05:00:00Z | 2016 | 11 | 2016-11-18T05:00:00Z | 2016-11-18T16:36:58Z | 0 | 0 | 09000064823a2218 | ||
| FRA-2011-0104-0009 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | CFRC Quarterly PTC Progress Report Form (FRA F 6180.165) | Other | Report | 2016-09-13T04:00:00Z | 2016 | 9 | 2016-09-13T04:00:00Z | 2016-09-13T20:10:42Z | 0 | 0 | 0900006482207103 | ||
| FRA-2011-0104-0008 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Annual PTC Progress Report 033016 CFRC | Other | Report | 2016-04-29T04:00:00Z | 2016 | 4 | 2016-04-29T04:00:00Z | 2016-04-29T14:19:47Z | 0 | 0 | 0900006481f9906f | ||
| FRA-2011-0104-0007 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | PTC Implementation Status Update | Other | Service Information | 2015-09-17T04:00:00Z | 2015 | 9 | 2015-09-17T17:39:13Z | 0 | 0 | 0900006481c6ffbd | |||
| FRA-2011-0104-0006 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor (CFRC) - 2014 Annual Update | Other | Letter(s) | 2015-01-23T05:00:00Z | 2015 | 1 | 2015-01-23T05:00:00Z | 2024-11-12T05:33:30Z | 1 | 0 | 09000064819dbc74 | ||
| FRA-2011-0104-0005 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S. DOT/FRA - Central Florida Rail Corridor Positive Train Control Implementation Plan Revision and Resubmission-Approval | Other | Letter(s) | 2012-08-23T04:00:00Z | 2012 | 8 | 2012-08-23T04:00:00Z | 2012-08-23T19:49:39Z | 0 | 0 | 09000064810ebeed | ||
| FRA-2011-0104-0004 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - Postive Train Control Implementation Plan and Designation of Confidential Information | Other | Request | 2012-06-12T04:00:00Z | 2012 | 6 | 2012-06-12T04:00:00Z | 2012-06-12T18:51:25Z | 0 | 0 | 090000648103a67b | ||
| FRA-2011-0104-0003 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - Positive Train Control Implementation Plan and Designation of Confidential Information | Other | Letter(s) | 2012-05-03T04:00:00Z | 2012 | 5 | 2012-05-03T04:00:00Z | 2024-11-07T22:15:03Z | 1 | 0 | 0900006480ff4924 | ||
| FRA-2011-0104-0002 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | U.S. DOT/FRA - Decision Letter - Florida Department of Transportation - District Five Railroad's PTCIP is Disapproved Without Prejudice in Accordance With 49 CFR §§ 236.1009 and 236.1011 (Redacted) | Other | Letter(s) | 2012-03-16T04:00:00Z | 2012 | 3 | 2012-03-16T04:00:00Z | 2012-03-16T19:26:26Z | 0 | 0 | 0900006480fd71c1 | ||
| FRA-2011-0104-0001 | FRA | Central Florida Rail Corridor - Positive Train Control Development Plan FRA-2011-0104 | Central Florida Rail Corridor - CFRC Positive Train Control Implementation Plan and Designation of Confidential Information (Redacted Version) | Other | Request | 2012-03-01T05:00:00Z | 2012 | 3 | 2012-03-01T05:00:00Z | 2012-03-01T17:00:36Z | 0 | 0 | 0900006480fc3df0 |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE documents (
id TEXT PRIMARY KEY,
agency_id TEXT,
docket_id TEXT REFERENCES dockets(id),
title TEXT,
document_type TEXT,
subtype TEXT,
posted_date TEXT,
posted_year INTEGER,
posted_month INTEGER,
comment_start_date TEXT,
comment_end_date TEXT,
last_modified TEXT,
fr_doc_num TEXT,
open_for_comment INTEGER,
withdrawn INTEGER,
object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;