posted_year 14

  • 2019 11
  • 2020 11
  • 2021 11
  • 2023 8
  • 2018 7
  • 2012 6
  • 2017 6
  • 2015 5
  • 2010 3
  • 2016 3
  • 2022 3
  • 2024 2
  • 2025 2
  • 2026 1

document_type 1

  • Other · 79 ✖

agency_id 1

  • FRA 79
id agency_id docket_id title document_type subtype posted_date ▲ posted_year posted_month comment_start_date comment_end_date last_modified fr_doc_num open_for_comment withdrawn object_id
FRA-2010-0065-0094 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 FRA Letter to I-ETMS Host Railroads Regarding Security final signed Other Letter(s) 2026-02-19T05:00:00Z 2026 2 2026-02-19T05:00:00Z   2026-02-19T22:32:31Z   0 0 09000064b91c1b0e
FRA-2010-0065-0093 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-250903-007 Twenty-one Host Railroads Joint RFA to Their PTCSPs Other Decision 2025-09-08T04:00:00Z 2025 9 2025-09-08T04:00:00Z   2025-09-08T23:43:58Z   0 0 09000064b8f55ac3
FRA-2010-0065-0090 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint ITC RFA to PTCSP - July 2025 Other Petition(s) 2025-08-04T04:00:00Z 2025 8 2025-08-04T04:00:00Z   2025-08-04T19:02:07Z   0 0 09000064b8ed4abf
FRA-2010-0065-0088 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-240717-003 Twenty-One Host Railroads ITC Joint RFA for OB 6.5.4.0 final signed Other Decision 2024-07-23T04:00:00Z 2024 7 2024-07-23T04:00:00Z   2024-07-23T18:37:40Z   0 0 090000648660390f
FRA-2010-0065-0085 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Jun 2024 Other Report 2024-06-11T04:00:00Z 2024 6 2024-06-11T04:00:00Z   2024-06-11T15:04:03Z   0 0 09000064865ac0ce
FRA-2010-0065-0084 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-231214-004 Twenty Host Railroads' Joint Request to Amend Their PTCSPs Approval final signed Other Request 2023-12-18T05:00:00Z 2023 12 2023-12-18T05:00:00Z   2024-11-12T06:24:32Z   1 0 0900006486343b04
FRA-2010-0065-0081 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Nov 2023 Other Report 2023-11-07T05:00:00Z 2023 11 2023-11-07T05:00:00Z   2023-11-07T15:07:43Z   0 0 0900006486219838
FRA-2010-0065-0080 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-230811-004 Nineteen Host Railroads Joint Request to Amend Their PTCSPs Denial Without Prejudice final signed Other Request 2023-08-15T04:00:00Z 2023 8 2023-08-15T04:00:00Z   2024-11-07T00:46:19Z   1 0 0900006485e3d5ca
FRA-2010-0065-0077 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-230710-017 FRN Railroads Joint RFA to Their PTC Safety Plans and PTC Systems final Other Request 2023-07-26T04:00:00Z 2023 7 2023-08-01T04:00:00Z   2024-11-07T23:39:47Z   1 0 0900006485d55e14
FRA-2010-0065-0075 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Jun 2023 Other Report 2023-07-14T04:00:00Z 2023 7 2023-07-14T04:00:00Z   2023-07-14T20:41:56Z   0 0 0900006485cb5097
FRA-2010-0065-0074 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-230505-006 Twenty Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Conditional Approval final signed Other Decision 2023-05-09T04:00:00Z 2023 5 2023-05-09T04:00:00Z   2024-11-12T05:51:25Z   1 0 09000064859e43bd
FRA-2010-0065-0072 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Mar 2023 Other Report 2023-04-06T04:00:00Z 2023 4 2023-04-06T04:00:00Z   2023-04-06T19:38:28Z   0 0 09000064858f464a
FRA-2010-0065-0071 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Jan 2023 Other   2023-01-26T00:00:00Z 2023 1     2023-02-09T19:04:09Z   0 1 090000648560cf1e
FRA-2010-0065-0070 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-220728-001 Twenty Host Railroads' Joint Request to Amend for Mixed System to Their PTCSPs-Approval Other Agency Response 2022-08-09T04:00:00Z 2022 8 2022-08-09T04:00:00Z   2024-11-12T23:43:29Z   1 0 090000648522a5de
FRA-2010-0065-0068 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint I-ETMS Mixed RFA to PTCSP Onboard version 6.3.24.0 Jun 2022 Other Report 2022-07-12T04:00:00Z 2022 7 2022-07-12T04:00:00Z   2022-07-12T14:06:52Z   0 0 09000064851c314b
FRA-2010-0065-0067 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-211223-014 Nineteen Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Approval final signed Other Additional Information 2022-01-18T05:00:00Z 2022 1 2022-01-18T05:00:00Z   2022-01-20T13:45:43Z   0 0 0900006484f23d92
FRA-2010-0065-0066 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-211025-008 19 Railroads Joint RFA (I-ETMS Mixed System) disapproval without prejudice Other Decision 2021-10-26T04:00:00Z 2021 10 2021-10-26T04:00:00Z   2024-11-07T00:33:43Z   1 0 0900006484df7d8a
FRA-2010-0065-0064 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Other Report 2021-09-28T04:00:00Z 2021 9 2021-09-28T04:00:00Z   2021-09-28T19:30:03Z   0 0 0900006484db0097
FRA-2010-0065-0063 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-210907-007 Comments associated with the Nineteen Host Railroads Joint Request to Amend to Their Positive Train Control Safety Plans Other Letter(s) 2021-09-16T04:00:00Z 2021 9 2021-09-16T04:00:00Z   2024-11-07T00:32:28Z   1 0 0900006484d87e23
FRA-2010-0065-0062 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 9-10-2021 Other Report 2021-09-14T04:00:00Z 2021 9 2021-09-14T04:00:00Z   2021-09-17T19:21:53Z   0 0 0900006484d7d7a8
FRA-2010-0065-0061 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-210826-005 19 Railroads Decision Letter Approving Joint RFA (I-ETMS Mixed System) Other Decision 2021-09-01T04:00:00Z 2021 9 2021-09-01T04:00:00Z   2021-09-01T21:43:31Z   0 0 0900006484d3956c
FRA-2010-0065-0059 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 7-16-2021 Other Additional Information 2021-07-20T04:00:00Z 2021 7 2021-07-20T04:00:00Z   2021-07-20T14:09:02Z   0 0 0900006484c038c4
FRA-2010-0065-0058 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT RFA to PTCIP and Revised PTCIP Version 1.13 - June 2020 Other Report 2021-06-21T04:00:00Z 2021 6 2021-06-21T04:00:00Z   2021-07-06T13:21:34Z   0 0 0900006484b9bd4a
FRA-2010-0065-0056 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-210528-002 Decision Letter Approving Joint RFA (I-ETMS Mixed System) Other Decision 2021-06-08T04:00:00Z 2021 6 2021-06-08T04:00:00Z   2024-11-12T23:31:07Z   1 0 0900006484b5e664
FRA-2010-0065-0055 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Joint RFA to Railroads' I-ETMS PTCSPs, Filed 4-23-2021 Other Report 2021-04-27T04:00:00Z 2021 4 2021-04-27T04:00:00Z   2021-04-27T18:58:19Z   0 0 0900006484ab8476
FRA-2010-0065-0054 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2020 PTC Progress Report Other Report 2021-04-27T04:00:00Z 2021 4 2021-04-27T04:00:00Z   2021-04-27T13:52:05Z   0 0 0900006484ab71d6
FRA-2010-0065-0053 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal (KCT) 2020 Annual PTC Progress Report Other Report 2021-04-24T04:00:00Z 2021 4 2021-04-24T04:00:00Z   2021-05-05T19:12:22Z   0 0 0900006484ab54a2
FRA-2010-0065-0052 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-201109-002 KCT Railway's PTCSP Approval and Certification of Its I-ETMS Other Decision 2020-12-14T05:00:00Z 2020 12 2020-12-14T05:00:00Z   2024-11-06T23:43:17Z   1 0 090000648499bc10
FRA-2010-0065-0051 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q3 2020 PTC Progress Report Other Report 2020-11-17T05:00:00Z 2020 11 2020-11-17T05:00:00Z   2020-11-17T18:20:58Z   0 0 0900006484964941
FRA-2010-0065-0050 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-200904-001 CONRAIL PTCSP HAZARD LOG REQUEST Other Letter(s) 2020-09-16T04:00:00Z 2020 9 2020-09-16T04:00:00Z   2024-11-06T23:40:31Z   1 0 090000648485f5fc
FRA-2010-0065-0049 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal (KCT) Q2 2020 PTC Progress Report Other Report 2020-08-13T04:00:00Z 2020 8 2020-08-13T04:00:00Z   2020-08-13T14:14:29Z   0 0 09000064847fbcc9
FRA-2010-0065-0047 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-200610-001 KCT RAILWAY'S PTCSP REV. 1.0 ACKNOWLEDGEMENT LETTER Other Acknowledgement Letter/Receipt 2020-07-14T04:00:00Z 2020 7 2020-07-14T04:00:00Z   2024-11-06T23:37:15Z   1 0 09000064847533a9
FRA-2010-0065-0048 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal (KCT) PTC Safety Plan (PTCSP) Version 1.0 - June 2020 Other Report 2020-07-14T04:00:00Z 2020 7 2020-07-14T04:00:00Z   2020-07-14T16:02:27Z   0 0 090000648475618b
FRA-2010-0065-0046 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 RRS-200616-002 KCT RFA to PTCIP v.1.13 Approval Other Decision 2020-06-25T04:00:00Z 2020 6 2020-06-25T04:00:00Z   2024-11-06T23:38:12Z   1 0 090000648470ddb0
FRA-2010-0065-0045 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal (KCT) Q1 2020 PTC Progress Report Other Report 2020-05-15T04:00:00Z 2020 5 2020-05-15T04:00:00Z   2020-05-15T20:19:33Z   0 0 090000648460deec
FRA-2010-0065-0044 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) 2019 Annual PTC Progress Report Other Report 2020-04-03T04:00:00Z 2020 4 2020-04-03T04:00:00Z   2020-04-03T14:49:08Z   0 0 0900006484485a92
FRA-2010-0065-0043 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 FRA PTC At-Risk Letter to Kansas City Terminal Railway Other Letter(s) 2020-03-02T05:00:00Z 2020 3 2020-03-02T05:00:00Z   2024-11-06T23:32:41Z   1 0 09000064843d079a
FRA-2010-0065-0042 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2019 PTC Progress Report Other Report 2020-02-26T05:00:00Z 2020 2 2020-02-26T05:00:00Z   2020-02-26T15:32:28Z   0 0 09000064843b5c18
FRA-2010-0065-0041 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S.DOT/FRA - Decision Other Decision 2019-12-12T05:00:00Z 2019 12 2019-12-12T05:00:00Z   2024-11-12T23:14:19Z   1 0 090000648420936c
FRA-2010-0065-0040 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q3 2019 PTC Progress Report Other Report 2019-11-25T05:00:00Z 2019 11 2019-11-25T05:00:00Z   2019-11-25T21:06:37Z   0 0 09000064841b2572
FRA-2010-0065-0039 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S.DOT/FRA- Decision Other Decision 2019-10-22T04:00:00Z 2019 10 2019-10-22T04:00:00Z   2024-11-12T23:10:41Z   1 0 09000064840e9e5c
FRA-2010-0065-0038 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q2 2019 PTC Progress Report Other Report 2019-09-10T04:00:00Z 2019 9 2019-09-10T04:00:00Z   2019-09-10T19:33:20Z   0 0 0900006483f2c70e
FRA-2010-0065-0037 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S.DOT/FRA - Decision Other Decision 2019-06-10T04:00:00Z 2019 6 2019-06-10T04:00:00Z   2024-11-12T23:02:10Z   1 0 0900006483cfc570
FRA-2010-0065-0036 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q1 2019 PTC Progress Report Other Report 2019-05-29T04:00:00Z 2019 5 2019-05-29T04:00:00Z   2019-05-29T19:45:57Z   0 0 0900006483cd4105
FRA-2010-0065-0035 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) 2018 Annual PTC Progress Report Other Report 2019-04-10T04:00:00Z 2019 4 2019-04-10T04:00:00Z   2019-04-10T20:07:32Z   0 0 0900006483b80286
FRA-2010-0065-0034 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2018 PTC Progress Report Other Report 2019-02-15T05:00:00Z 2019 2 2019-02-15T05:00:00Z   2019-02-15T16:00:11Z   0 0 0900006483a7b756
FRA-2010-0065-0032 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT Request for an Alternative Schedule and Sequence Other Report 2019-02-13T05:00:00Z 2019 2 2019-02-13T05:00:00Z   2019-02-13T17:50:58Z   0 0 0900006483a697cf
FRA-2010-0065-0033 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT Revised PTC Implementation Plan (PTCIP) v1.9 Other Report 2019-02-13T05:00:00Z 2019 2 2019-02-13T05:00:00Z   2019-02-13T17:51:09Z   0 0 0900006483a697d0
FRA-2010-0065-0031 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S.DOT/FRA - Decision Other Request 2019-01-24T05:00:00Z 2019 1 2019-01-24T05:00:00Z   2024-11-12T22:52:26Z   1 0 0900006483a083be
FRA-2010-0065-0030 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q3 2018 PTC Progress Report Other Report 2018-11-23T05:00:00Z 2018 11 2018-11-23T05:00:00Z   2018-11-23T15:03:01Z   0 0 09000064838f620e
FRA-2010-0065-0029 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S. DOT/FRA - Request for Substitute Criteria Conditional Approval Other Request 2018-11-01T04:00:00Z 2018 11 2018-11-01T04:00:00Z   2024-11-12T22:48:46Z   1 0 09000064838793b0
FRA-2010-0065-0028 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Test Request Approval Other Decision 2018-09-19T04:00:00Z 2018 9 2018-09-19T04:00:00Z   2024-11-07T01:37:43Z   1 0 0900006483724a61
FRA-2010-0065-0027 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q2 2018 PTC Progress Report Other Report 2018-08-24T04:00:00Z 2018 8 2018-08-24T04:00:00Z   2018-08-24T15:43:49Z   0 0 090000648364c9ce
FRA-2010-0065-0026 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q1 2018 PTC Progress Report Other Report 2018-05-15T04:00:00Z 2018 5 2018-05-15T04:00:00Z   2018-05-15T19:46:51Z   0 0 090000648326a73b
FRA-2010-0065-0025 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) 2017 Annual PTC Progress Report Other Report 2018-04-02T04:00:00Z 2018 4 2018-04-02T04:00:00Z   2018-04-02T14:27:09Z   0 0 0900006483086ccf
FRA-2010-0065-0024 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2017 PTC Progress Report Other Report 2018-02-12T05:00:00Z 2018 2 2018-02-12T05:00:00Z   2018-02-12T21:28:59Z   0 0 0900006482f1b6e9
FRA-2010-0065-0023 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q3 2017 PTC Progress Report Other Report 2017-12-01T05:00:00Z 2017 12 2017-12-01T05:00:00Z   2017-12-01T16:14:12Z   0 0 0900006482cc4ffc
FRA-2010-0065-0022 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q2 2017 PTC Progress Report Other Report 2017-08-15T04:00:00Z 2017 8 2017-08-15T04:00:00Z   2017-08-15T14:33:15Z   0 0 0900006482a1ef11
FRA-2010-0065-0021 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2017 Quarterly PTC Progress Report Other Report 2017-05-16T04:00:00Z 2017 5 2017-05-16T04:00:00Z   2017-05-16T19:35:57Z   0 0 09000064825c7b93
FRA-2010-0065-0020 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) 2016 Annual PTC Progress Report Other Report 2017-04-25T04:00:00Z 2017 4 2017-04-25T04:00:00Z   2017-04-25T18:18:26Z   0 0 0900006482574c63
FRA-2010-0065-0019 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) PTC Implementation Plan (PTCIP) Version 1.6 Other Report 2017-03-09T05:00:00Z 2017 3 2017-03-09T05:00:00Z   2017-03-09T20:13:07Z   0 0 09000064824fd46e
FRA-2010-0065-0018 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) Q4 2016 Quarterly PTC Progress Report Other Report 2017-02-15T05:00:00Z 2017 2 2017-02-15T05:00:00Z   2017-02-15T21:58:16Z   0 0 09000064824c497f
FRA-2010-0065-0017 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT 2016 Q3 Quarterly PTC Progress Report Form (FRA F 6180.165) Other Report 2016-11-18T05:00:00Z 2016 11 2016-11-18T05:00:00Z   2016-11-18T16:28:45Z   0 0 09000064823a1dc4
FRA-2010-0065-0016 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT 2016 Q1-Q2 Quarterly PTC Progress Report Form (FRA F 6180.165) Other Report 2016-09-13T04:00:00Z 2016 9 2016-09-13T04:00:00Z   2016-09-13T19:58:58Z   0 0 0900006482206e66
FRA-2010-0065-0015 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT 2015 PTC Annual Report v1.0 Other Report 2016-04-29T04:00:00Z 2016 4 2016-04-29T04:00:00Z   2016-04-29T14:08:37Z   0 0 0900006481f98fa9
FRA-2010-0065-0014 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Request for Amendment - KCT PTCIP v1.5_REDACTED Other Report 2015-09-01T04:00:00Z 2015 9 2015-09-01T04:00:00Z   2015-09-01T14:22:11Z   0 0 0900006481c1cc03
FRA-2010-0065-0013 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT PTCIP V1.5_BODY Other Report 2015-09-01T04:00:00Z 2015 9 2015-09-01T04:00:00Z   2015-09-01T14:21:23Z   0 0 0900006481c1cc02
FRA-2010-0065-0012 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT PTCIP v1.5 Appendices_CLEAN_REDACTED Other Report 2015-09-01T04:00:00Z 2015 9 2015-09-01T04:00:00Z   2015-09-01T14:20:48Z   0 0 0900006481c1cc01
FRA-2010-0065-0011 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S. DOT/FRA - Kansas City Transit PTCIP Disapproval Letter Other Decision 2015-07-16T04:00:00Z 2015 7 2015-07-16T04:00:00Z   2024-11-11T21:05:00Z   1 0 0900006481b875ca
FRA-2010-0065-0010 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway (KCT) - 2014 Annual Update Other Report 2015-01-23T05:00:00Z 2015 1 2015-01-23T05:00:00Z   2024-11-11T20:55:34Z   1 0 09000064819dbcd8
FRA-2010-0065-0009 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway Company (KCT) Positive Train Control Implementation Plan (PTCIP) Other Acknowledgement Letter/Receipt 2012-12-19T05:00:00Z 2012 12 2012-12-19T05:00:00Z   2024-11-12T05:09:26Z   1 0 0900006481191619
FRA-2010-0065-0008 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S. DOT/FRA - KCT Request for Amendment Approval Other Acknowledgement Letter/Receipt 2012-11-14T05:00:00Z 2012 11 2012-11-14T05:00:00Z   2024-11-12T05:08:14Z   1 0 0900006481166569
FRA-2010-0065-0007 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway Company (KCT) Positive Train Control Implementation Plan (PTCIP) Request for Amendment (RFA) Other Request 2012-05-03T04:00:00Z 2012 5 2012-05-03T04:00:00Z   2024-11-07T22:16:00Z   1 0 09000064810042b4
FRA-2010-0065-0004 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway Company - Electronic Train Management System PTC Implementation Plan (PTCIP) - Version 1.3 - July 5, 2011 Other Additional Information 2012-03-05T05:00:00Z 2012 3 2012-03-05T05:00:00Z   2024-11-07T22:36:51Z   1 0 0900006480fc3ebf
FRA-2010-0065-0006 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway Company - Request for Admendment - Type Approval Reference - PTCIP - July 19, 2011 Other Request 2012-03-05T05:00:00Z 2012 3 2012-03-05T05:00:00Z   2024-11-12T04:41:48Z   1 0 0900006480fc3eea
FRA-2010-0065-0005 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway Company - Notice of Product Intent (NPI) - Version 1.0 - July 19, 2010 Other Additional Information 2012-03-05T05:00:00Z 2012 3 2012-03-05T05:00:00Z   2024-11-07T22:32:40Z   1 0 0900006480fc3ec3
FRA-2010-0065-0003 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 KCT_PTCIP_Redacted_VErsion_V1.2_Clean Other Other 2010-11-17T05:00:00Z 2010 11 2010-11-17T05:00:00Z   2013-08-11T03:11:26Z   0 0 0900006480b78a55
FRA-2010-0065-0002 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 U.S. DOT/FRA - PTC Implementation Plan Revision and Resubmission- Provisional Approval Other Other 2010-10-05T04:00:00Z 2010 10 2010-10-05T04:00:00Z   2013-08-11T03:11:06Z   0 0 0900006480b680dd
FRA-2010-0065-0001 FRA Kansas City Terminal Railway (KCT) - Positive Train Control Plans FRA-2010-0065 Kansas City Terminal Railway - Electronic Train Management System - PTC Implementation Plan Other Other 2010-04-28T04:00:00Z 2010 4 2010-04-28T04:00:00Z   2024-11-07T22:18:02Z   1 0 0900006480ae1089

Advanced export

JSON shape: default, array, newline-delimited, object

CSV options:

CREATE TABLE documents (
    id TEXT PRIMARY KEY,
    agency_id TEXT,
    docket_id TEXT REFERENCES dockets(id),
    title TEXT,
    document_type TEXT,
    subtype TEXT,
    posted_date TEXT,
    posted_year INTEGER,
    posted_month INTEGER,
    comment_start_date TEXT,
    comment_end_date TEXT,
    last_modified TEXT,
    fr_doc_num TEXT,
    open_for_comment INTEGER,
    withdrawn INTEGER,
    object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;
Powered by Datasette · Queries took 3276.547ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API