149 rows where docket_id = "FRA-2010-0051" sorted by posted_date descending

✎ View and edit SQL

This data as json, CSV (advanced)

Suggested facets: subtype, posted_month, open_for_comment, withdrawn, posted_date (date), comment_start_date (date), comment_end_date (date), last_modified (date)

posted_year 16

  • 2013 19
  • 2021 17
  • 2018 16
  • 2019 14
  • 2023 13
  • 2015 11
  • 2014 10
  • 2024 10
  • 2017 7
  • 2020 7
  • 2010 6
  • 2025 6
  • 2012 5
  • 2022 4
  • 2016 3
  • 2026 1

document_type 2

  • Other 136
  • Notice 13

agency_id 1

  • FRA 149
id agency_id docket_id title document_type subtype posted_date ▲ posted_year posted_month comment_start_date comment_end_date last_modified fr_doc_num open_for_comment withdrawn object_id
FRA-2010-0051-0161 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 FRA Letter to I-ETMS Host Railroads Regarding Security final signed Other Letter(s) 2026-02-19T05:00:00Z 2026 2 2026-02-19T05:00:00Z   2026-02-19T22:35:10Z   0 0 09000064b91bf785
FRA-2010-0051-0160 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-250903-007 Twenty-one Host Railroads Joint RFA to Their PTCSPs Other Decision 2025-09-08T04:00:00Z 2025 9 2025-09-08T04:00:00Z   2025-09-08T23:36:48Z   0 0 09000064b8f55a91
FRA-2010-0051-0156 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint ITC RFA to PTCSP - July 2025 Other Petition(s) 2025-08-04T04:00:00Z 2025 8 2025-08-04T04:00:00Z   2025-08-04T19:02:06Z   0 0 09000064b8ecca66
FRA-2010-0051-0155 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Joint Request for Amendment: Positive Train Control Safety Plans Notice Request for Comments 2025-08-01T04:00:00Z 2025 8 2025-08-01T04:00:00Z 2025-08-22T03:59:59Z 2025-08-23T09:00:28Z 2025-14631 0 0 09000064b8ec6d8f
FRA-2010-0051-0154 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-250407-016 Caltrain's RFA to its PTCSP Approval-FRA-2010-0051 final signed Other Decision 2025-04-16T04:00:00Z 2025 4 2025-04-16T04:00:00Z   2025-04-16T18:44:05Z   1 0 0900006486a9861d
FRA-2010-0051-0153 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Request for Amendment: Peninsula Corridor Joint Powers Board; Positive Train Control Safety Plan and Positive Train Control System Notice Request for Comments 2025-02-11T05:00:00Z 2025 2 2025-02-11T05:00:00Z 2025-03-04T04:59:59Z 2025-02-11T13:20:47Z 2025-02431 0 0 090000648694ca89
FRA-2010-0051-0152 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain RFA to PTCSP – January 2025 Other Report 2025-02-04T05:00:00Z 2025 2 2025-02-04T05:00:00Z   2025-02-04T14:30:55Z   0 0 090000648692d88a
FRA-2010-0051-0148 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-240727-001 Caltrain's RFA to Its PTCSP Ver. 1.1 Approval-FRA-2010-0051 final signed Other Decision 2024-08-06T04:00:00Z 2024 8 2024-08-06T04:00:00Z   2024-11-12T22:38:38Z   1 0 0900006486620330
FRA-2010-0051-0147 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Request for Amendment: Railroads' Joint Request to Amend Positive Train Control Safety Plans and Positive Train Control Systems Notice Request for Comments 2024-07-30T04:00:00Z 2024 7 2024-07-30T04:00:00Z 2024-08-20T03:59:59Z 2024-11-12T22:38:58Z 2024-16750 1 0 090000648660e77d
FRA-2010-0051-0146 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-240717-003 Twenty-One Host Railroads ITC Joint RFA for OB 6.5.4.0 final signed Other Decision 2024-07-23T04:00:00Z 2024 7 2024-07-23T04:00:00Z   2024-07-23T18:37:32Z   0 0 09000064866034c6
FRA-2010-0051-0142 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint RFA to PTCSP v1.0 – July 2024 Other Report 2024-07-12T04:00:00Z 2024 7 2024-07-12T04:00:00Z   2024-07-12T18:20:38Z   0 0 09000064865ec79d
FRA-2010-0051-0141 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Request for Amendment: Peninsula Corridor Joint Powers Board; Positive Train Control Safety Plan and Positive Train Control System Notice Request for Comments 2024-06-28T04:00:00Z 2024 6 2024-06-28T04:00:00Z 2024-07-19T03:59:59Z 2024-11-12T22:35:06Z 2024-14298 1 0 09000064865d0c1d
FRA-2010-0051-0140 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain RFA to PTCSP v1.1 – June 2024 Other Report 2024-06-20T04:00:00Z 2024 6 2024-06-20T04:00:00Z   2024-06-20T15:33:04Z   0 0 09000064865c159a
FRA-2010-0051-0139 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Request for Amendment: Joint Request to Amend Positive Train Control Safety Plans Notice Request for Comments 2024-06-20T04:00:00Z 2024 6 2024-06-20T04:00:00Z 2024-07-11T03:59:59Z 2024-11-12T22:36:37Z 2024-13481 1 0 09000064865c1123
FRA-2010-0051-0138 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Jun 2024 Other Report 2024-06-11T04:00:00Z 2024 6 2024-06-11T04:00:00Z   2024-06-11T15:09:50Z   0 0 09000064865ac50b
FRA-2010-0051-0137 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ PTCIP v11.0 – April 2024 Other Report 2024-05-31T04:00:00Z 2024 5 2024-05-31T04:00:00Z   2024-05-31T12:51:43Z   0 0 090000648658e4d2
FRA-2010-0051-0136 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-240507-007 Caltrain RFA to Its PTCIP 11.0 v.1 Approval-FRA-2010-0051 final signed Other Decision 2024-05-24T04:00:00Z 2024 5 2024-05-24T04:00:00Z   2024-05-24T11:50:06Z   0 0 0900006486580b09
FRA-2010-0051-0135 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-231214-004 Twenty Host Railroads' Joint Request to Amend Their PTCSPs Approval final signed Other Request 2023-12-18T05:00:00Z 2023 12 2023-12-18T05:00:00Z   2024-11-12T06:21:26Z   1 0 0900006486343a74
FRA-2010-0051-0133 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Joint Request to Amend Their Positive Train Control Safety Plans Notice Notice of Availability 2023-11-13T05:00:00Z 2023 11 2023-11-13T05:00:00Z 2023-12-05T04:59:59Z 2024-11-12T06:22:02Z 2023-24973 1 0 090000648625e774
FRA-2010-0051-0132 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Nov 2023 Other Report 2023-11-07T05:00:00Z 2023 11 2023-11-07T05:00:00Z   2023-11-07T15:18:23Z   0 0 090000648621988f
FRA-2010-0051-0131 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-230811-004 Nineteen Host Railroads Joint Request to Amend Their PTCSPs Denial Without Prejudice final signed Other Request 2023-08-15T04:00:00Z 2023 8 2023-08-15T04:00:00Z   2024-11-07T00:46:16Z   1 0 0900006485e3d3a0
FRA-2010-0051-0128 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-230710-017 FRN Railroads Joint RFA to Their PTC Safety Plans and PTC Systems final Other Request 2023-07-26T04:00:00Z 2023 7 2023-07-26T04:00:00Z   2024-11-07T23:39:46Z   1 0 0900006485d548ac
FRA-2010-0051-0127 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Notice Notice of Availability 2023-07-19T04:00:00Z 2023 7 2023-07-19T04:00:00Z 2023-08-09T03:59:59Z 2024-11-12T05:50:51Z 2023-15231 1 0 0900006485cdeb26
FRA-2010-0051-0126 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Jun 2023 Other Report 2023-07-14T04:00:00Z 2023 7 2023-07-14T04:00:00Z   2023-07-14T20:46:04Z   0 0 0900006485cb50c9
FRA-2010-0051-0125 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Positive Train Control Network: Caltrain's Request for Approval to Begin Field Testing Notice Notice of Availability 2023-06-27T04:00:00Z 2023 6 2023-06-27T04:00:00Z 2023-07-20T03:59:59Z 2024-11-12T05:50:17Z 2023-13644 1 0 0900006485bfd0cb
FRA-2010-0051-0124 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain Test Request – June 2023 Other Request 2023-06-21T04:00:00Z 2023 6 2023-06-21T04:00:00Z   2023-06-21T18:33:44Z   0 0 0900006485b973ab
FRA-2010-0051-0123 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-230505-006 Twenty Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Conditional Approval final signed Other Decision 2023-05-09T04:00:00Z 2023 5 2023-05-09T04:00:00Z   2024-11-12T05:51:25Z   1 0 09000064859e459b
FRA-2010-0051-0122 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Notice Notice of Availability 2023-04-11T04:00:00Z 2023 4 2023-04-11T04:00:00Z 2023-05-02T03:59:59Z 2024-11-07T00:49:44Z 2023-07558 1 0 090000648592c3ff
FRA-2010-0051-0121 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Mar 2023 Other Report 2023-04-06T04:00:00Z 2023 4 2023-04-06T04:00:00Z   2023-04-06T19:49:43Z   0 0 09000064858f464e
FRA-2010-0051-0120 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Jan 2023 Other   2023-01-26T00:00:00Z 2023 1     2023-02-09T19:09:10Z   0 1 090000648560cced
FRA-2010-0051-0119 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-220728-001 Twenty Host Railroads' Joint Request to Amend for Mixed System to Their PTCSPs-Approval Other Agency Response 2022-08-09T04:00:00Z 2022 8 2022-08-09T04:00:00Z   2024-11-12T23:43:40Z   1 0 090000648522a326
FRA-2010-0051-0118 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint I-ETMS Mixed RFA to PTCSP Onboard version 6.3.24.0 Jun 2022 Other Report 2022-07-12T04:00:00Z 2022 7 2022-07-12T04:00:00Z   2022-07-12T13:51:49Z   0 0 09000064851c310e
FRA-2010-0051-0117 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-220215-015 Peninsula Corridor Joint Powers Board (Caltrain) Crossing Optimization Project Test Request Approval-FRA- 2010-0051_signed Other Decision 2022-03-09T05:00:00Z 2022 3 2022-03-09T05:00:00Z   2024-11-07T00:38:21Z   1 0 0900006484fc1ef2
FRA-2010-0051-0116 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-211223-014 Nineteen Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Approval final signed Other Additional Information 2022-01-18T05:00:00Z 2022 1 2022-01-18T05:00:00Z   2022-01-20T13:10:26Z   0 0 0900006484f23d4e
FRA-2010-0051-0115 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain's Request for Approval to Test Crossing Optimization on Its Positive Train Control Network Notice Request for Comments 2021-12-15T05:00:00Z 2021 12 2021-12-15T05:00:00Z 2022-02-15T04:59:59Z 2024-11-12T23:35:39Z 2021-27125 1 0 0900006484ecb057
FRA-2010-0051-0114 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCMZ) “Caltrain” Other Report 2021-12-08T05:00:00Z 2021 12 2021-12-08T05:00:00Z   2021-12-08T17:13:43Z   0 0 0900006484eb06b7
FRA-2010-0051-0113 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-211025-008 19 Railroads Joint RFA (I-ETMS Mixed System) disapproval without prejudice Other Decision 2021-10-26T04:00:00Z 2021 10 2021-10-26T04:00:00Z   2024-11-07T00:33:42Z   1 0 0900006484df7d6b
FRA-2010-0051-0111 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Other Report 2021-09-28T04:00:00Z 2021 9 2021-09-28T04:00:00Z   2021-09-28T18:28:52Z   0 0 0900006484daff23
FRA-2010-0051-0112 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Notice Request for Comments 2021-09-24T04:00:00Z 2021 9 2021-10-04T04:00:00Z 2021-10-15T03:59:59Z 2024-11-06T23:51:42Z 2021-20640 1 0 0900006484db970b
FRA-2010-0051-0110 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-210907-007 Comments associated with the Nineteen Host Railroads Joint Request to Amend to Their Positive Train Control Safety Plans Other Letter(s) 2021-09-16T04:00:00Z 2021 9 2021-09-16T04:00:00Z   2024-11-06T23:51:29Z   1 0 0900006484d87d95
FRA-2010-0051-0109 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 9-10-2021 Other Report 2021-09-14T04:00:00Z 2021 9 2021-09-14T04:00:00Z   2021-09-17T19:08:51Z   0 0 0900006484d7c8f5
FRA-2010-0051-0108 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-210826-005 19 Railroads Decision Letter Approving Joint RFA (I-ETMS Mixed System) Other Decision 2021-09-01T04:00:00Z 2021 9 2021-09-01T04:00:00Z   2021-09-01T21:33:30Z   0 0 0900006484d3948a
FRA-2010-0051-0107 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 FRA-2010-0028-0235 (1) Notice Request for Comments 2021-07-28T04:00:00Z 2021 7 2021-07-28T04:00:00Z 2021-08-17T03:59:59Z 2024-11-06T23:49:54Z 2021-15973 1 0 0900006484c14f88
FRA-2010-0051-0106 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 7-16-2021 Other Additional Information 2021-07-20T04:00:00Z 2021 7 2021-07-20T04:00:00Z   2021-07-20T14:37:13Z   0 0 0900006484c03951
FRA-2010-0051-0105 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ RFA to PTCIP and Revised PTCIP Version 10 - April 2019 Other Report 2021-06-22T04:00:00Z 2021 6 2021-06-22T04:00:00Z   2021-07-20T15:07:50Z   0 0 0900006484ba0403
FRA-2010-0051-0103 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-210528-002 Decision Letter Approving Joint RFA (I-ETMS Mixed System) Other Decision 2021-06-08T04:00:00Z 2021 6 2021-06-08T04:00:00Z   2024-11-12T23:31:05Z   1 0 0900006484b5e075
FRA-2010-0051-0104 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems Notice Request for Comments 2021-05-26T04:00:00Z 2021 5 2021-05-26T04:00:00Z 2021-06-08T03:59:59Z 2024-11-12T23:31:17Z 2021-11125 1 0 0900006484b5ffc9
FRA-2010-0051-0102 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Joint RFA to Railroads' I-ETMS PTCSPs, Filed 4-23-2021 Other Report 2021-04-27T04:00:00Z 2021 4 2021-04-27T04:00:00Z   2021-04-27T15:58:58Z   0 0 0900006484ab8ce1
FRA-2010-0051-0101 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q4 2020 PTC Progress Report Other Report 2021-04-26T04:00:00Z 2021 4 2021-04-26T04:00:00Z   2021-04-26T15:35:05Z   0 0 0900006484ab7284
FRA-2010-0051-0100 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) 2020 Annual PTC Progress Report Other Report 2021-04-24T04:00:00Z 2021 4 2021-04-24T04:00:00Z   2021-04-24T17:06:33Z   0 0 0900006484ab54b4
FRA-2010-0051-0099 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-201231-001 Peninsula Corridor Joint Powers Board (Caltrain) Two-Speed Check Field Test Request - Conditional Approval Other Decision 2021-01-06T05:00:00Z 2021 1 2021-01-06T05:00:00Z   2021-01-06T15:24:27Z   0 0 09000064849dfe16
FRA-2010-0051-0098 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-201120-003 CALTRAINs CERTIFICATION of its I-ETMS and PTCSP APPROVAL Other Decision 2020-12-17T05:00:00Z 2020 12 2020-12-17T05:00:00Z   2024-11-12T23:26:41Z   1 0 09000064849a4370
FRA-2010-0051-0097 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q3 2020 PTC Progress Report Other Report 2020-11-17T05:00:00Z 2020 11 2020-11-17T05:00:00Z   2020-11-17T19:12:26Z   0 0 0900006484964d01
FRA-2010-0051-0096 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 RRS-200904-001 CALTRAIN PTCSP HAZARD LOG REQUEST Other Letter(s) 2020-09-18T04:00:00Z 2020 9 2020-09-18T04:00:00Z   2024-11-12T23:25:58Z   1 0 0900006484864885
FRA-2010-0051-0095 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - 'Caltrain' (PCMZ) Q2 2020 PTC Progress Report Other Report 2020-08-13T04:00:00Z 2020 8 2020-08-13T04:00:00Z   2020-08-13T14:43:41Z   0 0 09000064847fc302
FRA-2010-0051-0094 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - 'Caltrain' (PCJX-PCMZ) Q1 2020 PTC Progress Report Other Report 2020-05-18T04:00:00Z 2020 5 2020-05-18T04:00:00Z   2020-05-18T14:20:35Z   0 0 0900006484632314
FRA-2010-0051-0093 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - 'Caltrain' (PCJX-PCMZ) 2019 Annual PTC Progress Report Other Report 2020-04-03T04:00:00Z 2020 4 2020-04-03T04:00:00Z   2020-04-03T15:58:33Z   0 0 0900006484486256
FRA-2010-0051-0092 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q4 2019 PTC Progress Report Other Report 2020-02-26T05:00:00Z 2020 2 2020-02-26T05:00:00Z   2020-02-26T16:12:12Z   0 0 09000064843b6a0f
FRA-2010-0051-0091 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q3 2019 PTC Progress Report Other Report 2019-11-26T05:00:00Z 2019 11 2019-11-26T05:00:00Z   2019-11-26T14:40:09Z   0 0 09000064841b7b46
FRA-2010-0051-0090 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA - Decision Other Decision 2019-10-01T04:00:00Z 2019 10 2019-10-01T04:00:00Z   2024-11-12T23:09:47Z   1 0 0900006483ff2b9f
FRA-2010-0051-0089 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q2 2019 PTC Progress Report Other Report 2019-09-11T04:00:00Z 2019 9 2019-09-11T04:00:00Z   2019-09-11T15:36:43Z   0 0 0900006483f38416
FRA-2010-0051-0088 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA - Decision Other Decision 2019-08-14T04:00:00Z 2019 8 2019-08-14T04:00:00Z   2024-11-12T23:06:51Z   1 0 0900006483e4e61b
FRA-2010-0051-0087 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board – “Caltrain” (PCJX/PCMZ) Q1 2019 PTC Progress Report Other Report 2019-05-30T04:00:00Z 2019 5 2019-06-11T04:00:00Z   2019-06-11T19:02:05Z   0 0 0900006483cd6725
FRA-2010-0051-0086 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board – “Caltrain” (PCJX/PCMZ) Q1 2019 PTC Progress Report Other Report 2019-05-30T04:00:00Z 2019 5 2019-05-30T04:00:00Z   2019-05-30T13:46:21Z   0 0 0900006483cd6845
FRA-2010-0051-0085 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 CALTRAIN RFA to its PTCIP APPROVAL Other Decision 2019-05-20T04:00:00Z 2019 5 2019-05-20T04:00:00Z   2024-11-12T23:01:23Z   1 0 0900006483ca2315
FRA-2010-0051-0084 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) 2018 Annual PTC Progress Report Other Report 2019-04-11T04:00:00Z 2019 4 2019-04-11T04:00:00Z   2019-04-11T13:53:19Z   0 0 0900006483b83592
FRA-2010-0051-0082 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q4 2018 PTC Progress Report Other Report 2019-02-15T05:00:00Z 2019 2 2019-02-15T05:00:00Z   2019-02-15T16:29:56Z   0 0 0900006483a7c303
FRA-2010-0051-0083 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ Alternative Schedule Request Artifact A - Onboard Other Report 2019-02-15T05:00:00Z 2019 2 2019-02-15T05:00:00Z   2019-02-15T17:33:54Z   0 0 0900006483a6f435
FRA-2010-0051-0079 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ Request for Amendment to the PTC Implementation Plan (PTCIP) v8.5 Other Report 2019-02-13T05:00:00Z 2019 2 2019-02-13T05:00:00Z   2019-02-13T19:02:51Z   0 0 0900006483a6e9a9
FRA-2010-0051-0081 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ Revised PTC Implemention Plan (PTCIP) v9.0 Other Report 2019-02-13T05:00:00Z 2019 2 2019-02-13T05:00:00Z   2019-02-13T19:03:15Z   0 0 0900006483a6e9e3
FRA-2010-0051-0080 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ Request for an Alternative Schedule and Sequence Other Report 2019-02-13T05:00:00Z 2019 2 2019-02-13T05:00:00Z   2019-02-13T19:03:03Z   0 0 0900006483a6e9e2
FRA-2010-0051-0078 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA - Decision Other Decision 2019-02-06T05:00:00Z 2019 2 2019-02-06T05:00:00Z   2024-11-12T22:54:46Z   1 0 0900006483a4b8ae
FRA-2010-0051-0077 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/ FRA - Letter Other Letter(s) 2018-11-30T05:00:00Z 2018 11 2018-11-30T05:00:00Z   2024-11-12T22:50:07Z   1 0 090000648391b6c1
FRA-2010-0051-0076 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain - At-risk PTC Letter (Q3 11-19-2018) Other Letter(s) 2018-11-29T05:00:00Z 2018 11 2018-11-29T05:00:00Z   2024-11-12T22:50:07Z   1 0 090000648390ca82
FRA-2010-0051-0075 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q3 2018 PTC Progress Report Other Report 2018-11-23T05:00:00Z 2018 11 2018-11-23T05:00:00Z   2018-11-23T15:28:30Z   0 0 09000064838f62df
FRA-2010-0051-0074 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA - Decision Other Decision 2018-11-13T05:00:00Z 2018 11 2018-11-13T05:00:00Z   2024-11-12T22:50:14Z   1 0 09000064838d1ef5
FRA-2010-0051-0073 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA - Decision Other Decision 2018-09-21T04:00:00Z 2018 9 2018-09-21T04:00:00Z   2024-11-07T01:38:10Z   1 0 09000064837403d4
FRA-2010-0051-0072 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 U.S.DOT/FRA- Response Other Response(s) 2018-09-19T04:00:00Z 2018 9 2018-09-19T04:00:00Z   2024-11-07T01:38:42Z   1 0 0900006483724f36
FRA-2010-0051-0071 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain RFA to PTCIP Approval Other   2018-09-12T00:00:00Z 2018 9     2024-11-07T01:38:15Z   0 1 09000064836e1c9c
FRA-2010-0051-0070 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Joint Powers Authority (Caltrain) I-ETMS Test Request – Conditional Approval Other Decision 2018-09-05T04:00:00Z 2018 9 2018-09-05T04:00:00Z   2024-11-07T01:36:52Z   1 0 09000064836a8c40
FRA-2010-0051-0069 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Signed Final Pennisula Corridor Joint Powers Board (CALTRAIN) At-Risk PTC Letter-Q2-2018- Other Letter(s) 2018-09-04T04:00:00Z 2018 9 2018-09-04T04:00:00Z   2018-09-04T15:09:20Z   0 0 09000064836980a6
FRA-2010-0051-0068 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q2 2018 PTC Progress Report Other Report 2018-08-24T04:00:00Z 2018 8 2018-08-24T04:00:00Z   2018-08-24T19:09:35Z   0 0 0900006483650ae2
FRA-2010-0051-0066 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (Caltrain) At-Risk PTC Letter (Quarter 1 of 2018) Other Report 2018-06-07T04:00:00Z 2018 6 2018-06-07T04:00:00Z   2018-06-07T14:12:53Z   0 0 0900006483363861
FRA-2010-0051-0067 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 California Department of Transportation - Notification At-Risk PTC Letter for Altamont Corridor Express and Peninsula Corridor Joint Powers Board (Caltrain) (Quarter 1 of 2018) Other Report 2018-06-07T04:00:00Z 2018 6 2018-06-07T04:00:00Z   2018-06-07T14:23:26Z   0 0 0900006483365117
FRA-2010-0051-0065 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q1 2018 PTC Progress Report Other Report 2018-05-17T04:00:00Z 2018 5 2018-05-17T04:00:00Z   2018-06-06T19:37:58Z   0 0 090000648326af2b
FRA-2010-0051-0064 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) 2017 Annual PTC Progress Report Other Report 2018-05-01T04:00:00Z 2018 5 2018-05-01T04:00:00Z   2018-05-01T19:07:21Z   0 0 09000064831c336d
FRA-2010-0051-0063 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 At-Risk PTC Letter-Peninsula Corridor Joint Powers Board Other Letter(s) 2018-04-26T04:00:00Z 2018 4 2018-04-26T04:00:00Z   2018-04-26T17:46:47Z   0 0 09000064831d2bc9
FRA-2010-0051-0062 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q4 2017 PTC Progress Report Other Report 2018-02-13T05:00:00Z 2018 2 2018-02-13T05:00:00Z   2018-02-13T15:51:47Z   0 0 0900006482f2b43b
FRA-2010-0051-0061 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q3 2017 PTC Progress Report Other Report 2017-12-01T05:00:00Z 2017 12 2017-12-01T05:00:00Z   2017-12-01T16:49:21Z   0 0 0900006482cc5830
FRA-2010-0051-0060 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q2 2017 PTC Progress Report Other Report 2017-08-15T04:00:00Z 2017 8 2017-08-15T04:00:00Z   2017-08-15T15:13:57Z   0 0 0900006482a3205d
FRA-2010-0051-0059 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q1 2017 PTC Progress Report Other Report 2017-05-17T04:00:00Z 2017 5 2017-05-17T04:00:00Z   2017-05-17T13:40:54Z   0 0 09000064825d0261
FRA-2010-0051-0058 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) 2016 Annual PTC Progress Report Other Report 2017-04-25T04:00:00Z 2017 4 2017-04-25T04:00:00Z   2017-04-25T18:08:26Z   0 0 0900006482574ae1
FRA-2010-0051-0056 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain (PCJX) PTC Implementation Plan (PTCIP) Version 7.0 Other Report 2017-03-10T05:00:00Z 2017 3 2017-03-10T05:00:00Z   2017-03-10T15:42:39Z   0 0 09000064824ffb12
FRA-2010-0051-0057 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain (PCJX) PTC Implementation Plan (PTCIP) Version 7.0 Other   2017-03-10T00:00:00Z 2017 3     2020-01-02T21:56:20Z   0 1 09000064824ff8c9
FRA-2010-0051-0055 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q4 2016 Quarterly PTC Progress Report Other Report 2017-02-15T05:00:00Z 2017 2 2017-02-15T05:00:00Z   2017-02-15T21:36:57Z   0 0 09000064824c44eb
FRA-2010-0051-0054 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 3rd Quarter 2016 PCMZ Quarterly PTC Progress Report Form (FRA F 6180.165) Other Report 2016-11-18T05:00:00Z 2016 11 2016-11-18T05:00:00Z   2016-11-18T14:38:17Z   0 0 09000064823a11e5
FRA-2010-0051-0053 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 PCMZ Quarterly PTC Progress Report Form (FRA F 6180 165) Other Report 2016-09-13T04:00:00Z 2016 9 2016-09-13T04:00:00Z   2016-09-13T15:46:22Z   0 0 0900006482205038
FRA-2010-0051-0052 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain Annual PTC Progress Report Form FRA F 6180 166 (Approved 3-16-16) Other Report 2016-04-29T04:00:00Z 2016 4 2016-04-29T04:00:00Z   2016-04-29T12:53:13Z   0 0 0900006481f98d2d
FRA-2010-0051-0050 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 FRA Cover Letter - Type Approval and ConOps Other Letter(s) 2015-08-21T04:00:00Z 2015 8 2015-08-21T04:00:00Z   2015-08-21T13:27:55Z   0 0 0900006481c1cc55
FRA-2010-0051-0049 FRA Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 Caltrain Test Waiver Request Rev 4 Track Changes Public Other Report 2015-08-21T04:00:00Z 2015 8 2015-08-21T04:00:00Z   2015-08-21T13:26:51Z   0 0 0900006481c1cc54

Next page

Advanced export

JSON shape: default, array, newline-delimited, object

CSV options:

CREATE TABLE documents (
    id TEXT PRIMARY KEY,
    agency_id TEXT,
    docket_id TEXT REFERENCES dockets(id),
    title TEXT,
    document_type TEXT,
    subtype TEXT,
    posted_date TEXT,
    posted_year INTEGER,
    posted_month INTEGER,
    comment_start_date TEXT,
    comment_end_date TEXT,
    last_modified TEXT,
    fr_doc_num TEXT,
    open_for_comment INTEGER,
    withdrawn INTEGER,
    object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;