documents
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
149 rows where docket_id = "FRA-2010-0051" sorted by posted_date descending
This data as json, CSV (advanced)
Suggested facets: subtype, posted_month, open_for_comment, withdrawn, posted_date (date), comment_start_date (date), comment_end_date (date), last_modified (date)
posted_year 16
agency_id 1
- FRA 149
| id | agency_id | docket_id | title | document_type | subtype | posted_date ▲ | posted_year | posted_month | comment_start_date | comment_end_date | last_modified | fr_doc_num | open_for_comment | withdrawn | object_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| FRA-2010-0051-0161 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | FRA Letter to I-ETMS Host Railroads Regarding Security final signed | Other | Letter(s) | 2026-02-19T05:00:00Z | 2026 | 2 | 2026-02-19T05:00:00Z | 2026-02-19T22:35:10Z | 0 | 0 | 09000064b91bf785 | ||
| FRA-2010-0051-0160 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-250903-007 Twenty-one Host Railroads Joint RFA to Their PTCSPs | Other | Decision | 2025-09-08T04:00:00Z | 2025 | 9 | 2025-09-08T04:00:00Z | 2025-09-08T23:36:48Z | 0 | 0 | 09000064b8f55a91 | ||
| FRA-2010-0051-0156 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint ITC RFA to PTCSP - July 2025 | Other | Petition(s) | 2025-08-04T04:00:00Z | 2025 | 8 | 2025-08-04T04:00:00Z | 2025-08-04T19:02:06Z | 0 | 0 | 09000064b8ecca66 | ||
| FRA-2010-0051-0155 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Joint Request for Amendment: Positive Train Control Safety Plans | Notice | Request for Comments | 2025-08-01T04:00:00Z | 2025 | 8 | 2025-08-01T04:00:00Z | 2025-08-22T03:59:59Z | 2025-08-23T09:00:28Z | 2025-14631 | 0 | 0 | 09000064b8ec6d8f |
| FRA-2010-0051-0154 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-250407-016 Caltrain's RFA to its PTCSP Approval-FRA-2010-0051 final signed | Other | Decision | 2025-04-16T04:00:00Z | 2025 | 4 | 2025-04-16T04:00:00Z | 2025-04-16T18:44:05Z | 1 | 0 | 0900006486a9861d | ||
| FRA-2010-0051-0153 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Request for Amendment: Peninsula Corridor Joint Powers Board; Positive Train Control Safety Plan and Positive Train Control System | Notice | Request for Comments | 2025-02-11T05:00:00Z | 2025 | 2 | 2025-02-11T05:00:00Z | 2025-03-04T04:59:59Z | 2025-02-11T13:20:47Z | 2025-02431 | 0 | 0 | 090000648694ca89 |
| FRA-2010-0051-0152 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain RFA to PTCSP – January 2025 | Other | Report | 2025-02-04T05:00:00Z | 2025 | 2 | 2025-02-04T05:00:00Z | 2025-02-04T14:30:55Z | 0 | 0 | 090000648692d88a | ||
| FRA-2010-0051-0148 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-240727-001 Caltrain's RFA to Its PTCSP Ver. 1.1 Approval-FRA-2010-0051 final signed | Other | Decision | 2024-08-06T04:00:00Z | 2024 | 8 | 2024-08-06T04:00:00Z | 2024-11-12T22:38:38Z | 1 | 0 | 0900006486620330 | ||
| FRA-2010-0051-0147 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Request for Amendment: Railroads' Joint Request to Amend Positive Train Control Safety Plans and Positive Train Control Systems | Notice | Request for Comments | 2024-07-30T04:00:00Z | 2024 | 7 | 2024-07-30T04:00:00Z | 2024-08-20T03:59:59Z | 2024-11-12T22:38:58Z | 2024-16750 | 1 | 0 | 090000648660e77d |
| FRA-2010-0051-0146 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-240717-003 Twenty-One Host Railroads ITC Joint RFA for OB 6.5.4.0 final signed | Other | Decision | 2024-07-23T04:00:00Z | 2024 | 7 | 2024-07-23T04:00:00Z | 2024-07-23T18:37:32Z | 0 | 0 | 09000064866034c6 | ||
| FRA-2010-0051-0142 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint RFA to PTCSP v1.0 – July 2024 | Other | Report | 2024-07-12T04:00:00Z | 2024 | 7 | 2024-07-12T04:00:00Z | 2024-07-12T18:20:38Z | 0 | 0 | 09000064865ec79d | ||
| FRA-2010-0051-0141 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Request for Amendment: Peninsula Corridor Joint Powers Board; Positive Train Control Safety Plan and Positive Train Control System | Notice | Request for Comments | 2024-06-28T04:00:00Z | 2024 | 6 | 2024-06-28T04:00:00Z | 2024-07-19T03:59:59Z | 2024-11-12T22:35:06Z | 2024-14298 | 1 | 0 | 09000064865d0c1d |
| FRA-2010-0051-0140 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain RFA to PTCSP v1.1 – June 2024 | Other | Report | 2024-06-20T04:00:00Z | 2024 | 6 | 2024-06-20T04:00:00Z | 2024-06-20T15:33:04Z | 0 | 0 | 09000064865c159a | ||
| FRA-2010-0051-0139 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Request for Amendment: Joint Request to Amend Positive Train Control Safety Plans | Notice | Request for Comments | 2024-06-20T04:00:00Z | 2024 | 6 | 2024-06-20T04:00:00Z | 2024-07-11T03:59:59Z | 2024-11-12T22:36:37Z | 2024-13481 | 1 | 0 | 09000064865c1123 |
| FRA-2010-0051-0138 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Jun 2024 | Other | Report | 2024-06-11T04:00:00Z | 2024 | 6 | 2024-06-11T04:00:00Z | 2024-06-11T15:09:50Z | 0 | 0 | 09000064865ac50b | ||
| FRA-2010-0051-0137 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ PTCIP v11.0 – April 2024 | Other | Report | 2024-05-31T04:00:00Z | 2024 | 5 | 2024-05-31T04:00:00Z | 2024-05-31T12:51:43Z | 0 | 0 | 090000648658e4d2 | ||
| FRA-2010-0051-0136 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-240507-007 Caltrain RFA to Its PTCIP 11.0 v.1 Approval-FRA-2010-0051 final signed | Other | Decision | 2024-05-24T04:00:00Z | 2024 | 5 | 2024-05-24T04:00:00Z | 2024-05-24T11:50:06Z | 0 | 0 | 0900006486580b09 | ||
| FRA-2010-0051-0135 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-231214-004 Twenty Host Railroads' Joint Request to Amend Their PTCSPs Approval final signed | Other | Request | 2023-12-18T05:00:00Z | 2023 | 12 | 2023-12-18T05:00:00Z | 2024-11-12T06:21:26Z | 1 | 0 | 0900006486343a74 | ||
| FRA-2010-0051-0133 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Joint Request to Amend Their Positive Train Control Safety Plans | Notice | Notice of Availability | 2023-11-13T05:00:00Z | 2023 | 11 | 2023-11-13T05:00:00Z | 2023-12-05T04:59:59Z | 2024-11-12T06:22:02Z | 2023-24973 | 1 | 0 | 090000648625e774 |
| FRA-2010-0051-0132 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Nov 2023 | Other | Report | 2023-11-07T05:00:00Z | 2023 | 11 | 2023-11-07T05:00:00Z | 2023-11-07T15:18:23Z | 0 | 0 | 090000648621988f | ||
| FRA-2010-0051-0131 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-230811-004 Nineteen Host Railroads Joint Request to Amend Their PTCSPs Denial Without Prejudice final signed | Other | Request | 2023-08-15T04:00:00Z | 2023 | 8 | 2023-08-15T04:00:00Z | 2024-11-07T00:46:16Z | 1 | 0 | 0900006485e3d3a0 | ||
| FRA-2010-0051-0128 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-230710-017 FRN Railroads Joint RFA to Their PTC Safety Plans and PTC Systems final | Other | Request | 2023-07-26T04:00:00Z | 2023 | 7 | 2023-07-26T04:00:00Z | 2024-11-07T23:39:46Z | 1 | 0 | 0900006485d548ac | ||
| FRA-2010-0051-0127 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems | Notice | Notice of Availability | 2023-07-19T04:00:00Z | 2023 | 7 | 2023-07-19T04:00:00Z | 2023-08-09T03:59:59Z | 2024-11-12T05:50:51Z | 2023-15231 | 1 | 0 | 0900006485cdeb26 |
| FRA-2010-0051-0126 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Jun 2023 | Other | Report | 2023-07-14T04:00:00Z | 2023 | 7 | 2023-07-14T04:00:00Z | 2023-07-14T20:46:04Z | 0 | 0 | 0900006485cb50c9 | ||
| FRA-2010-0051-0125 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Positive Train Control Network: Caltrain's Request for Approval to Begin Field Testing | Notice | Notice of Availability | 2023-06-27T04:00:00Z | 2023 | 6 | 2023-06-27T04:00:00Z | 2023-07-20T03:59:59Z | 2024-11-12T05:50:17Z | 2023-13644 | 1 | 0 | 0900006485bfd0cb |
| FRA-2010-0051-0124 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain Test Request – June 2023 | Other | Request | 2023-06-21T04:00:00Z | 2023 | 6 | 2023-06-21T04:00:00Z | 2023-06-21T18:33:44Z | 0 | 0 | 0900006485b973ab | ||
| FRA-2010-0051-0123 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-230505-006 Twenty Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Conditional Approval final signed | Other | Decision | 2023-05-09T04:00:00Z | 2023 | 5 | 2023-05-09T04:00:00Z | 2024-11-12T05:51:25Z | 1 | 0 | 09000064859e459b | ||
| FRA-2010-0051-0122 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Joint Request To Amend Their Positive Train Control Safety Plans and Positive Train Control Systems | Notice | Notice of Availability | 2023-04-11T04:00:00Z | 2023 | 4 | 2023-04-11T04:00:00Z | 2023-05-02T03:59:59Z | 2024-11-07T00:49:44Z | 2023-07558 | 1 | 0 | 090000648592c3ff |
| FRA-2010-0051-0121 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Mar 2023 | Other | Report | 2023-04-06T04:00:00Z | 2023 | 4 | 2023-04-06T04:00:00Z | 2023-04-06T19:49:43Z | 0 | 0 | 09000064858f464e | ||
| FRA-2010-0051-0120 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Jan 2023 | Other | 2023-01-26T00:00:00Z | 2023 | 1 | 2023-02-09T19:09:10Z | 0 | 1 | 090000648560cced | ||||
| FRA-2010-0051-0119 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-220728-001 Twenty Host Railroads' Joint Request to Amend for Mixed System to Their PTCSPs-Approval | Other | Agency Response | 2022-08-09T04:00:00Z | 2022 | 8 | 2022-08-09T04:00:00Z | 2024-11-12T23:43:40Z | 1 | 0 | 090000648522a326 | ||
| FRA-2010-0051-0118 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint I-ETMS Mixed RFA to PTCSP Onboard version 6.3.24.0 Jun 2022 | Other | Report | 2022-07-12T04:00:00Z | 2022 | 7 | 2022-07-12T04:00:00Z | 2022-07-12T13:51:49Z | 0 | 0 | 09000064851c310e | ||
| FRA-2010-0051-0117 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-220215-015 Peninsula Corridor Joint Powers Board (Caltrain) Crossing Optimization Project Test Request Approval-FRA- 2010-0051_signed | Other | Decision | 2022-03-09T05:00:00Z | 2022 | 3 | 2022-03-09T05:00:00Z | 2024-11-07T00:38:21Z | 1 | 0 | 0900006484fc1ef2 | ||
| FRA-2010-0051-0116 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-211223-014 Nineteen Host Railroads Joint Request to Amend Their Positive Train Control Safety Plans Approval final signed | Other | Additional Information | 2022-01-18T05:00:00Z | 2022 | 1 | 2022-01-18T05:00:00Z | 2022-01-20T13:10:26Z | 0 | 0 | 0900006484f23d4e | ||
| FRA-2010-0051-0115 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain's Request for Approval to Test Crossing Optimization on Its Positive Train Control Network | Notice | Request for Comments | 2021-12-15T05:00:00Z | 2021 | 12 | 2021-12-15T05:00:00Z | 2022-02-15T04:59:59Z | 2024-11-12T23:35:39Z | 2021-27125 | 1 | 0 | 0900006484ecb057 |
| FRA-2010-0051-0114 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCMZ) “Caltrain” | Other | Report | 2021-12-08T05:00:00Z | 2021 | 12 | 2021-12-08T05:00:00Z | 2021-12-08T17:13:43Z | 0 | 0 | 0900006484eb06b7 | ||
| FRA-2010-0051-0113 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-211025-008 19 Railroads Joint RFA (I-ETMS Mixed System) disapproval without prejudice | Other | Decision | 2021-10-26T04:00:00Z | 2021 | 10 | 2021-10-26T04:00:00Z | 2024-11-07T00:33:42Z | 1 | 0 | 0900006484df7d6b | ||
| FRA-2010-0051-0111 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems | Other | Report | 2021-09-28T04:00:00Z | 2021 | 9 | 2021-09-28T04:00:00Z | 2021-09-28T18:28:52Z | 0 | 0 | 0900006484daff23 | ||
| FRA-2010-0051-0112 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems | Notice | Request for Comments | 2021-09-24T04:00:00Z | 2021 | 9 | 2021-10-04T04:00:00Z | 2021-10-15T03:59:59Z | 2024-11-06T23:51:42Z | 2021-20640 | 1 | 0 | 0900006484db970b |
| FRA-2010-0051-0110 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-210907-007 Comments associated with the Nineteen Host Railroads Joint Request to Amend to Their Positive Train Control Safety Plans | Other | Letter(s) | 2021-09-16T04:00:00Z | 2021 | 9 | 2021-09-16T04:00:00Z | 2024-11-06T23:51:29Z | 1 | 0 | 0900006484d87d95 | ||
| FRA-2010-0051-0109 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 9-10-2021 | Other | Report | 2021-09-14T04:00:00Z | 2021 | 9 | 2021-09-14T04:00:00Z | 2021-09-17T19:08:51Z | 0 | 0 | 0900006484d7c8f5 | ||
| FRA-2010-0051-0108 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-210826-005 19 Railroads Decision Letter Approving Joint RFA (I-ETMS Mixed System) | Other | Decision | 2021-09-01T04:00:00Z | 2021 | 9 | 2021-09-01T04:00:00Z | 2021-09-01T21:33:30Z | 0 | 0 | 0900006484d3948a | ||
| FRA-2010-0051-0107 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | FRA-2010-0028-0235 (1) | Notice | Request for Comments | 2021-07-28T04:00:00Z | 2021 | 7 | 2021-07-28T04:00:00Z | 2021-08-17T03:59:59Z | 2024-11-06T23:49:54Z | 2021-15973 | 1 | 0 | 0900006484c14f88 |
| FRA-2010-0051-0106 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 7-16-2021 | Other | Additional Information | 2021-07-20T04:00:00Z | 2021 | 7 | 2021-07-20T04:00:00Z | 2021-07-20T14:37:13Z | 0 | 0 | 0900006484c03951 | ||
| FRA-2010-0051-0105 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ RFA to PTCIP and Revised PTCIP Version 10 - April 2019 | Other | Report | 2021-06-22T04:00:00Z | 2021 | 6 | 2021-06-22T04:00:00Z | 2021-07-20T15:07:50Z | 0 | 0 | 0900006484ba0403 | ||
| FRA-2010-0051-0103 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-210528-002 Decision Letter Approving Joint RFA (I-ETMS Mixed System) | Other | Decision | 2021-06-08T04:00:00Z | 2021 | 6 | 2021-06-08T04:00:00Z | 2024-11-12T23:31:05Z | 1 | 0 | 0900006484b5e075 | ||
| FRA-2010-0051-0104 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Railroads' Requests to Amend Their Positive Train Control Safety Plans and Positive Train Control Systems | Notice | Request for Comments | 2021-05-26T04:00:00Z | 2021 | 5 | 2021-05-26T04:00:00Z | 2021-06-08T03:59:59Z | 2024-11-12T23:31:17Z | 2021-11125 | 1 | 0 | 0900006484b5ffc9 |
| FRA-2010-0051-0102 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Joint RFA to Railroads' I-ETMS PTCSPs, Filed 4-23-2021 | Other | Report | 2021-04-27T04:00:00Z | 2021 | 4 | 2021-04-27T04:00:00Z | 2021-04-27T15:58:58Z | 0 | 0 | 0900006484ab8ce1 | ||
| FRA-2010-0051-0101 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q4 2020 PTC Progress Report | Other | Report | 2021-04-26T04:00:00Z | 2021 | 4 | 2021-04-26T04:00:00Z | 2021-04-26T15:35:05Z | 0 | 0 | 0900006484ab7284 | ||
| FRA-2010-0051-0100 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) 2020 Annual PTC Progress Report | Other | Report | 2021-04-24T04:00:00Z | 2021 | 4 | 2021-04-24T04:00:00Z | 2021-04-24T17:06:33Z | 0 | 0 | 0900006484ab54b4 | ||
| FRA-2010-0051-0099 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-201231-001 Peninsula Corridor Joint Powers Board (Caltrain) Two-Speed Check Field Test Request - Conditional Approval | Other | Decision | 2021-01-06T05:00:00Z | 2021 | 1 | 2021-01-06T05:00:00Z | 2021-01-06T15:24:27Z | 0 | 0 | 09000064849dfe16 | ||
| FRA-2010-0051-0098 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-201120-003 CALTRAINs CERTIFICATION of its I-ETMS and PTCSP APPROVAL | Other | Decision | 2020-12-17T05:00:00Z | 2020 | 12 | 2020-12-17T05:00:00Z | 2024-11-12T23:26:41Z | 1 | 0 | 09000064849a4370 | ||
| FRA-2010-0051-0097 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q3 2020 PTC Progress Report | Other | Report | 2020-11-17T05:00:00Z | 2020 | 11 | 2020-11-17T05:00:00Z | 2020-11-17T19:12:26Z | 0 | 0 | 0900006484964d01 | ||
| FRA-2010-0051-0096 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | RRS-200904-001 CALTRAIN PTCSP HAZARD LOG REQUEST | Other | Letter(s) | 2020-09-18T04:00:00Z | 2020 | 9 | 2020-09-18T04:00:00Z | 2024-11-12T23:25:58Z | 1 | 0 | 0900006484864885 | ||
| FRA-2010-0051-0095 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - 'Caltrain' (PCMZ) Q2 2020 PTC Progress Report | Other | Report | 2020-08-13T04:00:00Z | 2020 | 8 | 2020-08-13T04:00:00Z | 2020-08-13T14:43:41Z | 0 | 0 | 09000064847fc302 | ||
| FRA-2010-0051-0094 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - 'Caltrain' (PCJX-PCMZ) Q1 2020 PTC Progress Report | Other | Report | 2020-05-18T04:00:00Z | 2020 | 5 | 2020-05-18T04:00:00Z | 2020-05-18T14:20:35Z | 0 | 0 | 0900006484632314 | ||
| FRA-2010-0051-0093 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - 'Caltrain' (PCJX-PCMZ) 2019 Annual PTC Progress Report | Other | Report | 2020-04-03T04:00:00Z | 2020 | 4 | 2020-04-03T04:00:00Z | 2020-04-03T15:58:33Z | 0 | 0 | 0900006484486256 | ||
| FRA-2010-0051-0092 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q4 2019 PTC Progress Report | Other | Report | 2020-02-26T05:00:00Z | 2020 | 2 | 2020-02-26T05:00:00Z | 2020-02-26T16:12:12Z | 0 | 0 | 09000064843b6a0f | ||
| FRA-2010-0051-0091 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q3 2019 PTC Progress Report | Other | Report | 2019-11-26T05:00:00Z | 2019 | 11 | 2019-11-26T05:00:00Z | 2019-11-26T14:40:09Z | 0 | 0 | 09000064841b7b46 | ||
| FRA-2010-0051-0090 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA - Decision | Other | Decision | 2019-10-01T04:00:00Z | 2019 | 10 | 2019-10-01T04:00:00Z | 2024-11-12T23:09:47Z | 1 | 0 | 0900006483ff2b9f | ||
| FRA-2010-0051-0089 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - “Caltrain” (PCJX/PCMZ) Q2 2019 PTC Progress Report | Other | Report | 2019-09-11T04:00:00Z | 2019 | 9 | 2019-09-11T04:00:00Z | 2019-09-11T15:36:43Z | 0 | 0 | 0900006483f38416 | ||
| FRA-2010-0051-0088 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA - Decision | Other | Decision | 2019-08-14T04:00:00Z | 2019 | 8 | 2019-08-14T04:00:00Z | 2024-11-12T23:06:51Z | 1 | 0 | 0900006483e4e61b | ||
| FRA-2010-0051-0087 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board – “Caltrain” (PCJX/PCMZ) Q1 2019 PTC Progress Report | Other | Report | 2019-05-30T04:00:00Z | 2019 | 5 | 2019-06-11T04:00:00Z | 2019-06-11T19:02:05Z | 0 | 0 | 0900006483cd6725 | ||
| FRA-2010-0051-0086 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board – “Caltrain” (PCJX/PCMZ) Q1 2019 PTC Progress Report | Other | Report | 2019-05-30T04:00:00Z | 2019 | 5 | 2019-05-30T04:00:00Z | 2019-05-30T13:46:21Z | 0 | 0 | 0900006483cd6845 | ||
| FRA-2010-0051-0085 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | CALTRAIN RFA to its PTCIP APPROVAL | Other | Decision | 2019-05-20T04:00:00Z | 2019 | 5 | 2019-05-20T04:00:00Z | 2024-11-12T23:01:23Z | 1 | 0 | 0900006483ca2315 | ||
| FRA-2010-0051-0084 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) 2018 Annual PTC Progress Report | Other | Report | 2019-04-11T04:00:00Z | 2019 | 4 | 2019-04-11T04:00:00Z | 2019-04-11T13:53:19Z | 0 | 0 | 0900006483b83592 | ||
| FRA-2010-0051-0082 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCMZ) Q4 2018 PTC Progress Report | Other | Report | 2019-02-15T05:00:00Z | 2019 | 2 | 2019-02-15T05:00:00Z | 2019-02-15T16:29:56Z | 0 | 0 | 0900006483a7c303 | ||
| FRA-2010-0051-0083 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ Alternative Schedule Request Artifact A - Onboard | Other | Report | 2019-02-15T05:00:00Z | 2019 | 2 | 2019-02-15T05:00:00Z | 2019-02-15T17:33:54Z | 0 | 0 | 0900006483a6f435 | ||
| FRA-2010-0051-0079 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ Request for Amendment to the PTC Implementation Plan (PTCIP) v8.5 | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T19:02:51Z | 0 | 0 | 0900006483a6e9a9 | ||
| FRA-2010-0051-0081 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ Revised PTC Implemention Plan (PTCIP) v9.0 | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T19:03:15Z | 0 | 0 | 0900006483a6e9e3 | ||
| FRA-2010-0051-0080 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ Request for an Alternative Schedule and Sequence | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T19:03:03Z | 0 | 0 | 0900006483a6e9e2 | ||
| FRA-2010-0051-0078 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA - Decision | Other | Decision | 2019-02-06T05:00:00Z | 2019 | 2 | 2019-02-06T05:00:00Z | 2024-11-12T22:54:46Z | 1 | 0 | 0900006483a4b8ae | ||
| FRA-2010-0051-0077 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/ FRA - Letter | Other | Letter(s) | 2018-11-30T05:00:00Z | 2018 | 11 | 2018-11-30T05:00:00Z | 2024-11-12T22:50:07Z | 1 | 0 | 090000648391b6c1 | ||
| FRA-2010-0051-0076 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain - At-risk PTC Letter (Q3 11-19-2018) | Other | Letter(s) | 2018-11-29T05:00:00Z | 2018 | 11 | 2018-11-29T05:00:00Z | 2024-11-12T22:50:07Z | 1 | 0 | 090000648390ca82 | ||
| FRA-2010-0051-0075 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q3 2018 PTC Progress Report | Other | Report | 2018-11-23T05:00:00Z | 2018 | 11 | 2018-11-23T05:00:00Z | 2018-11-23T15:28:30Z | 0 | 0 | 09000064838f62df | ||
| FRA-2010-0051-0074 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA - Decision | Other | Decision | 2018-11-13T05:00:00Z | 2018 | 11 | 2018-11-13T05:00:00Z | 2024-11-12T22:50:14Z | 1 | 0 | 09000064838d1ef5 | ||
| FRA-2010-0051-0073 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA - Decision | Other | Decision | 2018-09-21T04:00:00Z | 2018 | 9 | 2018-09-21T04:00:00Z | 2024-11-07T01:38:10Z | 1 | 0 | 09000064837403d4 | ||
| FRA-2010-0051-0072 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | U.S.DOT/FRA- Response | Other | Response(s) | 2018-09-19T04:00:00Z | 2018 | 9 | 2018-09-19T04:00:00Z | 2024-11-07T01:38:42Z | 1 | 0 | 0900006483724f36 | ||
| FRA-2010-0051-0071 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain RFA to PTCIP Approval | Other | 2018-09-12T00:00:00Z | 2018 | 9 | 2024-11-07T01:38:15Z | 0 | 1 | 09000064836e1c9c | ||||
| FRA-2010-0051-0070 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Joint Powers Authority (Caltrain) I-ETMS Test Request – Conditional Approval | Other | Decision | 2018-09-05T04:00:00Z | 2018 | 9 | 2018-09-05T04:00:00Z | 2024-11-07T01:36:52Z | 1 | 0 | 09000064836a8c40 | ||
| FRA-2010-0051-0069 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Signed Final Pennisula Corridor Joint Powers Board (CALTRAIN) At-Risk PTC Letter-Q2-2018- | Other | Letter(s) | 2018-09-04T04:00:00Z | 2018 | 9 | 2018-09-04T04:00:00Z | 2018-09-04T15:09:20Z | 0 | 0 | 09000064836980a6 | ||
| FRA-2010-0051-0068 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q2 2018 PTC Progress Report | Other | Report | 2018-08-24T04:00:00Z | 2018 | 8 | 2018-08-24T04:00:00Z | 2018-08-24T19:09:35Z | 0 | 0 | 0900006483650ae2 | ||
| FRA-2010-0051-0066 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (Caltrain) At-Risk PTC Letter (Quarter 1 of 2018) | Other | Report | 2018-06-07T04:00:00Z | 2018 | 6 | 2018-06-07T04:00:00Z | 2018-06-07T14:12:53Z | 0 | 0 | 0900006483363861 | ||
| FRA-2010-0051-0067 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | California Department of Transportation - Notification At-Risk PTC Letter for Altamont Corridor Express and Peninsula Corridor Joint Powers Board (Caltrain) (Quarter 1 of 2018) | Other | Report | 2018-06-07T04:00:00Z | 2018 | 6 | 2018-06-07T04:00:00Z | 2018-06-07T14:23:26Z | 0 | 0 | 0900006483365117 | ||
| FRA-2010-0051-0065 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) Q1 2018 PTC Progress Report | Other | Report | 2018-05-17T04:00:00Z | 2018 | 5 | 2018-05-17T04:00:00Z | 2018-06-06T19:37:58Z | 0 | 0 | 090000648326af2b | ||
| FRA-2010-0051-0064 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board - Caltrain (PCJX/PCMZ) 2017 Annual PTC Progress Report | Other | Report | 2018-05-01T04:00:00Z | 2018 | 5 | 2018-05-01T04:00:00Z | 2018-05-01T19:07:21Z | 0 | 0 | 09000064831c336d | ||
| FRA-2010-0051-0063 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | At-Risk PTC Letter-Peninsula Corridor Joint Powers Board | Other | Letter(s) | 2018-04-26T04:00:00Z | 2018 | 4 | 2018-04-26T04:00:00Z | 2018-04-26T17:46:47Z | 0 | 0 | 09000064831d2bc9 | ||
| FRA-2010-0051-0062 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q4 2017 PTC Progress Report | Other | Report | 2018-02-13T05:00:00Z | 2018 | 2 | 2018-02-13T05:00:00Z | 2018-02-13T15:51:47Z | 0 | 0 | 0900006482f2b43b | ||
| FRA-2010-0051-0061 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q3 2017 PTC Progress Report | Other | Report | 2017-12-01T05:00:00Z | 2017 | 12 | 2017-12-01T05:00:00Z | 2017-12-01T16:49:21Z | 0 | 0 | 0900006482cc5830 | ||
| FRA-2010-0051-0060 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q2 2017 PTC Progress Report | Other | Report | 2017-08-15T04:00:00Z | 2017 | 8 | 2017-08-15T04:00:00Z | 2017-08-15T15:13:57Z | 0 | 0 | 0900006482a3205d | ||
| FRA-2010-0051-0059 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q1 2017 PTC Progress Report | Other | Report | 2017-05-17T04:00:00Z | 2017 | 5 | 2017-05-17T04:00:00Z | 2017-05-17T13:40:54Z | 0 | 0 | 09000064825d0261 | ||
| FRA-2010-0051-0058 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) 2016 Annual PTC Progress Report | Other | Report | 2017-04-25T04:00:00Z | 2017 | 4 | 2017-04-25T04:00:00Z | 2017-04-25T18:08:26Z | 0 | 0 | 0900006482574ae1 | ||
| FRA-2010-0051-0056 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain (PCJX) PTC Implementation Plan (PTCIP) Version 7.0 | Other | Report | 2017-03-10T05:00:00Z | 2017 | 3 | 2017-03-10T05:00:00Z | 2017-03-10T15:42:39Z | 0 | 0 | 09000064824ffb12 | ||
| FRA-2010-0051-0057 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain (PCJX) PTC Implementation Plan (PTCIP) Version 7.0 | Other | 2017-03-10T00:00:00Z | 2017 | 3 | 2020-01-02T21:56:20Z | 0 | 1 | 09000064824ff8c9 | ||||
| FRA-2010-0051-0055 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Peninsula Corridor Joint Powers Board (PCJX/PCMZ) Q4 2016 Quarterly PTC Progress Report | Other | Report | 2017-02-15T05:00:00Z | 2017 | 2 | 2017-02-15T05:00:00Z | 2017-02-15T21:36:57Z | 0 | 0 | 09000064824c44eb | ||
| FRA-2010-0051-0054 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | 3rd Quarter 2016 PCMZ Quarterly PTC Progress Report Form (FRA F 6180.165) | Other | Report | 2016-11-18T05:00:00Z | 2016 | 11 | 2016-11-18T05:00:00Z | 2016-11-18T14:38:17Z | 0 | 0 | 09000064823a11e5 | ||
| FRA-2010-0051-0053 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | PCMZ Quarterly PTC Progress Report Form (FRA F 6180 165) | Other | Report | 2016-09-13T04:00:00Z | 2016 | 9 | 2016-09-13T04:00:00Z | 2016-09-13T15:46:22Z | 0 | 0 | 0900006482205038 | ||
| FRA-2010-0051-0052 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain Annual PTC Progress Report Form FRA F 6180 166 (Approved 3-16-16) | Other | Report | 2016-04-29T04:00:00Z | 2016 | 4 | 2016-04-29T04:00:00Z | 2016-04-29T12:53:13Z | 0 | 0 | 0900006481f98d2d | ||
| FRA-2010-0051-0050 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | FRA Cover Letter - Type Approval and ConOps | Other | Letter(s) | 2015-08-21T04:00:00Z | 2015 | 8 | 2015-08-21T04:00:00Z | 2015-08-21T13:27:55Z | 0 | 0 | 0900006481c1cc55 | ||
| FRA-2010-0051-0049 | FRA | Peninsula Corridor Joint Powers Board - Positive Train Control Plans FRA-2010-0051 | Caltrain Test Waiver Request Rev 4 Track Changes Public | Other | Report | 2015-08-21T04:00:00Z | 2015 | 8 | 2015-08-21T04:00:00Z | 2015-08-21T13:26:51Z | 0 | 0 | 0900006481c1cc54 |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE documents (
id TEXT PRIMARY KEY,
agency_id TEXT,
docket_id TEXT REFERENCES dockets(id),
title TEXT,
document_type TEXT,
subtype TEXT,
posted_date TEXT,
posted_year INTEGER,
posted_month INTEGER,
comment_start_date TEXT,
comment_end_date TEXT,
last_modified TEXT,
fr_doc_num TEXT,
open_for_comment INTEGER,
withdrawn INTEGER,
object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;