documents
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
96 rows where docket_id = "FRA-2010-0033" sorted by posted_date descending
This data as json, CSV (advanced)
Suggested facets: subtype, posted_month, open_for_comment, posted_date (date), comment_start_date (date), comment_end_date (date), last_modified (date)
posted_year 14
agency_id 1
- FRA 96
| id | agency_id | docket_id | title | document_type | subtype | posted_date ▲ | posted_year | posted_month | comment_start_date | comment_end_date | last_modified | fr_doc_num | open_for_comment | withdrawn | object_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| FRA-2010-0033-0096 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-240408-003 B2B Functionality for ACSES II and ASES II-FRA-2010-0029-0030-0031-0033 and 0036 final signed | Other | Decision | 2024-04-22T04:00:00Z | 2024 | 4 | 2024-04-22T04:00:00Z | 2024-04-22T12:03:27Z | 0 | 0 | 09000064864e3975 | ||
| FRA-2010-0033-0097 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | ENCLOSURE-RRS-240408-003 | Other | Exhibit(s) | 2024-04-22T04:00:00Z | 2024 | 4 | 2024-04-22T04:00:00Z | 2024-04-22T12:05:55Z | 0 | 0 | 09000064864e3977 | ||
| FRA-2010-0033-0095 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-231120-025 NJTs RFA to Its PTC System Temporary Outage for Maintenance or Upgrade Purposes Conditional Approval-FRA-2010-0033 final signed | Other | Decision | 2023-11-28T05:00:00Z | 2023 | 11 | 2023-11-28T05:00:00Z | 2024-11-12T06:23:29Z | 1 | 0 | 09000064862be544 | ||
| FRA-2010-0033-0094 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | Positive Train Control System: New Jersey Transit's Request to Amend | Notice | Notice of Availability | 2023-10-26T04:00:00Z | 2023 | 10 | 2023-10-26T04:00:00Z | 2023-11-14T04:59:59Z | 2024-11-12T06:19:28Z | 2023-23635 | 1 | 0 | 090000648614011d |
| FRA-2010-0033-0093 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Request for Temporary Outage – October 2023 | Other | Request | 2023-10-16T04:00:00Z | 2023 | 10 | 2023-10-16T04:00:00Z | 2023-10-16T20:11:47Z | 0 | 0 | 09000064860f2da3 | ||
| FRA-2010-0033-0092 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-220926-009 Back 2 Back Functionality Requirements for ACSES II and ASES II-Several Dockets final_signed | Other | Letter(s) | 2022-09-29T04:00:00Z | 2022 | 9 | 2022-09-29T04:00:00Z | 2024-11-07T00:43:02Z | 1 | 0 | 0900006485381415 | ||
| FRA-2010-0033-0091 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-220215-003 NJT's RFA to its PTCSP Approval FRA-2010-0033_signed | Other | Decision | 2022-03-01T05:00:00Z | 2022 | 3 | 2022-03-01T05:00:00Z | 2024-11-12T23:38:32Z | 1 | 0 | 0900006484fb0074 | ||
| FRA-2010-0033-0090 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit's Request to Amend Its Positive Train Control Safety Plan and Positive Train Control System | Notice | Request for Comments | 2022-02-07T05:00:00Z | 2022 | 2 | 2022-02-07T05:00:00Z | 2022-03-01T04:59:59Z | 2024-11-07T00:34:58Z | 2022-02512 | 1 | 0 | 0900006484f58893 |
| FRA-2010-0033-0089 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR RFA to PTCSP and Revised PTCSP Revision 1.0 – Jan 2022 | Other | Report | 2022-01-18T05:00:00Z | 2022 | 1 | 2022-01-18T05:00:00Z | 2022-01-18T19:34:42Z | 0 | 0 | 0900006484f25442 | ||
| FRA-2010-0033-0088 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR RFA to PTCIP and Revised PTCIP Version 10.1 - December 2020 | Other | Report | 2021-06-22T04:00:00Z | 2021 | 6 | 2021-06-22T04:00:00Z | 2021-07-06T13:18:16Z | 0 | 0 | 0900006484ba00c1 | ||
| FRA-2010-0033-0087 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q4 2020 PTC Progress Report | Other | Report | 2021-04-26T04:00:00Z | 2021 | 4 | 2021-04-26T04:00:00Z | 2021-04-26T15:23:05Z | 0 | 0 | 0900006484ab725e | ||
| FRA-2010-0033-0086 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) 2020 Annual PTC Progress Report | Other | Report | 2021-04-24T04:00:00Z | 2021 | 4 | 2021-04-24T04:00:00Z | 2021-04-24T16:51:27Z | 0 | 0 | 0900006484ab5983 | ||
| FRA-2010-0033-0084 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-201208-003 NJT RFA to Its PTCIPVer. 10.1 Approval | Other | Decision | 2020-12-21T05:00:00Z | 2020 | 12 | 2020-12-21T05:00:00Z | 2024-11-12T23:27:16Z | 1 | 0 | 09000064849b12e2 | ||
| FRA-2010-0033-0085 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-201203-002 NJTs PTCSP Conditional Approval Conditional Certification of Its ASES II and Certification of Its I-ETMS | Other | Decision | 2020-12-21T05:00:00Z | 2020 | 12 | 2020-12-21T05:00:00Z | 2024-11-12T23:27:16Z | 1 | 0 | 09000064849b12e5 | ||
| FRA-2010-0033-0082 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit’s Request for Amendment to Its Positive Train Control Implementation Plan -Approval Letter | Other | Letter(s) | 2020-12-18T05:00:00Z | 2020 | 12 | 2020-12-18T05:00:00Z | 2020-12-18T15:34:46Z | 0 | 0 | 09000064849a749b | ||
| FRA-2010-0033-0083 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit’s Positive Train Control Safety Plan – Conditional Approval, Conditional Certification of Its Advanced Speed Enforcement System II, and Certification of Its Interoperable Electronic Train Management System | Other | Letter(s) | 2020-12-18T05:00:00Z | 2020 | 12 | 2020-12-18T05:00:00Z | 2020-12-18T15:41:11Z | 0 | 0 | 09000064849a7d55 | ||
| FRA-2010-0033-0081 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-201201-010 AMTRAK-NJT-CONRAIL STS BOUNDARY MITIGATION APPROVAl-FRA-2010-0029FRA-2010-0033 and FRA-2010-0064 signed | Other | Decision | 2020-12-15T05:00:00Z | 2020 | 12 | 2020-12-15T05:00:00Z | 2024-11-06T23:43:15Z | 1 | 0 | 090000648499e747 | ||
| FRA-2010-0033-0080 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | At-Risk Letter to NJT Gov't Officials and Other Stakeholders | Other | Letter(s) | 2020-11-24T05:00:00Z | 2020 | 11 | 2020-11-24T05:00:00Z | 2020-11-24T16:55:54Z | 0 | 0 | 0900006484973f3a | ||
| FRA-2010-0033-0079 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q3 2020 PTC Progress Report | Other | Report | 2020-11-17T05:00:00Z | 2020 | 11 | 2020-11-17T05:00:00Z | 2020-11-17T19:04:02Z | 0 | 0 | 0900006484964b51 | ||
| FRA-2010-0033-0078 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q2 2020 PTC Progress Report | Other | Report | 2020-08-13T04:00:00Z | 2020 | 8 | 2020-08-13T04:00:00Z | 2020-08-13T14:36:35Z | 0 | 0 | 09000064847fc2bc | ||
| FRA-2010-0033-0077 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-200720-004 NJT PTCSP Acknowledgement Letter | Other | Acknowledgement Letter/Receipt | 2020-07-30T04:00:00Z | 2020 | 7 | 2020-07-30T04:00:00Z | 2024-11-06T23:38:30Z | 1 | 0 | 09000064847c027b | ||
| FRA-2010-0033-0076 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | RRS-200714-002 NJT RFA to its PTCIP Rev. 10.0 APROVAL LETTER | Other | Decision | 2020-07-23T04:00:00Z | 2020 | 7 | 2020-07-23T04:00:00Z | 2024-11-06T23:38:47Z | 1 | 0 | 090000648479ebe3 | ||
| FRA-2010-0033-0075 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | US DOT/FRA-NJTR - Letter to Governor and State | Other | Action Memo or Letter | 2020-05-26T04:00:00Z | 2020 | 5 | 2020-05-26T04:00:00Z | 2020-05-26T13:18:25Z | 0 | 0 | 09000064846ac90d | ||
| FRA-2010-0033-0074 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | US DOT/FRA - Letter to Executive Director | Other | Action Memo or Letter | 2020-05-26T04:00:00Z | 2020 | 5 | 2020-05-26T04:00:00Z | 2020-05-26T12:38:11Z | 0 | 0 | 09000064846abc52 | ||
| FRA-2010-0033-0073 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transity Railroad (NJTR) Q1 2020 PTC Progress Report | Other | Report | 2020-05-15T04:00:00Z | 2020 | 5 | 2020-05-15T04:00:00Z | 2020-05-15T21:10:20Z | 0 | 0 | 090000648460f2d5 | ||
| FRA-2010-0033-0072 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) 2019 Annual PTC Progress Report | Other | Report | 2020-04-03T04:00:00Z | 2020 | 4 | 2020-04-03T04:00:00Z | 2020-04-03T15:15:59Z | 0 | 0 | 0900006484486042 | ||
| FRA-2010-0033-0071 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | FRA PTC Letter to New Jersey Governor | Other | Letter(s) | 2020-02-27T05:00:00Z | 2020 | 2 | 2020-02-27T05:00:00Z | 2024-11-06T23:32:16Z | 1 | 0 | 09000064843bee07 | ||
| FRA-2010-0033-0070 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q4 2019 PTC Progress Report | Other | Report | 2020-02-26T05:00:00Z | 2020 | 2 | 2020-02-26T05:00:00Z | 2020-02-26T16:03:11Z | 0 | 0 | 09000064843b6986 | ||
| FRA-2010-0033-0069 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJT ASES II RSD Request Conditional Approval | Other | Decision | 2020-02-18T05:00:00Z | 2020 | 2 | 2020-02-18T05:00:00Z | 2024-11-12T23:17:20Z | 1 | 0 | 0900006484380978 | ||
| FRA-2010-0033-0068 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Decision | Other | Decision | 2020-01-24T05:00:00Z | 2020 | 1 | 2020-01-24T05:00:00Z | 2024-11-12T23:15:52Z | 1 | 0 | 09000064842ec627 | ||
| FRA-2010-0033-0066 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q3 2019 PTC Progress Report | Other | Report | 2019-11-26T05:00:00Z | 2019 | 11 | 2019-11-26T05:00:00Z | 2019-11-26T14:07:52Z | 0 | 0 | 09000064841b792e | ||
| FRA-2010-0033-0067 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q3 2019 PTC Progress Report | Other | Report | 2019-11-26T05:00:00Z | 2019 | 11 | 2019-11-26T05:00:00Z | 2019-11-26T14:32:13Z | 0 | 0 | 09000064841b7af8 | ||
| FRA-2010-0033-0065 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Decision | Other | Decision | 2019-10-03T04:00:00Z | 2019 | 10 | 2019-10-03T04:00:00Z | 2024-11-12T23:09:40Z | 1 | 0 | 090000648401b17f | ||
| FRA-2010-0033-0064 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q2 2019 PTC Progress Report | Other | Report | 2019-09-10T04:00:00Z | 2019 | 9 | 2019-09-10T04:00:00Z | 2019-09-10T19:55:01Z | 0 | 0 | 0900006483f2d0ed | ||
| FRA-2010-0033-0063 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q1 2019 PTC Progress Report | Other | Report | 2019-05-30T04:00:00Z | 2019 | 5 | 2019-05-30T04:00:00Z | 2019-05-30T13:24:58Z | 0 | 0 | 0900006483cd5fbc | ||
| FRA-2010-0033-0062 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) 2018 Annual PTC Progress Report | Other | Report | 2019-04-10T04:00:00Z | 2019 | 4 | 2019-04-10T04:00:00Z | 2019-04-10T20:28:24Z | 0 | 0 | 0900006483b80570 | ||
| FRA-2010-0033-0056 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Request for an Alternative Schedule and Sequence with Supporting Artifacts | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:28Z | 0 | 0 | 0900006483acdf96 | ||
| FRA-2010-0033-0059 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Revised PTC Implementation Plan (PTCIP) Rev 8.0 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:31Z | 0 | 0 | 0900006483acdf93 | ||
| FRA-2010-0033-0060 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Request for Amendment to the PTC Implementation Plan (PTCIP) v8.0 Table of Edits | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:32Z | 0 | 0 | 0900006483acdf92 | ||
| FRA-2010-0033-0058 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Revised PTC Implementation Plan (PTCIP) Rev 8.1 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:30Z | 0 | 0 | 0900006483acdf94 | ||
| FRA-2010-0033-0057 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Request for Amendment to the PTC Implementation Plan (PTCIP) v8.1 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:29Z | 0 | 0 | 0900006483acdf95 | ||
| FRA-2010-0033-0061 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Request for Amendment to the PTC Implementation Plan (PTCIP) v8.0 | Other | Report | 2019-03-08T05:00:00Z | 2019 | 3 | 2019-03-08T05:00:00Z | 2019-03-08T14:14:32Z | 0 | 0 | 0900006483acdf91 | ||
| FRA-2010-0033-0055 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Decision | Other | Decision | 2019-02-25T05:00:00Z | 2019 | 2 | 2019-02-25T05:00:00Z | 2019-02-25T21:18:56Z | 0 | 0 | 0900006483aa525d | ||
| FRA-2010-0033-0054 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q4 2018 PTC Progress Report | Other | Report | 2019-02-15T05:00:00Z | 2019 | 2 | 2019-02-15T05:00:00Z | 2019-02-15T16:15:40Z | 0 | 0 | 0900006483a7c11b | ||
| FRA-2010-0033-0052 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | US DOT/ FRA Response to NJT's Response to FRA Conditions of Approval for Substitute Criteria | Other | Response(s) | 2018-12-14T05:00:00Z | 2018 | 12 | 2018-12-14T05:00:00Z | 2018-12-14T19:40:03Z | 0 | 0 | 0900006483995fa9 | ||
| FRA-2010-0033-0051 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/ FRA - Letter | Other | Letter(s) | 2018-11-30T05:00:00Z | 2018 | 11 | 2018-11-30T05:00:00Z | 2018-11-30T18:06:01Z | 0 | 0 | 090000648391b592 | ||
| FRA-2010-0033-0050 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJT - At-risk PTC Letter (Q3 11-19-2018) | Other | Letter(s) | 2018-11-29T05:00:00Z | 2018 | 11 | 2018-11-29T05:00:00Z | 2024-11-12T22:50:11Z | 1 | 0 | 090000648390ca89 | ||
| FRA-2010-0033-0049 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q3 2018 PTC Progress Report | Other | Report | 2018-11-23T05:00:00Z | 2018 | 11 | 2018-11-23T05:00:00Z | 2018-11-23T15:19:29Z | 0 | 0 | 09000064838f6284 | ||
| FRA-2010-0033-0047 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/DFRA - Decision | Other | Decision | 2018-10-29T04:00:00Z | 2018 | 10 | 2018-10-29T04:00:00Z | 2024-11-07T01:06:16Z | 1 | 0 | 09000064838631ea | ||
| FRA-2010-0033-0048 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - Decision | Other | Decision | 2018-10-29T04:00:00Z | 2018 | 10 | 2018-10-29T04:00:00Z | 2024-11-07T01:05:44Z | 1 | 0 | 0900006483863620 | ||
| FRA-2010-0033-0046 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Response | Other | Response(s) | 2018-09-19T04:00:00Z | 2018 | 9 | 2018-09-19T04:00:00Z | 2024-11-07T01:37:46Z | 1 | 0 | 0900006483725439 | ||
| FRA-2010-0033-0045 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | Signed Final New Jersey Transit At-Risk PTC Letter Q2-2018-FRA- | Other | Letter(s) | 2018-09-04T04:00:00Z | 2018 | 9 | 2018-09-04T04:00:00Z | 2018-09-04T15:05:40Z | 0 | 0 | 09000064836980a4 | ||
| FRA-2010-0033-0044 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q2 2018 PTC Progress Report | Other | Report | 2018-08-24T04:00:00Z | 2018 | 8 | 2018-08-24T04:00:00Z | 2018-08-24T14:04:06Z | 0 | 0 | 0900006483650805 | ||
| FRA-2010-0033-0043 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | Approval for NJT RFA to PTCIP ver. 6 | Other | Decision | 2018-07-19T04:00:00Z | 2018 | 7 | 2018-07-19T04:00:00Z | 2024-11-07T23:54:54Z | 1 | 0 | 090000648352240d | ||
| FRA-2010-0033-0042 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit ASES II Field Testing RFA Approval | Other | Decision | 2018-07-05T04:00:00Z | 2018 | 7 | 2018-07-05T04:00:00Z | 2024-11-07T01:33:51Z | 1 | 0 | 09000064834b0ada | ||
| FRA-2010-0033-0041 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Conditional Approval for New Jersey Transit Request for Substitute Criteria | Other | Decision | 2018-06-26T04:00:00Z | 2018 | 6 | 2018-06-26T04:00:00Z | 2024-11-07T01:33:23Z | 1 | 0 | 0900006483463004 | ||
| FRA-2010-0033-0040 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit At-Risk PTC Letter Quarter 1 of 2018 | Other | Report | 2018-06-07T04:00:00Z | 2018 | 6 | 2018-06-11T04:00:00Z | 2018-06-11T16:59:49Z | 0 | 0 | 090000648336373a | ||
| FRA-2010-0033-0038 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit - Request for Alternative Criterion | Other | Request | 2018-05-31T04:00:00Z | 2018 | 5 | 2018-05-31T04:00:00Z | 2024-11-07T01:30:23Z | 1 | 0 | 0900006483316ba9 | ||
| FRA-2010-0033-0039 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad’s (NJTR) Request for Alternative Criteria (May 8 2018 | Other | Report | 2018-05-31T04:00:00Z | 2018 | 5 | 2018-05-31T04:00:00Z | 2018-05-31T14:58:36Z | 0 | 0 | 09000064832ed3fb | ||
| FRA-2010-0033-0037 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q1 2018 PTC Progress Report | Other | Report | 2018-05-15T04:00:00Z | 2018 | 5 | 2018-05-15T04:00:00Z | 2018-05-15T19:58:03Z | 0 | 0 | 090000648326aca2 | ||
| FRA-2010-0033-0036 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | At-Risk PTC Letter-New Jersey Transit-FRA | Other | Letter(s) | 2018-05-09T04:00:00Z | 2018 | 5 | 2018-05-09T04:00:00Z | 2024-11-07T01:28:30Z | 1 | 0 | 09000064831d33ea | ||
| FRA-2010-0033-0035 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - New Jersey Transit At-Risk PTC Letter dated April 24, 2018 | Other | Letter(s) | 2018-04-27T04:00:00Z | 2018 | 4 | 2018-04-27T04:00:00Z | 2024-11-07T01:25:56Z | 1 | 0 | 09000064831f3678 | ||
| FRA-2010-0033-0034 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) 2017 Annual PTC Progress Report | Other | Report | 2018-04-02T04:00:00Z | 2018 | 4 | 2018-04-02T04:00:00Z | 2018-04-02T14:49:55Z | 0 | 0 | 09000064830870fd | ||
| FRA-2010-0033-0033 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q4 2017 PTC Progress Report | Other | Report | 2018-02-13T05:00:00Z | 2018 | 2 | 2018-02-13T05:00:00Z | 2018-02-13T15:34:20Z | 0 | 0 | 0900006482f2b0a1 | ||
| FRA-2010-0033-0032 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q3 2017 PTC Progress Report | Other | Report | 2017-12-01T05:00:00Z | 2017 | 12 | 2017-12-01T05:00:00Z | 2017-12-01T16:32:14Z | 0 | 0 | 0900006482cc53e7 | ||
| FRA-2010-0033-0031 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad - Positive Train Control Implementation Plan | Other | Planning | 2017-10-19T04:00:00Z | 2017 | 10 | 2017-10-19T04:00:00Z | 2024-11-07T00:59:35Z | 1 | 0 | 0900006482be446d | ||
| FRA-2010-0033-0030 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Acknowledgement Letter | Other | Acknowledgement Letter/Receipt | 2017-10-17T04:00:00Z | 2017 | 10 | 2017-10-17T04:00:00Z | 2024-11-07T01:19:02Z | 1 | 0 | 0900006482bd4a88 | ||
| FRA-2010-0033-0029 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Response | Other | Response(s) | 2017-10-16T04:00:00Z | 2017 | 10 | 2017-10-16T04:00:00Z | 2024-11-07T01:18:58Z | 1 | 0 | 0900006482bcd648 | ||
| FRA-2010-0033-0028 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - Response | Other | Response(s) | 2017-08-25T04:00:00Z | 2017 | 8 | 2017-08-25T04:00:00Z | 2024-11-07T01:09:07Z | 1 | 0 | 0900006482ac6ca8 | ||
| FRA-2010-0033-0027 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - Response | Other | Response(s) | 2017-08-24T04:00:00Z | 2017 | 8 | 2017-08-24T04:00:00Z | 2024-11-07T01:09:14Z | 1 | 0 | 0900006482ab8223 | ||
| FRA-2010-0033-0026 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q2 2017 PTC Progress Report | Other | Report | 2017-08-15T04:00:00Z | 2017 | 8 | 2017-08-15T04:00:00Z | 2017-08-15T14:54:07Z | 0 | 0 | 0900006482a32398 | ||
| FRA-2010-0033-0025 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA - Acknowledgement Letter | Other | Acknowledgement Letter/Receipt | 2017-08-01T04:00:00Z | 2017 | 8 | 2017-08-01T04:00:00Z | 2024-11-07T01:06:41Z | 1 | 0 | 0900006482992a7c | ||
| FRA-2010-0033-0024 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q1 2017 PTC Progress Report | Other | Report | 2017-05-25T04:00:00Z | 2017 | 5 | 2017-05-25T04:00:00Z | 2017-05-25T16:39:25Z | 0 | 0 | 090000648261423c | ||
| FRA-2010-0033-0023 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) 2016 Annual PTC Progress Report | Other | Report | 2017-04-25T04:00:00Z | 2017 | 4 | 2017-04-25T04:00:00Z | 2017-04-25T17:48:22Z | 0 | 0 | 09000064825742d7 | ||
| FRA-2010-0033-0022 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Rail Operations (NJTR) PTC Implementation Plan (PTCIP) Version 4.0 | Other | Report | 2017-03-10T05:00:00Z | 2017 | 3 | 2017-03-10T05:00:00Z | 2017-03-10T15:03:08Z | 0 | 0 | 09000064824ff44d | ||
| FRA-2010-0033-0021 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) Q4 2016 Quarterly PTC Progress Report | Other | Report | 2017-02-16T05:00:00Z | 2017 | 2 | 2017-02-16T05:00:00Z | 2017-02-16T14:45:46Z | 0 | 0 | 09000064824c6b1f | ||
| FRA-2010-0033-0020 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Quarterly PTC Progress Report Form Q3drftV3FNL | Other | Report | 2016-11-18T05:00:00Z | 2016 | 11 | 2016-11-18T05:00:00Z | 2016-11-18T14:15:14Z | 0 | 0 | 09000064823a0d60 | ||
| FRA-2010-0033-0019 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S.DOT/FRA- Decision | Other | Decision | 2016-11-07T05:00:00Z | 2016 | 11 | 2016-11-07T05:00:00Z | 2024-11-11T21:31:17Z | 1 | 0 | 0900006482377900 | ||
| FRA-2010-0033-0018 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit - Revised PTCIP Submission | Other | Report | 2016-09-29T04:00:00Z | 2016 | 9 | 2016-09-29T04:00:00Z | 2024-11-12T06:14:38Z | 1 | 0 | 09000064822816e2 | ||
| FRA-2010-0033-0017 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - Type Approval FRA-TA-2013-03 | Other | Decision | 2016-09-14T04:00:00Z | 2016 | 9 | 2016-09-14T04:00:00Z | 2024-11-07T23:48:40Z | 1 | 0 | 090000648220bd8c | ||
| FRA-2010-0033-0016 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTR Quarterly PTC Progress Report Form Q1 Q2FNL29Jul16 | Other | Report | 2016-09-13T04:00:00Z | 2016 | 9 | 2016-09-13T04:00:00Z | 2016-09-13T15:03:43Z | 0 | 0 | 09000064822049b7 | ||
| FRA-2010-0033-0015 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | Ann PTC Progress Rep Form FRA F 6180 166 2015 Mar16FNL NJTR | Other | Report | 2016-04-27T04:00:00Z | 2016 | 4 | 2016-04-27T04:00:00Z | 2024-11-12T06:07:38Z | 1 | 0 | 0900006481f912ea | ||
| FRA-2010-0033-0014 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | Annual Update of NJ Transit Positive Train Control Implementation Plan | Other | Report | 2015-08-18T04:00:00Z | 2015 | 8 | 2015-08-18T04:00:00Z | 2015-08-18T15:16:44Z | 0 | 0 | 0900006481b55f92 | ||
| FRA-2010-0033-0013 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad (NJTR) - 2014 Annual Update | Other | Report | 2015-01-23T05:00:00Z | 2015 | 1 | 2015-01-23T05:00:00Z | 2024-11-11T20:55:34Z | 1 | 0 | 09000064819dc114 | ||
| FRA-2010-0033-0012 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Positive Train Control Development Plan Letter dated August 1, 2013 | Other | Letter(s) | 2014-01-27T05:00:00Z | 2014 | 1 | 2014-01-27T05:00:00Z | 2024-11-07T23:04:13Z | 1 | 0 | 0900006481524b03 | ||
| FRA-2010-0033-0011 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit Agency - Positive Train Control Development Plan | Other | Acknowledgement Letter/Receipt | 2012-12-19T05:00:00Z | 2012 | 12 | 2012-12-19T05:00:00Z | 2024-11-12T05:09:26Z | 1 | 0 | 090000648119172d | ||
| FRA-2010-0033-0010 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - Letter re: New Jersey Transit Railroad - Positive Train Control Plans) | Other | Letter(s) | 2012-03-15T04:00:00Z | 2012 | 3 | 2012-03-15T04:00:00Z | 2024-11-12T04:45:47Z | 1 | 0 | 0900006480fd71ed | ||
| FRA-2010-0033-0009 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit - Request for Admendment #1 | Other | Request | 2012-03-05T05:00:00Z | 2012 | 3 | 2012-03-05T05:00:00Z | 2024-11-07T22:27:47Z | 1 | 0 | 0900006480fc412d | ||
| FRA-2010-0033-0008 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit - Positive Train Control Implementation Plan - Version 3.0 - September 30, 2011 | Other | Additional Information | 2012-03-05T05:00:00Z | 2012 | 3 | 2012-03-05T05:00:00Z | 2012-03-05T19:05:08Z | 0 | 0 | 0900006480fc412a | ||
| FRA-2010-0033-0007 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit - Positive Train Control Development Plan & RFA for PTCIP with Updated PTCIP Reference - September 30, 2011 | Other | Additional Information | 2012-03-05T05:00:00Z | 2012 | 3 | 2012-03-05T05:00:00Z | 2012-03-05T19:02:29Z | 0 | 0 | 0900006480fc4124 | ||
| FRA-2010-0033-0006 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJ Transit - Request for 90 Day Extension | Other | Extension of Time | 2011-06-06T04:00:00Z | 2011 | 6 | 2011-06-06T04:00:00Z | 2013-08-11T03:15:11Z | 0 | 0 | 0900006480e3d213 | ||
| FRA-2010-0033-0005 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit - PTC April 2011 Annual Update | Other | Other | 2011-05-12T04:00:00Z | 2011 | 5 | 2011-05-12T04:00:00Z | 2013-08-11T01:41:25Z | 0 | 0 | 0900006480c3e337 | ||
| FRA-2010-0033-0004 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | NJTRANSIT_PTCIP_Ver2_Aug_09_2010 | Other | Other | 2010-11-17T05:00:00Z | 2010 | 11 | 2010-11-17T05:00:00Z | 2024-11-12T04:56:31Z | 1 | 0 | 0900006480b78e76 | ||
| FRA-2010-0033-0003 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | U.S. DOT/FRA - PTCIP Revision and Resubmission - Provisional Approval | Other | Other | 2010-10-18T04:00:00Z | 2010 | 10 | 2010-10-18T04:00:00Z | 2013-08-11T01:37:36Z | 0 | 0 | 0900006480b6f99e | ||
| FRA-2010-0033-0001 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit Railroad and ConOps April 15, 2010 | Other | Other | 2010-04-23T04:00:00Z | 2010 | 4 | 2010-04-23T04:00:00Z | 2024-11-07T22:15:34Z | 1 | 0 | 0900006480add742 | ||
| FRA-2010-0033-0002 | FRA | New Jersey Transit Railroad - Positive Train Control Plans FRA-2010-0033 | New Jersey Transit - PTCIP April 16, 2010 | Other | Other | 2010-04-23T04:00:00Z | 2010 | 4 | 2010-04-23T04:00:00Z | 2024-11-07T22:15:34Z | 1 | 0 | 0900006480add743 |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE documents (
id TEXT PRIMARY KEY,
agency_id TEXT,
docket_id TEXT REFERENCES dockets(id),
title TEXT,
document_type TEXT,
subtype TEXT,
posted_date TEXT,
posted_year INTEGER,
posted_month INTEGER,
comment_start_date TEXT,
comment_end_date TEXT,
last_modified TEXT,
fr_doc_num TEXT,
open_for_comment INTEGER,
withdrawn INTEGER,
object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;