documents
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
106 rows where docket_id = "FRA-2010-0031" sorted by posted_date descending
This data as json, CSV (advanced)
Suggested facets: subtype, posted_month, open_for_comment, posted_date (date), comment_start_date (date), comment_end_date (date), last_modified (date)
posted_year 15
agency_id 1
- FRA 106
| id | agency_id | docket_id | title | document_type | subtype | posted_date ▲ | posted_year | posted_month | comment_start_date | comment_end_date | last_modified | fr_doc_num | open_for_comment | withdrawn | object_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| FRA-2010-0031-0112 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR PTC RFA for Temporary Outage for Mid-Suffolk Yard Conditional Approval | Other | Report | 2025-10-20T04:00:00Z | 2025 | 10 | 2025-10-20T04:00:00Z | 2025-10-20T19:02:49Z | 0 | 0 | 09000064b90363f0 | ||
| FRA-2010-0031-0111 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-250922-016 LIRR RFA to Its PTC System-(Temporary Outage)PTC Divide 4 Construction Zone Conditional Approval-FRA-2010-0031 final signed | Other | Decision | 2025-09-23T04:00:00Z | 2025 | 9 | 2025-09-23T04:00:00Z | 2025-09-23T21:49:40Z | 0 | 0 | 09000064b8fd6281 | ||
| FRA-2010-0031-0110 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment: Long Island Rail Road, Positive Train Control System | Notice | Request for Comments | 2025-09-12T04:00:00Z | 2025 | 9 | 2025-09-12T04:00:00Z | 2025-10-03T03:59:59Z | 2025-09-12T16:42:53Z | 2025-17585 | 0 | 0 | 09000064b8f73e98 |
| FRA-2010-0031-0109 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP Temp Outage - September 2025 | Other | Report | 2025-09-04T04:00:00Z | 2025 | 9 | 2025-09-04T04:00:00Z | 2025-09-04T19:14:17Z | 0 | 0 | 09000064b8f41a79 | ||
| FRA-2010-0031-0108 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment: Long Island Rail Road, Positive Train Control System | Notice | Request for Comments | 2025-08-22T04:00:00Z | 2025 | 8 | 2025-08-22T04:00:00Z | 2025-09-12T03:59:59Z | 2025-08-22T16:51:41Z | 2025-16130 | 0 | 0 | 09000064b8f0f152 |
| FRA-2010-0031-0107 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP Temporary Outage - August 2025 | Other | Report | 2025-08-11T04:00:00Z | 2025 | 8 | 2025-08-11T04:00:00Z | 2025-08-11T23:16:27Z | 0 | 0 | 09000064b8ef7eb2 | ||
| FRA-2010-0031-0106 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-250409-018 LIRR RFA for Temporary Outage for Union 87 Approval-FRA-2010-0031 final signed | Other | Decision | 2025-04-16T04:00:00Z | 2025 | 4 | 2025-04-16T04:00:00Z | 2025-04-16T19:43:27Z | 0 | 0 | 0900006486a98a11 | ||
| FRA-2010-0031-0104 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment: Long Island Rail Road, Positive Train Control System | Notice | Request for Comments | 2025-03-17T04:00:00Z | 2025 | 3 | 2025-03-17T04:00:00Z | 2025-04-08T03:59:59Z | 2025-04-08T01:00:27Z | 2025-04267 | 0 | 0 | 09000064869fecf3 |
| FRA-2010-0031-0103 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment (RFA) for PTC System – Construction Zone per 49 CFR §236.1021 (Docket Number FRA-2010-0031) – additional information | Other | Additional Information | 2025-03-05T05:00:00Z | 2025 | 3 | 2025-03-05T05:00:00Z | 2025-03-05T15:54:06Z | 0 | 0 | 09000064869a494e | ||
| FRA-2010-0031-0102 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-240523-005 LIRR RFA to Its PTCSP OBC Update-FRA-2010-0031 final signed | Other | Decision | 2024-06-03T04:00:00Z | 2024 | 6 | 2024-06-03T04:00:00Z | 2024-11-12T22:34:20Z | 1 | 0 | 0900006486593aaa | ||
| FRA-2010-0031-0101 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment: Long Island Rail Road, Positive Train Control Safety Plan and Positive Train Control System | Notice | Notice of Availability | 2024-04-30T04:00:00Z | 2024 | 4 | 2024-04-30T04:00:00Z | 2024-05-21T03:59:59Z | 2024-11-12T22:31:03Z | 2024-09301 | 1 | 0 | 090000648652749e |
| FRA-2010-0031-0100 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-240422-029 LIRR RFA to Its PTC System (Temporary Discontinuance) Cond. Approval-FRA-2010-0031 final signed | Other | Decision | 2024-04-29T04:00:00Z | 2024 | 4 | 2024-04-29T04:00:00Z | 2024-11-12T22:30:20Z | 1 | 0 | 09000064865238be | ||
| FRA-2010-0031-0097 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-240408-003 B2B Functionality for ACSES II and ASES II-FRA-2010-0029-0030-0031-0033 and 0036 final signed | Other | Decision | 2024-04-22T04:00:00Z | 2024 | 4 | 2024-04-22T04:00:00Z | 2024-04-22T11:56:20Z | 0 | 0 | 09000064864e3962 | ||
| FRA-2010-0031-0098 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | ENCLOSURE-RRS-240408-003 | Other | Exhibit(s) | 2024-04-22T04:00:00Z | 2024 | 4 | 2024-04-22T04:00:00Z | 2024-04-22T11:59:16Z | 0 | 0 | 09000064864e3973 | ||
| FRA-2010-0031-0099 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP – April 2024 | Other | Report | 2024-04-22T04:00:00Z | 2024 | 4 | 2024-04-22T04:00:00Z | 2024-04-22T13:17:24Z | 0 | 0 | 09000064864e4106 | ||
| FRA-2010-0031-0096 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request for Amendment: Long Island Rail Road; Positive Train Control System | Notice | Notice of Availability | 2024-03-26T04:00:00Z | 2024 | 3 | 2024-03-26T04:00:00Z | 2024-04-16T03:59:59Z | 2024-11-12T22:27:14Z | 2024-06416 | 1 | 0 | 0900006486498a3b |
| FRA-2010-0031-0095 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTC System Temporary Outage – March 2024 | Other | Report | 2024-03-19T04:00:00Z | 2024 | 3 | 2024-03-19T04:00:00Z | 2024-03-19T16:39:23Z | 0 | 0 | 0900006486484af4 | ||
| FRA-2010-0031-0094 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-230816-015_LIRR RFA PD-3 Temporary Discontinuance Conditional Approval-FRA-2010-0031_final signed (002) | Other | Decision | 2023-09-06T04:00:00Z | 2023 | 9 | 2023-09-06T04:00:00Z | 2024-11-12T23:54:17Z | 1 | 0 | 0900006485f4a299 | ||
| FRA-2010-0031-0093 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP – July 2023 | Other | Report | 2023-08-07T04:00:00Z | 2023 | 8 | 2023-08-07T04:00:00Z | 2023-08-07T14:30:04Z | 0 | 0 | 0900006485dee291 | ||
| FRA-2010-0031-0090 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request to Amend Its Positive Train Control System: Long Island Rail Road | Notice | Notice of Intent | 2023-08-02T04:00:00Z | 2023 | 8 | 2023-08-02T04:00:00Z | 2023-08-23T03:59:59Z | 2024-08-24T19:23:42Z | 2023-16406 | 0 | 0 | 0900006485dac62b |
| FRA-2010-0031-0089 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-230530-022 LIRR RFA to Its PTCSP APPROVAL-FRA-2010-0031 final signed | Other | Report | 2023-06-06T04:00:00Z | 2023 | 6 | 2023-06-06T04:00:00Z | 2023-06-06T12:04:07Z | 0 | 0 | 0900006485ac4542 | ||
| FRA-2010-0031-0088 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Request to Amend Its Positive Train Control Safety Plan: Long Island Rail Road | Notice | Notice of Availability | 2023-05-05T04:00:00Z | 2023 | 5 | 2023-05-05T04:00:00Z | 2023-05-26T03:59:59Z | 2024-11-11T21:24:09Z | 2023-09556 | 1 | 0 | 09000064859d31d3 |
| FRA-2010-0031-0087 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP – Apr 2023 | Other | Report | 2023-04-26T04:00:00Z | 2023 | 4 | 2023-04-26T04:00:00Z | 2023-04-26T15:36:48Z | 0 | 0 | 090000648598c359 | ||
| FRA-2010-0031-0086 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-221205-014 LIRR RFA to Its PTCSP Approval-FRA-2010-0031 signed | Other | Decision | 2022-12-05T05:00:00Z | 2022 | 12 | 2022-12-05T05:00:00Z | 2024-11-07T00:45:05Z | 1 | 0 | 090000648551c1c2 | ||
| FRA-2010-0031-0084 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LI RFA to PTCSP and Revised PTCSP 2.0.6- October 2022 | Other | Report | 2022-11-07T05:00:00Z | 2022 | 11 | 2022-11-07T05:00:00Z | 2022-11-07T14:12:43Z | 0 | 0 | 0900006485493212 | ||
| FRA-2010-0031-0083 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Positive Train Control Safety Plan and Positive Train Control System: Long Island Rail Road | Notice | Request for Comments | 2022-11-07T05:00:00Z | 2022 | 11 | 2022-11-07T05:00:00Z | 2022-11-29T04:59:59Z | 2024-11-12T23:48:13Z | 2022-24123 | 1 | 0 | 0900006485492de4 |
| FRA-2010-0031-0082 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-220926-009 Back 2 Back Functionality Requirements for ACSES II and ASES II-Several Dockets final_signed | Other | Letter(s) | 2022-09-29T04:00:00Z | 2022 | 9 | 2022-09-29T04:00:00Z | 2024-11-07T00:43:02Z | 1 | 0 | 0900006485381413 | ||
| FRA-2010-0031-0081 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-220913-016 LIRR RFA to Its PTCIP Rev. 8.0 Approval FRA-2010-0031 signed | Other | Decision | 2022-09-26T04:00:00Z | 2022 | 9 | 2022-09-26T04:00:00Z | 2024-11-12T23:46:07Z | 1 | 0 | 090000648536f417 | ||
| FRA-2010-0031-0080 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road’s Request for Amendment to Its Positive Train Control Safety Plan – Denial Without Prejudice | Other | Report | 2022-07-26T04:00:00Z | 2022 | 7 | 2022-07-26T04:00:00Z | 2022-07-26T14:48:30Z | 0 | 0 | 09000064851ea11f | ||
| FRA-2010-0031-0079 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road's Request To Amend Its Positive Train Control Safety Plan and Positive Train Control System | Notice | Request for Comments | 2022-06-28T04:00:00Z | 2022 | 6 | 2022-06-28T04:00:00Z | 2022-07-19T03:59:59Z | 2024-11-12T23:42:56Z | 2022-13703 | 1 | 0 | 09000064851a6c4f |
| FRA-2010-0031-0078 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP Rev 2.0.4 Jun 2022 | Other | Report | 2022-06-15T04:00:00Z | 2022 | 6 | 2022-06-15T04:00:00Z | 2022-06-15T14:33:59Z | 0 | 0 | 0900006485164ce4 | ||
| FRA-2010-0031-0077 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-220427-003 LIRRs RFA to its PTCSP Rev. 1.2 Approval-FRA-2010-0031_signed | Other | Decision | 2022-05-05T04:00:00Z | 2022 | 5 | 2022-05-05T04:00:00Z | 2024-11-12T23:40:56Z | 1 | 0 | 0900006485053020 | ||
| FRA-2010-0031-0074 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road's Request to Amend Its Positive Train Control Safety Plan and Positive Train Control System | Notice | Request for Comments | 2022-03-29T04:00:00Z | 2022 | 3 | 2022-03-29T04:00:00Z | 2022-04-19T03:59:59Z | 2024-11-12T23:37:51Z | 2022-06613 | 1 | 0 | 0900006484feae62 |
| FRA-2010-0031-0073 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCSP Rev 1.2 Mar 2022 | Other | Report | 2022-03-23T04:00:00Z | 2022 | 3 | 2022-03-23T04:00:00Z | 2022-04-07T16:42:45Z | 0 | 0 | 0900006484fdb9ad | ||
| FRA-2010-0031-0072 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-220301-005 Amtrak and LIRR Interoperability Harold Interlocking Back to Back IXL RD3 Mitigation Extension Approval-FRA-2010-0029 and FRA-2010-0031 | Other | Decision | 2022-03-08T05:00:00Z | 2022 | 3 | 2022-03-08T05:00:00Z | 2024-11-07T00:36:56Z | 1 | 0 | 0900006484fc0800 | ||
| FRA-2010-0031-0071 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR RFA to PTCIP and Revised PTCIP Version 7 - February 2020 | Other | Report | 2021-06-22T04:00:00Z | 2021 | 6 | 2021-06-22T04:00:00Z | 2021-07-06T13:20:35Z | 0 | 0 | 0900006484ba0595 | ||
| FRA-2010-0031-0070 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRRPTC-FRA-020 Mainline Track Exclusion Addendum (MTEA) for Ronkonkoma KO to Greenport GY Rev 5.0 | Other | Report | 2021-06-22T04:00:00Z | 2021 | 6 | 2021-06-22T04:00:00Z | 2021-06-22T15:54:30Z | 0 | 0 | 0900006484ba018e | ||
| FRA-2010-0031-0069 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q4 2020 PTC Progress Report | Other | Report | 2021-04-26T04:00:00Z | 2021 | 4 | 2021-04-26T04:00:00Z | 2021-04-26T14:58:56Z | 0 | 0 | 0900006484ab71dc | ||
| FRA-2010-0031-0068 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) 2020 Annual PTC Progress Report | Other | Report | 2021-04-24T04:00:00Z | 2021 | 4 | 2021-04-24T04:00:00Z | 2021-04-24T16:22:06Z | 0 | 0 | 0900006484ab54a4 | ||
| FRA-2010-0031-0067 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-201209-008 LIRR's RFA to It PTCIP and Main Line Track Exclusion Addendum Conditional Approval | Other | Decision | 2020-12-14T05:00:00Z | 2020 | 12 | 2020-12-14T05:00:00Z | 2024-11-06T23:43:14Z | 1 | 0 | 090000648499c3db | ||
| FRA-2010-0031-0066 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-201201-001 LIRR Request for Disabling of ACSES on LIRR Mainline Branch Acknowledgement Letter | Other | Acknowledgement Letter/Receipt | 2020-12-08T05:00:00Z | 2020 | 12 | 2020-12-08T05:00:00Z | 2024-11-06T23:42:58Z | 1 | 0 | 090000648498dac6 | ||
| FRA-2010-0031-0065 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q3 2020 PTC Progress Report | Other | Report | 2020-11-17T05:00:00Z | 2020 | 11 | 2020-11-17T05:00:00Z | 2020-11-17T18:37:45Z | 0 | 0 | 0900006484964861 | ||
| FRA-2010-0031-0064 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | US DOT/FRA- Approval Letter | Other | Action Memo or Letter | 2020-11-16T05:00:00Z | 2020 | 11 | 2020-11-16T05:00:00Z | 2020-11-16T17:36:07Z | 0 | 0 | 0900006484961329 | ||
| FRA-2010-0031-0063 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-200731-003 AMTRAK LIRR B2B MITIGATION HAROLD INTERLOCKING APPROVAL | Other | Decision | 2020-10-07T04:00:00Z | 2020 | 10 | 2020-10-07T04:00:00Z | 2024-11-12T23:25:00Z | 1 | 0 | 09000064848e56c5 | ||
| FRA-2010-0031-0062 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-200731-002 LIRR RFA to PTCIP MTEA | Other | Decision | 2020-09-08T04:00:00Z | 2020 | 9 | 2020-09-08T04:00:00Z | 2024-11-12T23:25:45Z | 1 | 0 | 090000648484b34f | ||
| FRA-2010-0031-0061 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q2 2020 PTC Progress Report | Other | Report | 2020-08-13T04:00:00Z | 2020 | 8 | 2020-08-13T04:00:00Z | 2020-08-13T14:15:46Z | 0 | 0 | 09000064847fc634 | ||
| FRA-2010-0031-0060 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q1 2020 PTC Progress Report | Other | Report | 2020-05-15T04:00:00Z | 2020 | 5 | 2020-05-15T04:00:00Z | 2020-05-15T20:23:35Z | 0 | 0 | 090000648460deee | ||
| FRA-2010-0031-0058 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-200409-005 LIRR PTCSP Rev. E Acknowledgment Letter | Other | Acknowledgement Letter/Receipt | 2020-04-24T04:00:00Z | 2020 | 4 | 2020-04-24T04:00:00Z | 2020-04-24T18:46:08Z | 0 | 0 | 09000064844d4170 | ||
| FRA-2010-0031-0059 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) PTC Safety Plan (PTCSP) Revision E - March 2020 | Other | Report | 2020-04-24T04:00:00Z | 2020 | 4 | 2020-04-24T04:00:00Z | 2020-04-24T19:11:12Z | 0 | 0 | 09000064844d43b3 | ||
| FRA-2010-0031-0057 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RRS-200323-006 LIRR RFA to PTCIP Rev. 7.0 Approval | Other | Decision | 2020-04-21T04:00:00Z | 2020 | 4 | 2020-04-21T04:00:00Z | 2024-11-06T23:34:10Z | 1 | 0 | 09000064844bd4c1 | ||
| FRA-2010-0031-0056 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) 2019 Annual PTC Progress Report | Other | Report | 2020-04-03T04:00:00Z | 2020 | 4 | 2020-04-03T04:00:00Z | 2020-04-03T14:54:10Z | 0 | 0 | 0900006484485a96 | ||
| FRA-2010-0031-0054 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RSC-10700004 LIRR RFA to its PTCIP Rev. 6.0 Approval | Other | Decision | 2020-02-26T05:00:00Z | 2020 | 2 | 2020-02-26T05:00:00Z | 2024-11-06T23:33:04Z | 1 | 0 | 09000064843b5ae5 | ||
| FRA-2010-0031-0055 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q4 2019 PTC Progress Report | Other | Report | 2020-02-26T05:00:00Z | 2020 | 2 | 2020-02-26T05:00:00Z | 2020-02-26T15:35:20Z | 0 | 0 | 09000064843b5c1c | ||
| FRA-2010-0031-0053 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Decision | Other | Decision | 2019-12-17T05:00:00Z | 2019 | 12 | 2019-12-17T05:00:00Z | 2024-11-12T23:14:53Z | 1 | 0 | 090000648422240a | ||
| FRA-2010-0031-0052 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q3 2019 PTC Progress Report | Other | Report | 2019-11-25T05:00:00Z | 2019 | 11 | 2019-11-25T05:00:00Z | 2019-11-25T21:09:00Z | 0 | 0 | 09000064841b2575 | ||
| FRA-2010-0031-0051 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U S.DOT/FRA - Decision | Other | Decision | 2019-10-10T04:00:00Z | 2019 | 10 | 2019-10-10T04:00:00Z | 2024-11-12T23:10:03Z | 1 | 0 | 09000064840780d2 | ||
| FRA-2010-0031-0050 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) PTC Safety Plan (PTCSP) Revision C - August 2019 | Other | Report | 2019-09-11T04:00:00Z | 2019 | 9 | 2019-09-11T04:00:00Z | 2019-09-11T16:18:04Z | 0 | 0 | 0900006483f395be | ||
| FRA-2010-0031-0049 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q2 2019 PTC Progress Report | Other | Report | 2019-09-10T04:00:00Z | 2019 | 9 | 2019-09-10T04:00:00Z | 2019-09-10T19:34:44Z | 0 | 0 | 0900006483f2c710 | ||
| FRA-2010-0031-0048 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Decision | Other | Decision | 2019-08-12T04:00:00Z | 2019 | 8 | 2019-08-12T04:00:00Z | 2024-11-12T23:05:33Z | 1 | 0 | 0900006483e36141 | ||
| FRA-2010-0031-0047 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Decision | Other | Decision | 2019-08-12T04:00:00Z | 2019 | 8 | 2019-08-12T04:00:00Z | 2024-11-12T23:06:45Z | 1 | 0 | 0900006483e35f29 | ||
| FRA-2010-0031-0046 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q1 2019 PTC Progress Report | Other | Report | 2019-05-29T04:00:00Z | 2019 | 5 | 2019-05-29T04:00:00Z | 2019-05-29T19:47:49Z | 0 | 0 | 0900006483cd3eb9 | ||
| FRA-2010-0031-0045 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) 2018 Annual PTC Progress Report | Other | Report | 2019-04-10T04:00:00Z | 2019 | 4 | 2019-04-10T04:00:00Z | 2019-04-10T20:12:30Z | 0 | 0 | 0900006483b8028a | ||
| FRA-2010-0031-0044 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q4 2018 PTC Progress Report | Other | Report | 2019-02-15T05:00:00Z | 2019 | 2 | 2019-02-15T05:00:00Z | 2019-02-15T16:01:48Z | 0 | 0 | 0900006483a7b758 | ||
| FRA-2010-0031-0043 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR PTCIP Rev 5.0 Vol. 2 drawings | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T17:53:14Z | 0 | 0 | 0900006483a69dec | ||
| FRA-2010-0031-0040 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR Request for an Alternative Schedule and Sequence Supporting Artifacts | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T17:52:36Z | 0 | 0 | 0900006483a69de9 | ||
| FRA-2010-0031-0041 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR Request for an Alternative Schedule and Sequence | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T17:52:50Z | 0 | 0 | 0900006483a69dea | ||
| FRA-2010-0031-0042 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR Revised PTC Implementation Plan (PTCIP) Rev 5.0 | Other | Report | 2019-02-13T05:00:00Z | 2019 | 2 | 2019-02-13T05:00:00Z | 2019-02-13T17:53:04Z | 0 | 0 | 0900006483a69deb | ||
| FRA-2010-0031-0039 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S. DOT/FRA - Decision | Other | Decision | 2019-01-25T05:00:00Z | 2019 | 1 | 2019-01-25T05:00:00Z | 2024-11-12T22:52:36Z | 1 | 0 | 0900006483a0d6c9 | ||
| FRA-2010-0031-0038 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | US DOT/FRA- LIRR RFA to its PTCIP Approval | Other | Action Memo or Letter | 2018-12-14T05:00:00Z | 2018 | 12 | 2018-12-14T05:00:00Z | 2018-12-14T19:46:04Z | 0 | 0 | 0900006483996295 | ||
| FRA-2010-0031-0037 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | RSC-7750005 LIRR Substitute Criteria Conditional Approval | Other | Report | 2018-12-13T05:00:00Z | 2018 | 12 | 2018-12-13T05:00:00Z | 2018-12-13T14:18:53Z | 0 | 0 | 090000648398e833 | ||
| FRA-2010-0031-0036 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q3 2018 PTC Progress Report | Other | Report | 2018-11-23T05:00:00Z | 2018 | 11 | 2018-11-23T05:00:00Z | 2018-11-23T15:08:28Z | 0 | 0 | 09000064838f620f | ||
| FRA-2010-0031-0035 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Decision | Other | Decision | 2018-10-23T04:00:00Z | 2018 | 10 | 2018-10-23T04:00:00Z | 2024-11-07T01:05:28Z | 1 | 0 | 090000648384063b | ||
| FRA-2010-0031-0034 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Decision | Other | Decision | 2018-09-21T04:00:00Z | 2018 | 9 | 2018-09-21T04:00:00Z | 2024-11-07T01:38:13Z | 1 | 0 | 0900006483740aa1 | ||
| FRA-2010-0031-0033 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q2 2018 PTC Progress Report | Other | Report | 2018-08-24T04:00:00Z | 2018 | 8 | 2018-08-24T04:00:00Z | 2018-08-24T13:35:53Z | 0 | 0 | 0900006483650643 | ||
| FRA-2010-0031-0032 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q1 2018 PTC Progress Report | Other | Report | 2018-05-15T04:00:00Z | 2018 | 5 | 2018-05-15T04:00:00Z | 2018-05-15T19:48:03Z | 0 | 0 | 090000648326a9c6 | ||
| FRA-2010-0031-0031 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Response to LIRR ACSES II Harold Interlocking Request for Alternative Schedule | Other | Response(s) | 2018-05-03T04:00:00Z | 2018 | 5 | 2018-05-03T04:00:00Z | 2018-05-03T12:43:16Z | 0 | 0 | 0900006483226626 | ||
| FRA-2010-0031-0029 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) 2017 Annual PTC Progress Report | Other | Report | 2018-04-02T04:00:00Z | 2018 | 4 | 2018-04-02T04:00:00Z | 2018-04-02T14:37:18Z | 0 | 0 | 0900006483086cd8 | ||
| FRA-2010-0031-0030 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Approval | Other | Decision | 2018-04-02T04:00:00Z | 2018 | 4 | 2018-04-02T04:00:00Z | 2024-11-07T01:24:05Z | 1 | 0 | 0900006483088870 | ||
| FRA-2010-0031-0028 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) Q4 2017 PTC Progress Report | Other | Report | 2018-02-12T05:00:00Z | 2018 | 2 | 2018-02-12T05:00:00Z | 2018-02-12T21:31:00Z | 0 | 0 | 0900006482f1bd25 | ||
| FRA-2010-0031-0027 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LIRR) Q3 2017 PTC Progress Report | Other | Report | 2017-12-01T05:00:00Z | 2017 | 12 | 2017-12-01T05:00:00Z | 2017-12-01T16:21:44Z | 0 | 0 | 0900006482cc4ffe | ||
| FRA-2010-0031-0026 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LIRR) Q2 2017 PTC Progress Report | Other | Report | 2017-08-15T04:00:00Z | 2017 | 8 | 2017-08-15T04:00:00Z | 2017-08-15T14:29:12Z | 0 | 0 | 0900006482a1ef13 | ||
| FRA-2010-0031-0025 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S.DOT/FRA - Response | Other | Response(s) | 2017-05-22T04:00:00Z | 2017 | 5 | 2017-05-22T04:00:00Z | 2024-11-07T00:59:45Z | 1 | 0 | 09000064825f4509 | ||
| FRA-2010-0031-0024 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LIRR) Q1 2017 Quarterly PTC Progress Report | Other | Report | 2017-05-16T04:00:00Z | 2017 | 5 | 2017-05-16T04:00:00Z | 2017-05-16T19:37:16Z | 0 | 0 | 09000064825c972e | ||
| FRA-2010-0031-0023 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LIRR) 2016 Annual PTC Progress Report | Other | Report | 2017-04-25T04:00:00Z | 2017 | 4 | 2017-04-25T04:00:00Z | 2017-04-25T18:19:17Z | 0 | 0 | 0900006482575185 | ||
| FRA-2010-0031-0022 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LI) PTC Implementation Plan (PTCIP) Version 6.0 | Other | Report | 2017-03-09T05:00:00Z | 2017 | 3 | 2017-03-09T05:00:00Z | 2017-03-09T20:32:44Z | 0 | 0 | 09000064824fd94f | ||
| FRA-2010-0031-0021 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad (LIRR) Q4 2016 Quarterly PTC Progress Report | Other | Report | 2017-02-15T05:00:00Z | 2017 | 2 | 2017-02-15T05:00:00Z | 2017-02-15T21:59:52Z | 0 | 0 | 09000064824c4980 | ||
| FRA-2010-0031-0020 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR Quarterly PTC Progress Report - Final 103116 | Other | Report | 2016-11-18T05:00:00Z | 2016 | 11 | 2016-11-18T05:00:00Z | 2016-11-18T14:12:42Z | 0 | 0 | 09000064823a0d5c | ||
| FRA-2010-0031-0019 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR Quarterly PTC Progress Report 2016 Q1 and Q2 | Other | Report | 2016-09-13T04:00:00Z | 2016 | 9 | 2016-09-13T04:00:00Z | 2016-09-13T15:00:03Z | 0 | 0 | 09000064822049b3 | ||
| FRA-2010-0031-0018 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S. DOT/FRA - Conditional Approval Letter | Other | Decision | 2016-08-25T04:00:00Z | 2016 | 8 | 2016-08-25T04:00:00Z | 2024-11-11T21:30:55Z | 1 | 0 | 090000648219dec0 | ||
| FRA-2010-0031-0017 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR 2015 Annual PTC Progress Report Form FRA F 6180 166 (Final-4a) | Other | Report | 2016-04-27T04:00:00Z | 2016 | 4 | 2016-04-27T04:00:00Z | 2024-11-07T23:44:54Z | 1 | 0 | 0900006481f91752 | ||
| FRA-2010-0031-0016 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | LIRR April 16 2015 FRA PTCIP Status | Other | Report | 2015-08-18T04:00:00Z | 2015 | 8 | 2015-08-18T04:00:00Z | 2015-08-18T15:06:22Z | 0 | 0 | 0900006481b55f22 | ||
| FRA-2010-0031-0015 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S. DOT/FRA - LIRR Type Approval (FRA-TA-2013-04) for the Advanced Civil Speed Enforcement System | Other | Letter(s) | 2014-04-30T04:00:00Z | 2014 | 4 | 2014-04-30T04:00:00Z | 2016-09-14T15:08:24Z | 0 | 0 | 09000064816d72a6 | ||
| FRA-2010-0031-0014 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road - Letter dated November 24. 2013 | Other | Letter(s) | 2014-01-27T05:00:00Z | 2014 | 1 | 2014-01-27T05:00:00Z | 2024-11-07T23:02:58Z | 1 | 0 | 0900006481524b01 | ||
| FRA-2010-0031-0013 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road (LIRR) PTC Development Plan - REDACTED | Other | Report | 2013-12-26T05:00:00Z | 2013 | 12 | 2013-12-26T05:00:00Z | 2024-11-07T22:59:38Z | 1 | 0 | 09000064814bd8a6 | ||
| FRA-2010-0031-0011 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad - Main Line Branch Ronkonkoma to Greenport MTEA Limited Operations Exception | Other | Acknowledgement Letter/Receipt | 2012-12-19T05:00:00Z | 2012 | 12 | 2012-12-19T05:00:00Z | 2024-11-12T05:09:25Z | 1 | 0 | 090000648119161c | ||
| FRA-2010-0031-0012 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Railroad - PTC Development Plan (PTCDP) - Application of ACSES II in ABS Without Cab Signaling Territory & Controlled Manual Block Territory | Other | Acknowledgement Letter/Receipt | 2012-12-19T05:00:00Z | 2012 | 12 | 2012-12-19T05:00:00Z | 2024-11-12T05:09:25Z | 1 | 0 | 090000648119161e | ||
| FRA-2010-0031-0010 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S. DOT/FRA - LIRR Limited Operations Exception Approval | Other | Decision | 2012-11-13T05:00:00Z | 2012 | 11 | 2012-11-13T05:00:00Z | 2024-11-12T05:08:14Z | 1 | 0 | 0900006481166567 | ||
| FRA-2010-0031-0009 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | U.S. DOT/FRA - LIRR PTCIP Approval Letter | Other | Letter(s) | 2012-08-23T04:00:00Z | 2012 | 8 | 2012-08-23T04:00:00Z | 2012-08-23T18:35:03Z | 0 | 0 | 09000064810ebee7 | ||
| FRA-2010-0031-0008 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road - Positive Train Control Operational Concept Document - Revision 2.0 - July 1, 2011 (Redacted Version) | Other | Additional Information | 2012-03-05T05:00:00Z | 2012 | 3 | 2012-03-05T05:00:00Z | 2012-03-05T18:54:48Z | 0 | 0 | 0900006480fc40f2 | ||
| FRA-2010-0031-0007 | FRA | Long Island Rail Road - Positive Train Control Plans FRA-2010-0031 | Long Island Rail Road - Positive Train Control Drawing Package - July 1, 2011 (Redacted Version) | Other | Drawings | 2012-03-05T05:00:00Z | 2012 | 3 | 2012-03-05T05:00:00Z | 2012-03-05T18:48:37Z | 0 | 0 | 0900006480fc40de |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE documents (
id TEXT PRIMARY KEY,
agency_id TEXT,
docket_id TEXT REFERENCES dockets(id),
title TEXT,
document_type TEXT,
subtype TEXT,
posted_date TEXT,
posted_year INTEGER,
posted_month INTEGER,
comment_start_date TEXT,
comment_end_date TEXT,
last_modified TEXT,
fr_doc_num TEXT,
open_for_comment INTEGER,
withdrawn INTEGER,
object_id TEXT
);
CREATE INDEX idx_docs_agency ON documents(agency_id);
CREATE INDEX idx_docs_docket ON documents(docket_id);
CREATE INDEX idx_docs_date ON documents(posted_date);
CREATE INDEX idx_docs_year ON documents(posted_year);
CREATE INDEX idx_docs_type ON documents(document_type);
CREATE INDEX idx_docs_frnum ON documents(fr_doc_num);
CREATE INDEX idx_docs_comment_end ON documents(comment_end_date) WHERE comment_end_date IS NOT NULL AND withdrawn = 0;