id,agency_id,docket_id,title,document_type,subtype,posted_date,posted_year,posted_month,comment_start_date,comment_end_date,last_modified,fr_doc_num,open_for_comment,withdrawn,object_id PHMSA-2015-0047-0006,PHMSA,PHMSA-2015-0047,U.S. DOT/PHMSA - Final Rule; Transportation of Natural and Other Gas by Pipeline: Period for Confirmation or Revision of Maximum Allowable Operating Pressure (PS-90),Rule,Final Rule,2015-02-04T05:00:00Z,2015,2,2015-02-04T05:00:00Z,,2015-02-04T21:28:05Z,,0,0,09000064819f456b