id,agency_id,docket_id,title,document_type,subtype,posted_date,posted_year,posted_month,comment_start_date,comment_end_date,last_modified,fr_doc_num,open_for_comment,withdrawn,object_id NRC-2012-0282-0001,NRC,NRC-2012-0282,"Preoperational Testing of Onsite Electric Power Systems to Verify Proper Load Group Assignments, Electrical Separation, and Redundancy",Notice,,2012-11-26T00:00:00Z,2012,11,2012-11-26T00:00:00Z,2013-02-01T04:59:59Z,2025-05-21T08:46:49Z,2012-28564,0,0,0900006481173156 NRC-2012-0282-0002,NRC,NRC-2012-0282,"Draft Regulatory Guide DG-1294 - Pre-Operational Testing of Onsite Electric Power Systems to Verify Proper Load Group Assignments, Electrical Separation, and Redundancy",Other,,2012-11-26T00:00:00Z,2012,11,2012-11-26T00:00:00Z,,2025-05-21T08:46:49Z,,0,0,09000064811735fe