id,agency_id,docket_id,title,document_type,subtype,posted_date,posted_year,posted_month,comment_start_date,comment_end_date,last_modified,fr_doc_num,open_for_comment,withdrawn,object_id NRC-2023-0180-0001,NRC,NRC-2023-0180,"Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Energy Center; Exemption",Notice,,2023-12-29T00:00:00Z,2023,12,,,2025-05-21T06:30:18Z,2023-28776,0,0,0900006486365b00 NRC-2023-0175-0001,NRC,NRC-2023-0175,"Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Energy Center; Exemption",Notice,,2023-12-29T00:00:00Z,2023,12,,,2025-05-21T06:30:18Z,2023-28777,0,0,0900006486365a3c NRC-2022-0223-0002,NRC,NRC-2022-0223,"Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC; Indian Point Nuclear Energy Center; Exemption",Notice,,2023-12-29T00:00:00Z,2023,12,,,2025-05-21T06:30:18Z,2023-28778,0,0,0900006486365be1 NRC-2023-0215-0001,NRC,NRC-2023-0215,Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations,Notice,,2023-12-26T00:00:00Z,2023,12,2023-12-26T00:00:00Z,2024-01-26T04:59:59Z,2025-05-21T06:30:19Z,2023-27832,0,0,0900006486359e60 NRC-2023-0219-0001,NRC,NRC-2023-0219,"Atomic Safety and Licensing Board Panel; Before the Licensing Board: G. Paul Bollwerk, III, Chair, Nicholas G. Trikouros, Dr. Craig M. White; In the Matter of: Crow Butte Resources, Inc. (North Trend Expansion Project); Memorandum and Order (Notice of Hearing)",Notice,,2023-12-26T00:00:00Z,2023,12,,,2025-05-21T06:30:19Z,2023-28385,0,0,0900006486359860 NRC-2023-0001-0053,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-12-22T00:00:00Z,2023,12,,,2025-05-21T06:30:19Z,2023-28451,0,0,09000064863511d0 NRC-2023-0200-0001,NRC,NRC-2023-0200,"Environmental Assessment and Finding of No Significant Impact; Holtec Decommissioning International, LLC, and Holtec Palisades, LLC, Palisades Nuclear Plant",Notice,,2023-12-22T00:00:00Z,2023,12,,,2025-05-21T06:30:20Z,2023-28293,0,0,090000648635114d NRC-2023-0149-0001,NRC,NRC-2023-0149,Information Collection: Criteria and Procedures for Emergency Access to Non-Federal and Regional Low-Level Waste Disposal Facilities,Notice,,2023-12-21T00:00:00Z,2023,12,2023-12-21T00:00:00Z,2024-02-21T04:59:59Z,2025-05-21T06:30:20Z,2023-28144,0,0,090000648634db61 NRC-2023-0083-0001,NRC,NRC-2023-0083,"Information Collection: NRC Form 833, Form To Propose a Generic Issue",Notice,,2023-12-21T00:00:00Z,2023,12,2023-12-21T00:00:00Z,2024-02-21T04:59:59Z,2025-05-21T06:30:20Z,2023-28145,0,0,090000648634e182 NRC-2021-0193-0022,NRC,NRC-2021-0193,"Kairos Power, LLC; Hermes Test Reactor Facility",Notice,,2023-12-20T00:00:00Z,2023,12,,,2025-05-21T06:30:21Z,2023-27960,0,0,090000648634bc0e NRC-2023-0192-0002,NRC,NRC-2023-0192,"License Renewal Application; Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2",Notice,,2023-12-19T00:00:00Z,2023,12,,,2025-05-21T06:30:22Z,2023-27856,0,0,0900006486346a6a NRC-2023-0001-0052,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-12-18T00:00:00Z,2023,12,,,2025-05-21T06:30:22Z,2023-27838,0,0,09000064863439f3 NRC-2023-0108-0001,NRC,NRC-2023-0108,"Information Collection: NRC Form 149, OCFO Invitational Traveler Request Form",Notice,,2023-12-15T00:00:00Z,2023,12,2023-12-15T00:00:00Z,2024-02-14T04:59:59Z,2025-05-21T06:30:23Z,2023-27509,0,0,090000648633c680 NRC-2023-0055-0006,NRC,NRC-2023-0055,"Information Collection: DOE/NRC Form 740M, Concise Note; DOE/NRC Form 741, Nuclear Material Transaction Report; DOE/NRC Form 742, Material Balance Report; and DOE/NRC Form 742C, Physical Inventory Listing",Notice,,2023-12-14T00:00:00Z,2023,12,2023-12-14T00:00:00Z,2024-01-17T04:59:59Z,2025-05-21T06:30:23Z,2023-27508,0,0,0900006486339962 NRC-2022-0149-0002,NRC,NRC-2022-0149,Discontinuation of the Mississippi Agreement State Program’s Probationary Period,Notice,,2023-12-13T00:00:00Z,2023,12,,,2025-05-21T06:30:23Z,2023-27250,0,0,0900006486331996 NRC-2023-0001-0051,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-12-13T00:00:00Z,2023,12,,,2025-05-21T06:30:23Z,2023-27479,0,0,0900006486331496 NRC-2023-0072-0010,NRC,NRC-2023-0072,Information Collection: Grants and Cooperative Agreement Provisions,Notice,,2023-12-11T00:00:00Z,2023,12,2023-12-11T00:00:00Z,2024-01-11T04:59:59Z,2025-05-21T06:30:24Z,2023-27106,0,0,0900006486320fbf NRC-2023-0213-0001,NRC,NRC-2023-0213,Establishment of Atomic Safety and Licensing Board (Amended); 1 Energy Harbor Nuclear Corp.,Notice,,2023-12-11T00:00:00Z,2023,12,,,2025-05-21T06:30:25Z,2023-27041,0,0,0900006486320d8f NRC-2023-0203-0001,NRC,NRC-2023-0203,Order; Issuance; In the Matter of Magnus Quitmeyer,Notice,,2023-12-08T00:00:00Z,2023,12,,,2025-05-21T06:30:29Z,2023-26952,0,0,0900006486316568 NRC-2023-0208-0001,NRC,NRC-2023-0208,Atomic Safety and Licensing Board: Energy Harbor Nuclear Corp.,Notice,,2023-12-08T00:00:00Z,2023,12,2023-12-08T00:00:00Z,,2025-05-21T06:30:52Z,2023-26947,0,0,0900006486316626 NRC-2023-0001-0050,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-12-08T00:00:00Z,2023,12,2023-12-08T00:00:00Z,,2025-05-21T06:30:33Z,2023-27097,0,0,0900006486314e3e NRC-2023-0119-0005,NRC,NRC-2023-0119,"Indirect Transfers of Licenses; Order; In the Matter of General Electric Company, GE-Hitachi Nuclear Energy Americas, LLC, and Global Nuclear Fuel-Americas, LLC",Notice,,2023-12-08T00:00:00Z,2023,12,,,2025-05-21T06:30:47Z,2023-27005,0,0,0900006486316533 NRC-2023-0204-0001,NRC,NRC-2023-0204,Confirmatory Order; Issuance; In the Matter of ProTechnics Division of Core Laboratories LP,Notice,,2023-12-08T00:00:00Z,2023,12,,,2025-05-21T06:30:35Z,2023-26951,0,0,0900006486316536 NRC-2023-0202-0001,NRC,NRC-2023-0202,"ProTechnics, a Division of Core Laboratories LP; Discharge of Radioactive Tracers in Well Completion Fluids",Notice,,2023-12-07T00:00:00Z,2023,12,,,2025-05-21T06:30:53Z,2023-26915,0,0,090000648630b24b NRC-2023-0065-0003,NRC,NRC-2023-0065,Information Collection: Medical Use of Byproduct Material,Notice,,2023-12-06T00:00:00Z,2023,12,2023-12-06T00:00:00Z,2024-01-06T04:59:59Z,2025-05-21T06:30:54Z,2023-26718,0,0,09000064862ff497 NRC-2023-0205-0001,NRC,NRC-2023-0205,"Florida Power & Light Company; Establishment of Atomic Safety and Licensing Board",Notice,,2023-12-06T00:00:00Z,2023,12,,,2025-05-21T06:30:54Z,2023-26715,0,0,09000064862ff49d NRC-2023-0141-0001,NRC,NRC-2023-0141,"Information Collection: Pre-Application Communication and Scheduling for Licensing Actions Related to Digital Instrumentation and Controls",Notice,,2023-12-05T00:00:00Z,2023,12,2023-12-05T00:00:00Z,2024-02-06T04:59:59Z,2025-05-21T06:30:54Z,2023-26589,0,0,09000064862f4329 NRC-2023-0048-0007,NRC,NRC-2023-0048,"Information Collection: Licenses, Certifications, and Approvals for Nuclear Power Plants",Notice,,2023-12-04T00:00:00Z,2023,12,2023-12-04T00:00:00Z,2024-01-04T04:59:59Z,2025-05-21T06:30:54Z,2023-26523,0,0,09000064862e364e NRC-2022-0212-0004,NRC,NRC-2022-0212,"Information Collection: NRC Form 5, Occupational Dose Record for a Monitoring Period",Notice,,2023-12-01T00:00:00Z,2023,12,2023-12-01T00:00:00Z,2024-01-03T04:59:59Z,2025-05-21T06:30:55Z,2023-26424,0,0,09000064862d1c04 NRC-2023-0143-0006,NRC,NRC-2023-0143,"NuScale Power, LLC; Carbon Free Power Project, LLC; Carbon Free Power Project",Notice,,2023-12-01T00:00:00Z,2023,12,,,2025-05-21T06:30:55Z,2023-26435,0,0,09000064862d1c99 NRC-2023-0001-0049,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-12-01T00:00:00Z,2023,12,2023-12-01T00:00:00Z,,2025-05-21T06:30:55Z,2023-26560,0,0,09000064862d1d79 NRC-2023-0195-0001,NRC,NRC-2023-0195,"Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations",Notice,,2023-11-28T00:00:00Z,2023,11,2023-11-28T00:00:00Z,2023-12-29T04:59:59Z,2025-05-21T06:30:56Z,2023-25746,0,0,09000064862bc49f NRC-2023-0186-0001,NRC,NRC-2023-0186,Tennessee Valley Authority; Clinch River Nuclear Site,Notice,,2023-11-28T00:00:00Z,2023,11,,,2025-05-21T06:30:56Z,2023-26138,0,0,09000064862bc460 NRC-2023-0002-0010,NRC,NRC-2023-0002,712th Meeting of the Advisory Committee on Reactor Safeguards (ACRS),Notice,,2023-11-27T00:00:00Z,2023,11,,,2025-05-21T06:30:56Z,2023-26034,0,0,09000064862b7164 NRC-2023-0001-0048,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-11-27T00:00:00Z,2023,11,,,2025-05-21T06:30:56Z,2023-26143,0,0,09000064862b71a7 NRC-2023-0060-0005,NRC,NRC-2023-0060,Information Collection: Codes and Standards,Notice,,2023-11-27T00:00:00Z,2023,11,2023-11-27T00:00:00Z,2023-12-28T04:59:59Z,2025-05-21T06:30:56Z,2023-26068,0,0,09000064862b7165 NRC-2023-0138-0004,NRC,NRC-2023-0138,"Kairos Power, LLC; Hermes 2",Notice,,2023-11-22T00:00:00Z,2023,11,,,2025-05-21T06:30:56Z,2023-25818,0,0,09000064862a5c2e NRC-2023-0197-0001,NRC,NRC-2023-0197,"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Unit 2",Notice,,2023-11-22T00:00:00Z,2023,11,2023-11-22T00:00:00Z,2023-12-07T04:59:59Z,2025-05-21T06:30:56Z,2023-25819,0,0,09000064862a5b80 NRC-2023-0118-0003,NRC,NRC-2023-0118,Information Collection: Domestic Licensing of Special Nuclear Material,Notice,,2023-11-21T00:00:00Z,2023,11,2023-11-21T00:00:00Z,2024-01-23T04:59:59Z,2025-05-21T06:30:56Z,2023-25753,0,0,090000648629f460 NRC-2023-0063-0003,NRC,NRC-2023-0063,"Information Collection: NRC Form 749, Manual License Verification Report/ License Verification System",Notice,,2023-11-21T00:00:00Z,2023,11,2023-11-21T00:00:00Z,2023-12-22T04:59:59Z,2025-05-21T06:30:56Z,2023-25752,0,0,090000648629f532 NRC-2022-0211-0004,NRC,NRC-2022-0211,"Information Collection: NRC Form 4, Cumulative Occupational Dose History",Notice,,2023-11-21T00:00:00Z,2023,11,2023-11-21T00:00:00Z,2023-12-22T04:59:59Z,2025-05-21T06:30:56Z,2023-25755,0,0,090000648629f640 NRC-2023-0102-0001,NRC,NRC-2023-0102,"Information Collection: Comprehensive Decommissioning Program, Annual Site List and Point of Contact",Notice,,2023-11-21T00:00:00Z,2023,11,2023-11-21T00:00:00Z,2024-01-23T04:59:59Z,2025-05-21T06:30:57Z,2023-25754,0,0,090000648629f732 NRC-2023-0192-0001,NRC,NRC-2023-0192,"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2",Notice,,2023-11-20T00:00:00Z,2023,11,,,2025-05-21T06:30:57Z,2023-25578,0,0,0900006486296212 NRC-2023-0001-0047,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-11-20T00:00:00Z,2023,11,,,2025-05-21T06:30:57Z,2023-25653,0,0,0900006486296216 NRC-2023-0184-0001,NRC,NRC-2023-0184,U.S. Department of Commerce; National Institute of Standards and Technology,Notice,,2023-11-16T00:00:00Z,2023,11,,,2025-05-21T06:30:57Z,2023-24804,0,0,09000064862878e6 NRC-2022-0094-0002,NRC,NRC-2022-0094,"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2",Notice,,2023-11-15T00:00:00Z,2023,11,,,2025-05-21T06:30:58Z,2023-25101,0,0,090000648627ad32 NRC-2023-0076-0001,NRC,NRC-2023-0076,"Western Nuclear, Inc.; Split Rock Site",Notice,,2023-11-15T00:00:00Z,2023,11,,,2025-05-21T06:30:57Z,2023-25213,0,0,090000648627a81d NRC-2022-0183-2582,NRC,NRC-2022-0183,"Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2; Correction",Notice,,2023-11-14T00:00:00Z,2023,11,,,2025-05-21T06:30:58Z,2023-25065,0,0,090000648626de95 NRC-2023-0056-0001,NRC,NRC-2023-0056,"Information Collection: Notices, Instructions, and Reports to Workers: Inspection and Investigations",Notice,,2023-11-13T00:00:00Z,2023,11,2023-11-13T00:00:00Z,2024-01-13T04:59:59Z,2025-05-21T06:30:58Z,2023-24894,0,0,090000648625b9f5 NRC-2023-0002-0009,NRC,NRC-2023-0002,711th Meeting of the Advisory Committee on Reactor Safeguards (ACRS),Notice,,2023-11-13T00:00:00Z,2023,11,,,2025-05-21T06:31:00Z,2023-24919,0,0,090000648625ba97 NRC-2022-0177-0004,NRC,NRC-2022-0177,Information Collection: Licenses and Radiation Safety Requirements for Well Logging,Notice,,2023-11-13T00:00:00Z,2023,11,2023-11-13T00:00:00Z,2023-12-14T04:59:59Z,2025-05-21T06:30:59Z,2023-24924,0,0,090000648625b9fa NRC-2023-0001-0046,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-11-13T00:00:00Z,2023,11,,,2025-05-21T06:30:59Z,2023-25051,0,0,090000648625bb21 NRC-2023-0190-0001,NRC,NRC-2023-0190,"Union Electric Company, dba Ameren Missouri; Callaway Plant, Unit No. 1",Notice,,2023-11-13T00:00:00Z,2023,11,2023-11-13T00:00:00Z,2023-12-14T04:59:59Z,2025-05-21T06:30:59Z,2023-24880,0,0,090000648625bae2 NRC-2023-0174-0001,NRC,NRC-2023-0174,"Accelerated Decommissioning Partners Crystal River Unit 3, LLC; Crystal River Unit 3 Nuclear Generating Plant; License Termination Plan",Notice,,2023-11-08T00:00:00Z,2023,11,2023-11-08T00:00:00Z,2024-03-08T04:59:59Z,2025-05-21T06:31:02Z,2023-24620,0,0,0900006486226f13 NRC-2023-0191-0001,NRC,NRC-2023-0191,Vallecitos Nuclear Center; Consideration of Approval of Transfer of Licenses and Conforming Amendments,Notice,,2023-11-08T00:00:00Z,2023,11,2023-11-08T00:00:00Z,2023-12-09T04:59:59Z,2025-05-21T06:31:01Z,2023-24651,0,0,0900006486226df1 NRC-2023-0001-0045,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-11-07T00:00:00Z,2023,11,,,2025-05-21T06:31:05Z,2023-24644,0,0,0900006486218893 NRC-2022-0097-0003,NRC,NRC-2022-0097,"Nuclear Fuel Services, Inc.; U-Metal Project",Notice,,2023-11-06T00:00:00Z,2023,11,,,2025-05-21T06:31:07Z,2023-24408,0,0,09000064862085ac NRC-2022-0183-2581,NRC,NRC-2022-0183,"Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2",Notice,,2023-11-03T00:00:00Z,2023,11,2023-11-03T00:00:00Z,2023-12-27T04:59:59Z,2025-05-21T06:31:12Z,2023-24294,0,0,09000064861dfc45 NRC-2023-0152-0003,NRC,NRC-2023-0152,"Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Dominion Energy South Carolina, Inc.; Virgil C. Summer Nuclear Station, Unit 1",Notice,,2023-11-03T00:00:00Z,2023,11,2023-11-03T00:00:00Z,2023-12-05T04:59:59Z,2025-05-21T06:31:14Z,2023-24329,0,0,09000064861dfca0 NRC-2023-0128-0002,NRC,NRC-2023-0128,"In the Matter of STP Nuclear Operating Company and NRG South Texas LP; South Texas Project, Units 1 and 2 and the Associated Independent Spent Fuel Storage Installation",Notice,,2023-11-02T00:00:00Z,2023,11,,,2025-05-21T06:31:14Z,2023-24247,0,0,09000064861d12cb NRC-2023-0179-0001,NRC,NRC-2023-0179,"Global Nuclear Fuel—Americas; Wilmington Nuclear Fuel Fabrication Facility",Notice,,2023-11-01T00:00:00Z,2023,11,,,2025-05-21T06:31:20Z,2023-24060,0,0,09000064861bdde0 NRC-2023-0188-0001,NRC,NRC-2023-0188,Performance Review Boards for Senior Executive Service,Notice,,2023-11-01T00:00:00Z,2023,11,,,2025-05-21T06:31:19Z,2023-24052,0,0,09000064861bdd7e NRC-2022-0223-0001,NRC,NRC-2022-0223,"Holtec Decommissioning International, LLC, Holtec Indian Point 2, LLC, and Holtec Indian Point 3, LLC, Indian Point Nuclear Energy Center",Notice,,2023-10-31T00:00:00Z,2023,10,,,2025-05-21T06:31:22Z,2023-23971,0,0,090000648619a7a9 NRC-2023-0183-0001,NRC,NRC-2023-0183,Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations,Notice,,2023-10-31T00:00:00Z,2023,10,2023-10-31T00:00:00Z,2023-12-01T04:59:59Z,2025-05-21T06:31:21Z,2023-23382,0,0,090000648619fc8b NRC-2021-0120-0001,NRC,NRC-2021-0120,"Split Rock, Wyoming Uranium Mill Tailings Radiation Control Act Title II Disposal Site; Jeffrey City, Wyoming",Notice,,2023-10-30T00:00:00Z,2023,10,,,2025-05-21T06:31:31Z,2023-23806,0,0,0900006486180626 NRC-2023-0001-0044,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-27T00:00:00Z,2023,10,,,2025-05-21T06:31:37Z,2023-23923,0,0,090000648614a42e NRC-2023-0033-0005,NRC,NRC-2023-0033,"Information Collection: Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy)",Notice,,2023-10-27T00:00:00Z,2023,10,2023-10-27T00:00:00Z,2023-11-28T04:59:59Z,2025-05-21T06:31:36Z,2023-23792,0,0,090000648614a4b9 NRC-2023-0101-0003,NRC,NRC-2023-0101,"Information Collection: NRC Form 483, Registration Certificate—In Vitro Testing With Byproduct Material Under General License",Notice,,2023-10-27T00:00:00Z,2023,10,2023-10-27T00:00:00Z,2023-12-27T04:59:59Z,2025-05-21T06:31:36Z,2023-23793,0,0,090000648614a3ac NRC-2023-0147-0001,NRC,NRC-2023-0147,Curators of the University of Missouri; South Farm,Notice,,2023-10-27T00:00:00Z,2023,10,,,2025-05-21T06:31:36Z,2023-23695,0,0,090000648614a401 NRC-2023-0182-0001,NRC,NRC-2023-0182,"Constellation Energy Generation, LLC; Limerick Generating Station, Units 1 and 2",Notice,,2023-10-27T00:00:00Z,2023,10,2023-10-27T00:00:00Z,2023-11-28T04:59:59Z,2025-05-21T06:31:36Z,2023-23766,0,0,090000648614a366 NRC-2022-0207-0002,NRC,NRC-2022-0207,"Information Collection: NRC Form 241, Report of Proposed Activities in Non-Agreement States, Areas of Exclusive Federal Jurisdiction, or Offshore Waters",Notice,,2023-10-26T00:00:00Z,2023,10,2023-10-26T00:00:00Z,2023-11-28T04:59:59Z,2025-05-21T06:31:37Z,2023-23666,0,0,0900006486140152 NRC-2023-0185-0001,NRC,NRC-2023-0185,"Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1",Notice,,2023-10-26T00:00:00Z,2023,10,2023-10-26T00:00:00Z,2023-11-28T04:59:59Z,2025-05-21T06:31:37Z,2023-23676,0,0,090000648614014f NRC-2019-0257-0012,NRC,NRC-2019-0257,Information Collection: Nondiscrimination in Federally Assisted Programs or Activities Receiving Assistance From the Commission,Notice,,2023-10-25T00:00:00Z,2023,10,2023-10-25T00:00:00Z,2023-12-27T04:59:59Z,2025-05-21T06:31:37Z,2023-23498,0,0,0900006486136cad NRC-2023-0181-0001,NRC,NRC-2023-0181,"Proposed Revision to Standard Review Plan Branch Technical Position 7–19, Guidance for Evaluation of Defense In Depth and Diversity To Address Common-Cause Failure Due to Latent Design Defects in Digital Safety Systems",Notice,,2023-10-24T00:00:00Z,2023,10,2023-10-24T00:00:00Z,2023-11-25T04:59:59Z,2025-05-21T06:31:37Z,2023-23426,0,0,090000648612bcec NRC-2023-0001-0043,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-20T00:00:00Z,2023,10,2023-10-20T00:00:00Z,,2025-05-21T06:31:39Z,2023-23333,0,0,0900006486113346 NRC-2023-0145-0001,NRC,NRC-2023-0145,"Draft Interim Staff Guidance: Radiological Survey and Dose Modeling of the Subsurface to Support License Termination",Notice,,2023-10-19T00:00:00Z,2023,10,2023-10-19T00:00:00Z,2023-12-19T04:59:59Z,2025-05-21T06:31:39Z,2023-23114,0,0,090000648610c009 NRC-2023-0004-0002,NRC,NRC-2023-0004,Advisory Committee on the Medical Uses of Isotopes: Meeting Notice,Notice,,2023-10-17T00:00:00Z,2023,10,,,2025-05-21T06:31:45Z,2023-22852,0,0,09000064860f9b0e NRC-2023-0152-0002,NRC,NRC-2023-0152,"Dominion Energy South Carolina, Inc.; Virgil C. Summer Nuclear Station, Unit No. 1",Notice,,2023-10-16T00:00:00Z,2023,10,,,2025-05-21T06:31:47Z,2023-22784,0,0,09000064860eb3ca NRC-2023-0158-0001,NRC,NRC-2023-0158,"Union Electric Company, dba Ameren Missouri; Callaway Plant; Unit No. 1",Notice,,2023-10-16T00:00:00Z,2023,10,,,2025-05-21T06:31:48Z,2023-22783,0,0,09000064860eb37d NRC-2023-0001-0042,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-16T00:00:00Z,2023,10,,,2025-05-21T06:31:48Z,2023-22806,0,0,09000064860eb2ce NRC-2023-0177-0001,NRC,NRC-2023-0177,"DTE Electric Company; Fermi, Unit 2",Notice,,2023-10-13T00:00:00Z,2023,10,2023-10-13T00:00:00Z,2023-10-28T03:59:59Z,2025-05-21T06:31:49Z,2023-22510,0,0,09000064860cdca9 NRC-2023-0178-0001,NRC,NRC-2023-0178,"Nuclear Development, LLC; Tennessee Valley Authority; Bellefonte Nuclear Plant, Units 1 and 2; Construction Permit Transfer Application; Withdrawal by Applicant",Notice,,2023-10-13T00:00:00Z,2023,10,,,2025-05-21T06:31:49Z,2023-22657,0,0,09000064860cb3b7 NRC-2023-0002-0008,NRC,NRC-2023-0002,710th Meeting of the Advisory Committee on Reactor Safeguards (ACRS),Notice,,2023-10-13T00:00:00Z,2023,10,,,2025-05-21T06:31:49Z,2023-22673,0,0,09000064860cde34 NRC-2023-0001-0041,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-11T00:00:00Z,2023,10,,,2025-05-21T06:31:50Z,2023-22585,0,0,09000064860a5e69 NRC-2023-0001-0040,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-10T00:00:00Z,2023,10,,,2025-05-21T06:31:50Z,2023-22443,0,0,0900006486098bf4 NRC-2023-0136-0002,NRC,NRC-2023-0136,"Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Energy Harbor Corp.; Energy Harbor Generation LLC.; Energy Harbor Nuclear Corp.; Perry Nuclear Power Plant, Unit 1",Notice,,2023-10-10T00:00:00Z,2023,10,2023-10-10T00:00:00Z,2023-11-10T04:59:59Z,2025-05-21T06:31:50Z,2023-22374,0,0,0900006486098b9f NRC-2023-0066-0002,NRC,NRC-2023-0066,Information Collection: NRC CUI Program Challenge Request Process,Notice,,2023-10-06T00:00:00Z,2023,10,2023-10-06T00:00:00Z,2023-11-07T04:59:59Z,2025-05-21T06:31:50Z,2023-22318,0,0,09000064860564f6 NRC-2023-0126-0001,NRC,NRC-2023-0126,"Information Collection: NRC Form 354, Data Report on Spouse",Notice,,2023-10-06T00:00:00Z,2023,10,2023-10-06T00:00:00Z,2023-12-06T04:59:59Z,2025-05-21T06:31:50Z,2023-22319,0,0,09000064860564f8 NRC-2023-0100-0002,NRC,NRC-2023-0100,"In the Matter of Vistra Operations Company LLC; Energy Harbor Nuclear Corp.; Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; Perry Nuclear Power Plant, Unit No. 1; and the Associated Independent Spent Fuel Storage Installations",Notice,,2023-10-05T00:00:00Z,2023,10,,,2025-05-21T06:31:51Z,2023-22135,0,0,0900006486045d41 NRC-2023-0079-0005,NRC,NRC-2023-0079,"Proposed Revision to Standard Review Plan Section 15.0, ‘‘Introduction—Transient and Accident Analyses’’",Notice,,2023-10-04T00:00:00Z,2023,10,2023-10-04T00:00:00Z,2023-11-04T03:59:59Z,2025-05-21T06:31:51Z,2023-22052,0,0,0900006486033c29 NRC-2023-0165-0001,NRC,NRC-2023-0165,"Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations",Notice,,2023-10-03T00:00:00Z,2023,10,2023-10-03T00:00:00Z,2023-11-03T03:59:59Z,2025-05-21T06:31:51Z,2023-20670,0,0,0900006486024ba9 NRC-2023-0143-0003,NRC,NRC-2023-0143,"NuScale Power, LLC, Carbon Free Power Project, LLC, Carbon Free Power Project",Notice,,2023-10-03T00:00:00Z,2023,10,,,2025-05-21T06:31:51Z,2023-21801,0,0,0900006486024879 NRC-2023-0082-0001,NRC,NRC-2023-0082,"Information Collection: Disposal of High-Level Radioactive Wastes in a Geologic Repository at Yucca Mountain, Nevada",Notice,,2023-10-03T00:00:00Z,2023,10,2023-10-03T00:00:00Z,2023-12-05T04:59:59Z,2025-05-21T06:31:51Z,2023-21878,0,0,09000064860249ed NRC-2023-0176-0001,NRC,NRC-2023-0176,Order; (Providing Notice of Hearing),Notice,,2023-10-02T00:00:00Z,2023,10,,,2025-05-21T06:31:52Z,2023-21577,0,0,09000064860196e8 NRC-2023-0001-0039,NRC,NRC-2023-0001,Sunshine Act Meetings,Notice,,2023-10-02T00:00:00Z,2023,10,,,2025-05-21T06:31:52Z,2023-21819,0,0,090000648601969e NRC-2023-0099-0003,NRC,NRC-2023-0099,Information Collection: Material Control and Accounting of Special Nuclear Material,Notice,,2023-10-02T00:00:00Z,2023,10,2023-10-02T00:00:00Z,2023-12-02T04:59:59Z,2025-05-21T06:31:52Z,2023-21613,0,0,0900006486019814 NRC-2023-0104-0002,NRC,NRC-2023-0104,"Information Collection: NRC Form 64, Travel Voucher",Notice,,2023-10-02T00:00:00Z,2023,10,2023-10-02T00:00:00Z,2023-12-02T04:59:59Z,2025-05-21T06:31:52Z,2023-21617,0,0,090000648601979d NRC-2023-0037-0002,NRC,NRC-2023-0037,"Information Collection: NRC Form 536, Operator Licensing Examination Data",Notice,,2023-09-29T00:00:00Z,2023,9,2023-09-29T00:00:00Z,2023-10-31T03:59:59Z,2025-05-21T06:31:52Z,2023-21386,0,0,090000648600f460 NRC-2023-0138-0003,NRC,NRC-2023-0138,"Energy Harbor Corp.; Energy Harbor Generation LLC; Energy Harbor Nuclear Corp.; Perry Nuclear Power Plant, Unit 1",Notice,,2023-09-29T00:00:00Z,2023,9,,,2025-05-21T06:31:52Z,2023-21448,0,0,090000648600e32e NRC-2023-0157-0001,NRC,NRC-2023-0157,"In the Matter of American Centrifuge Operating, LLC; American Centrifuge Operating Oak Ridge",Notice,,2023-09-27T00:00:00Z,2023,9,,,2025-05-21T06:31:52Z,2023-21079,0,0,0900006485ffc4af