cfr_sections
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
112 rows where part_number = 990 sorted by section_id
This data as json, CSV (advanced)
Suggested facets: title_name, subchapter, part_name, subpart, subpart_name, amendment_citations
| section_id ▼ | title_number | title_name | chapter | subchapter | part_number | part_name | subpart | subpart_name | section_number | section_heading | agency | authority | source_citation | amendment_citations | full_text |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 15:15:4.1.2.5.22.1.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.10 Purpose. | NOAA | The goal of the Oil Pollution Act of 1990 (OPA), 33 U.S.C. 2701 et seq., is to make the environment and public whole for injuries to natural resources and services resulting from an incident involving a discharge or substantial threat of a discharge of oil (incident). This goal is achieved through the return of the injured natural resources and services to baseline and compensation for interim losses of such natural resources and services from the date of the incident until recovery. The purpose of this part is to promote expeditious and cost-effective restoration of natural resources and services injured as a result of an incident. To fulfill this purpose, this part provides a natural resource damage assessment process for developing a plan for restoration of the injured natural resources and services and pursuing implementation or funding of the plan by responsible parties. This part also provides an administrative process for involving interested parties in the assessment, a range of assessment procedures for identifying and evaluating injuries to natural resources and services, and a means for selecting restoration actions from a reasonable range of alternatives. | ||||
| 15:15:4.1.2.5.22.1.33.2 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.11 Scope. | NOAA | The Oil Pollution Act of 1990 (OPA), 33 U.S.C. 2701 et seq., provides for the designation of federal, state, and, if designated by the Governor of the state, local officials to act on behalf of the public as trustees for natural resources and for the designation of Indian tribe and foreign officials to act as trustees for natural resources on behalf of, respectively, the tribe or its members and the foreign government. This part may be used by these officials in conducting natural resource damage assessments when natural resources and/or services are injured as a result of an incident involving an actual or substantial threat of a discharge of oil. This part is not intended to affect the recoverability of natural resource damages when recoveries are sought other than in accordance with this part. | ||||
| 15:15:4.1.2.5.22.1.33.3 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.12 Overview. | NOAA | This part describes three phases of a natural resource damage assessment. The Preassessment Phase, during which trustees determine whether to pursue restoration, is described in subpart D of this part. The Restoration Planning Phase, during which trustees evaluate information on potential injuries and use that information to determine the need for, type of, and scale of restoration, is described in subpart E of this part. The Restoration Implementation Phase, during which trustees ensure implementation of restoration, is described in subpart F of this part. | ||||
| 15:15:4.1.2.5.22.1.33.4 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.13 Rebuttable presumption. | NOAA | Any determination or assessment of damages to natural resources made by a Federal, State, or Indian trustee in accordance with this part shall have the force and effect of a rebuttable presumption on behalf of the trustee in any administrative or judicial proceeding under OPA. | ||||
| 15:15:4.1.2.5.22.1.33.5 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.14 Coordination. | NOAA | (a) Trustees. (1) If an incident affects the interests of multiple trustees, the trustees should act jointly under this part to ensure that full restoration is achieved without double recovery of damages. For joint assessments, trustees must designate one or more Lead Administrative Trustee(s) to act as coordinators. (2) If there is a reasonable basis for dividing the natural resource damage assessment, trustees may act independently under this part, so long as there is no double recovery of damages. (3) Trustees may develop pre-incident or incident-specific memoranda of understanding to coordinate their activities. (b) Response agencies. Trustees must coordinate their activities conducted concurrently with response operations with response agencies consistent with the NCP and any pre-incident plans developed under § 990.15(a) of this part. Trustees may develop pre-incident memoranda of understanding to coordinate their activities with response agencies. (c) Responsible parties —(1) Invitation. Trustees must invite the responsible parties to participate in the natural resource damage assessment described in this part. The invitation to participate should be in writing, and a written response by the responsible parties is required to confirm the desire to participate. (2) Timing. The invitation to participate should be extended to known responsible parties as soon as practicable, but not later than the delivery of the “Notice of Intent to Conduct Restoration Planning,” under § 990.44 of this part, to the responsible party. (3) Agreements. Trustees and responsible parties should consider entering into binding agreements to facilitate their interactions and resolve any disputes during the assessment. To maximize cost-effectiveness and cooperation, trustees and responsible parties should attempt to develop a set of agreed-upon facts concerning the incident and/or assessment. (4) Nature and extent of participation. If the responsible parties accept the invitation to participate, the scope of that p… | ||||
| 15:15:4.1.2.5.22.1.33.6 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | A | Subpart A—Introduction | § 990.15 Considerations to facilitate restoration. | NOAA | In addition to the procedures provided in subparts D through F of this part, trustees may take other actions to further the goal of expediting restoration of injured natural resources and services, including: (a) Pre-incident planning. Trustees may engage in pre-incident planning activities. Pre-incident plans may identify natural resource damage assessment teams, establish trustee notification systems, identify support services, identify natural resources and services at risk, identify area and regional response agencies and officials, identify available baseline information, establish data management systems, and identify assessment funding issues and options. Potentially responsible parties, as well as all other members of the public interested in and capable of participating in assessments, should be included in pre-incident planning to the fullest extent practicable. (b) Regional Restoration Plans. Where practicable, incident-specific restoration plan development is preferred, however, trustees may develop Regional Restoration Plans. These plans may be used to support a claim under § 990.56 of this part. Regional restoration planning may consist of compiling databases that identify, on a regional or watershed basis, or otherwise as appropriate, existing, planned, or proposed restoration projects that may provide appropriate restoration alternatives for consideration in the context of specific incidents. | ||||
| 15:15:4.1.2.5.22.2.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.20 Relationship to the CERCLA natural resource damage assessment regulations. | NOAA | (a) General. Regulations for assessing natural resource damages resulting from hazardous substance releases under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA), 42 U.S.C. 9601 et seq., and the Federal Water Pollution Control Act (Clean Water Act), 33 U.S.C. 1321 et seq., are codified at 43 CFR part 11. The CERCLA regulations originally applied to natural resource damages resulting from oil discharges as well as hazardous substance releases. This part supersedes 43 CFR part 11 with regard to oil discharges covered by OPA. (b) Assessments commenced before February 5, 1996. If trustees commenced a natural resource damage assessment for an oil discharge under 43 CFR part 11 prior to February 5, 1996 they may complete the assessment in compliance with 43 CFR part 11, or they may elect to use this part, and obtain a rebuttable presumption. (c) Oil and hazardous substance mixtures. For natural resource damages resulting from a discharge or release of a mixture of oil and hazardous substances, trustees must use 43 CFR part 11 in order to obtain a rebuttable presumption. | ||||
| 15:15:4.1.2.5.22.2.33.2 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.21 Relationship to the NCP. | NOAA | This part provides procedures by which trustees may determine appropriate restoration of injured natural resources and services, where such injuries are not fully addressed by response actions. Response actions and the coordination with damage assessment activities are conducted pursuant to the National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR part 300. | ||||
| 15:15:4.1.2.5.22.2.33.3 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.22 Prohibition on double recovery. | NOAA | When taking actions under this part, trustees are subject to the prohibition on double recovery, as provided in 33 U.S.C. 2706(d)(3) of OPA. | ||||
| 15:15:4.1.2.5.22.2.33.4 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.23 Compliance with NEPA and the CEQ regulations. | NOAA | (a) General. The National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq. and Council on Environmental Quality (CEQ) regulations implementing NEPA, 40 CFR chapter V, apply to restoration actions by federal trustees, except where a categorical exclusion or other exception to NEPA applies. Thus, when a federal trustee proposes to take restoration actions under this part, it must integrate this part with NEPA, the CEQ regulations, and NEPA regulations promulgated by that federal trustee agency. Where state NEPA-equivalent laws may apply to state trustees, state trustees must consider the extent to which they must integrate this part with their NEPA-equivalent laws. The requirements and process described in this section relate only to NEPA and federal trustees. (b) NEPA requirements for federal trustees. NEPA becomes applicable when federal trustees propose to take restoration actions, which begins with the development of a Draft Restoration Plan under § 990.55 of this part. Depending upon the circumstances of the incident, federal trustees may need to consider early involvement of the public in restoration planning in order to meet their NEPA compliance requirements. (c) NEPA process for federal trustees. Although the steps in the NEPA process may vary among different federal trustees, the process will generally involve the need to develop restoration plans in the form of an Environmental Assessment or Environmental Impact Statement, depending upon the trustee agency's own NEPA regulations. (1) Environmental Assessment. (i) Purpose. The purpose of an Environmental Assessment (EA) is to determine whether a proposed restoration action will have a significant (as defined under NEPA and § 1508.27 of the CEQ regulations) impact on the quality of the human environment, in which case an Environmental Impact Statement (EIS) evaluating the impact is required. In the alternative, where the impact will not be significant, federal trustees must issue a Finding of No Significant Impact (FONSI) as part of t… | ||||
| 15:15:4.1.2.5.22.2.33.5 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.24 Compliance with other applicable laws and regulations. | NOAA | (a) Worker health and safety. When taking actions under this part, trustees must comply with applicable worker health and safety considerations specified in the NCP for response actions. (b) Natural Resources protection. When acting under this part, trustees must ensure compliance with any applicable consultation, permitting, or review requirements, including but not limited to: the Endangered Species Act of 1973, 16 U.S.C. 1531 et seq.; the Coastal Zone Management Act of 1972, 16 U.S.C. 1451 et seq.; the Migratory Bird Treaty Act, 16 U.S.C. 703 et seq.; the National Marine Sanctuaries Act, 16 U.S.C. 1431 et seq.; the National Historic Preservation Act, 12 U.S.C. 470 et seq.; the Marine Mammal Protection Act, 16 U.S.C. 1361 et seq.; and the Archaeological Resources Protection Act, 16 U.S.C. 470 et seq. | ||||
| 15:15:4.1.2.5.22.2.33.6 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.25 Settlement. | NOAA | Trustees may settle claims for natural resource damages under this part at any time, provided that the settlement is adequate in the judgment of the trustees to satisfy the goal of OPA and is fair, reasonable, and in the public interest, with particular consideration of the adequacy of the settlement to restore, replace, rehabilitate, or acquire the equivalent of the injured natural resources and services. Sums recovered in settlement of such claims, other than reimbursement of trustee costs, may only be expended in accordance with a restoration plan, which may be set forth in whole or in part in a consent decree or other settlement agreement, which is made available for public review. | ||||
| 15:15:4.1.2.5.22.2.33.7 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.26 Emergency restoration. | NOAA | [61 FR 500, Jan. 5, 1996, as amended at 67 FR 61492, Oct. 1, 2002] | (a) Trustees may take emergency restoration action before completing the process established under this part, provided that: (1) The action is needed to avoid irreversible loss of natural resources, or to prevent or reduce any continuing danger to natural resources or similar need for emergency action; (2) The action will not be undertaken by the lead response agency; (3) The action is feasible and likely to succeed; (4) Delay of the action to complete the restoration planning process established in this part likely would result in increased natural resource damages; and (5) The costs of the action are not unreasonable. (b) If response actions are still underway, trustees must coordinate with the On-Scene Coordinator (OSC), consistent with the NCP, to ensure that emergency restoration actions will not interfere with or duplicate ongoing response actions. Emergency restoration may not address residual oil unless: (1) The OSC's response is complete; or (2) The OSC has determined that the residual oil identified by the trustee as part of a proposed emergency restoration action does not merit further response. (c) Trustees must provide notice to identified responsible parties of any emergency restoration actions and, to the extent time permits, invite their participation in the conduct of those actions as provided in § 990.14(c) of this part. (d) Trustees must provide notice to the public, to the extent practicable, of these planned emergency restoration actions. Trustees must also provide public notice of the justification for, nature and extent of, and results of emergency restoration actions within a reasonable time frame after completion of such actions. The means by which this notice is provided is left to the discretion of the trustee. | |||
| 15:15:4.1.2.5.22.2.33.8 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | B | Subpart B—Authorities | § 990.27 Use of assessment procedures. | NOAA | (a) Standards for assessment procedures. Any procedures used pursuant to this part must comply with all of the following standards if they are to be in accordance with this part: (1) The procedure must be capable of providing assessment information of use in determining the type and scale of restoration appropriate for a particular injury; (2) The additional cost of a more complex procedure must be reasonably related to the expected increase in the quantity and/or quality of relevant information provided by the more complex procedure; and (3) The procedure must be reliable and valid for the particular incident. (b) Assessment procedures available. (1) The range of assessment procedures available to trustees includes, but is not limited to: (i) Procedures conducted in the field; (ii) Procedures conducted in the laboratory; (iii) Model-based procedures, including type A procedures identified in 43 CFR part 11, subpart D, and compensation formulas/schedules; and (iv) Literature-based procedures. (2) Trustees may use the assessment procedures in paragraph (b)(1) of this section alone, or in any combination, provided that the standards in paragraph (a) of this section are met, and there is no double recovery. (c) Selecting assessment procedures. (1) When selecting assessment procedures, trustees must consider, at a minimum: (i) The range of procedures available under paragraph (b) of this section; (ii) The time and cost necessary to implement the procedures; (iii) The potential nature, degree, and spatial and temporal extent of the injury; (iv) The potential restoration actions for the injury; and (v) The relevance and adequacy of information generated by the procedures to meet information requirements of restoration planning. (2) If a range of assessment procedures providing the same type and quality of information is available, the most cost-effective procedure must be used. | ||||
| 15:15:4.1.2.5.22.3.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | C | Subpart C—Definitions | § 990.30 Definitions. | NOAA | [61 FR 500, Jan. 5, 1996, as amended at 67 FR 61493, Oct. 1, 2002] | For the purpose of this rule, the term: Baseline means the condition of the natural resources and services that would have existed had the incident not occurred. Baseline data may be estimated using historical data, reference data, control data, or data on incremental changes (e.g., number of dead animals), alone or in combination, as appropriate. Cost-effective means the least costly activity among two or more activities that provide the same or a comparable level of benefits, in the judgment of the trustees. CEQ regulations means the Council on Environmental Quality regulations implementing NEPA, 40 CFR chapter V. Damages means damages specified in section 1002(b) of OPA (33 U.S.C. 1002(b)), and includes the costs of assessing these damages, as defined in section 1001(5) of OPA (33 U.S.C. 2701(5)). Discharge means any emission (other than natural seepage), intentional or unintentional, and includes, but is not limited to, spilling, leaking, pumping, pouring, emitting, emptying, or dumping, as defined in section 1001(7) of OPA (33 U.S.C. 2701(7)). Exclusive Economic Zone means the zone established by Presidential Proclamation 5030 of March 10, 1983 (3 CFR, 1984 Comp., p. 22), including the ocean waters of the areas referred to as “eastern special areas” in Article 3(1) of the Agreement between the United States of America and the Union of Soviet Socialist Republics on the Maritime Boundary, signed June 1, 1990, as defined in section 1001(8) of OPA (33 U.S.C. 2701(8)). Exposure means direct or indirect contact with the discharged oil. Facility means any structure, group of structures, equipment, or device (other than a vessel) which is used for one or more of the following purposes: exploring for, drilling for, producing, storing, handling, transferring, processing, or transporting oil. This term includes any motor vehicle, rolling stock, or pipeline used for one or more of these purposes, as defined in section 1001(9) of OPA (33 U.S.C. 2701(9)). Fund means the Oil Spill Liability Trust Fund, es… | |||
| 15:15:4.1.2.5.22.4.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.40 Purpose. | NOAA | The purpose of this subpart is to provide a process by which trustees determine if they have jurisdiction to pursue restoration under OPA and, if so, whether it is appropriate to do so. | ||||
| 15:15:4.1.2.5.22.4.33.2 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.41 Determination of jurisdiction. | NOAA | (a) Determination of jurisdiction. Upon learning of an incident, trustees must determine whether there is jurisdiction to pursue restoration under OPA. To make this determination, trustees must decide if: (1) An incident has occurred, as defined in § 990.30 of this part; (2) The incident is not: (i) Permitted under a permit issued under federal, state, or local law; or (ii) From a public vessel; or (iii) From an onshore facility subject to the Trans-Alaska Pipeline Authority Act, 43 U.S.C. 1651, et seq.; and (3) Natural resources under the trusteeship of the trustee may have been, or may be, injured as a result of the incident. (b) Proceeding with preassessment. If the conditions listed in paragraph (a) of this section are met, trustees may proceed under this part. If one of the conditions is not met, trustees may not take additional action under this part, except action to finalize this determination. Trustees may recover all reasonable assessment costs incurred up to this point provided that conditions in paragraphs (a)(1) and (a)(2) of this section were met and actions were taken with the reasonable belief that natural resources or services under their trusteeship might have been injured as a result of the incident. | ||||
| 15:15:4.1.2.5.22.4.33.3 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.42 Determination to conduct restoration planning. | NOAA | (a) Determination on restoration planning. If trustees determine that there is jurisdiction to pursue restoration under OPA, trustees must determine whether: (1) Injuries have resulted, or are likely to result, from the incident; (2) Response actions have not adequately addressed, or are not expected to address, the injuries resulting from the incident; and (3) Feasible primary and/or compensatory restoration actions exist to address the potential injuries. (b) Proceeding with preassessment. If the conditions listed in paragraph (a) of this section are met, trustees may proceed under § 990.44 of this part. If one of these conditions is not met, trustees may not take additional action under this part, except action to finalize this determination. However, trustees may recover all reasonable assessment costs incurred up to this point. | ||||
| 15:15:4.1.2.5.22.4.33.4 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.43 Data collection. | NOAA | Trustees may conduct data collection and analyses that are reasonably related to Preassessment Phase activities. Data collection and analysis during the Preassessment Phase must be coordinated with response actions such that collection and analysis does not interfere with response actions. Trustees may collect and analyze the following types of data during the Preassessment Phase: (a) Data reasonably expected to be necessary to make a determination of jurisdiction under § 990.41 of this part, or a determination to conduct restoration planning under § 990.42 of this part; (b) Ephemeral data; and (c) Information needed to design or implement anticipated assessment procedures under subpart E of this part. | ||||
| 15:15:4.1.2.5.22.4.33.5 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.44 Notice of Intent to Conduct Restoration Planning. | NOAA | (a) General. If trustees determine that all the conditions under § 990.42(a) of this part are met and trustees decide to proceed with the natural resource damage assessment, they must prepare a Notice of Intent to Conduct Restoration Planning. (b) Contents of the notice. The Notice of Intent to Conduct Restoration Planning must include a discussion of the trustees' analyses under §§ 990.41 and 990.42 of this part. Depending on information available at this point, the notice may include the trustees' proposed strategy to assess injury and determine the type and scale of restoration. The contents of a notice may vary, but will typically discuss: (1) The facts of the incident; (2) Trustee authority to proceed with the assessment; (3) Natural resources and services that are, or are likely to be, injured as a result of the incident; (4) Potential restoration actions relevant to the expected injuries; and (5) If determined at the time, potential assessment procedures to evaluate the injuries and define the appropriate type and scale of restoration for the injured natural resources and services. (c) Public availability of the notice. Trustees must make a copy of the Notice of Intent to Conduct Restoration Planning publicly available. The means by which the notice is made publicly available and whether public comments are solicited on the notice will depend on the nature and extent of the incident and various information requirements, and is left to the discretion of the trustees. (d) Delivery of the notice to the responsible parties. Trustees must send a copy of the notice to the responsible parties, to the extent known, in such a way as will establish the date of receipt, and invite responsible parties' participation in the conduct of restoration planning. Consistent with § 990.14(c) of this part, the determination of the timing, nature, and extent of responsible party participation will be determined by the trustees on an incident-specific basis. | ||||
| 15:15:4.1.2.5.22.4.33.6 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | D | Subpart D—Preassessment Phase | § 990.45 Administrative record. | NOAA | (a) If trustees decide to proceed with restoration planning, they must open a publicly available administrative record to document the basis for their decisions pertaining to restoration. The administrative record should be opened concurrently with the publication of the Notice of Intent to Conduct Restoration Planning. Depending on the nature and extent of the incident and assessment, the administrative record should include documents relied upon during the assessment, such as: (1) Any notice, draft and final restoration plans, and public comments; (2) Any relevant data, investigation reports, scientific studies, work plans, quality assurance plans, and literature; and (3) Any agreements, not otherwise privileged, among the participating trustees or with the responsible parties. (b) Federal trustees should maintain the administrative record in a manner consistent with the Administrative Procedure Act, 5 U.S.C. 551-59, 701-06. | ||||
| 15:15:4.1.2.5.22.5.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.50 Purpose. | NOAA | The purpose of this subpart is to provide a process by which trustees evaluate and quantify potential injuries (injury assessment), and use that information to determine the need for and scale of restoration actions (restoration selection). | ||||
| 15:15:4.1.2.5.22.5.33.2 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.51 Injury assessment—injury determination. | NOAA | (a) General. After issuing a Notice of Intent to Conduct Restoration Planning under § 990.44 of this part, trustees must determine if injuries to natural resources and/or services have resulted from the incident. (b) Determining injury. To make the determination of injury, trustees must evaluate if: (1) The definition of injury has been met, as defined in § 990.30 of this part; and (2)(i) An injured natural resource has been exposed to the discharged oil, and a pathway can be established from the discharge to the exposed natural resource; or (ii) An injury to a natural resource or impairment of a natural resource service has occurred as a result of response actions or a substantial threat of a discharge of oil. (c) Identifying injury. Trustees must determine whether an injury has occurred and, if so, identify the nature of the injury. Potential categories of injury include, but are not limited to, adverse changes in: survival, growth, and reproduction; health, physiology and biological condition; behavior; community composition; ecological processes and functions; physical and chemical habitat quality or structure; and public services. (d) Establishing exposure and pathway. Except for injuries resulting from response actions or incidents involving a substantial threat of a discharge of oil, trustees must establish whether natural resources were exposed, either directly or indirectly, to the discharged oil from the incident, and estimate the amount or concentration and spatial and temporal extent of the exposure. Trustees must also determine whether there is a pathway linking the incident to the injuries. Pathways may include, but are not limited to, the sequence of events by which the discharged oil was transported from the incident and either came into direct physical contact with a natural resource, or caused an indirect injury. (e) Injuries resulting from response actions or incidents involving a substantial threat of a discharge. For injuries resulting from response actions or incidents invol… | ||||
| 15:15:4.1.2.5.22.5.33.3 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.52 Injury assessment—quantification. | NOAA | (a) General. In addition to determining whether injuries have resulted from the incident, trustees must quantify the degree, and spatial and temporal extent of such injuries relative to baseline. (b) Quantification approaches. Trustees may quantify injuries in terms of: (1) The degree, and spatial and temporal extent of the injury to a natural resource; (2) The degree, and spatial and temporal extent of injury to a natural resource, with subsequent translation of that adverse change to a reduction in services provided by the natural resource; or (3) The amount of services lost as a result of the incident. (c) Natural recovery. To quantify injury, trustees must estimate, quantitatively or qualitatively, the time for natural recovery without restoration, but including any response actions. The analysis of natural recovery may consider such factors as: (1) The nature, degree, and spatial and temporal extent of injury; (2) The sensitivity and vulnerability of the injured natural resource and/or service; (3) The reproductive and recruitment potential; (4) The resistance and resilience (stability) of the affected environment; (5) The natural variability; and (6) The physical/chemical processes of the affected environment. | ||||
| 15:15:4.1.2.5.22.5.33.4 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.53 Restoration selection—developing restoration alternatives. | NOAA | [61 FR 500, Jan. 5, 1996, as amended at 67 FR 61493, Oct. 1, 2002] | (a) General. (1) If the information on injury determination and quantification under §§ 990.51 and 990.52 of this part and its relevance to restoration justify restoration, trustees may proceed with the Restoration Planning Phase. Otherwise, trustees may not take additional action under this part. However, trustees may recover all reasonable assessment costs incurred up to this point. (2) Trustees must consider a reasonable range of restoration alternatives before selecting their preferred alternative(s). Each restoration alternative is comprised of primary and/or compensatory restoration components that address one or more specific injury(ies) associated with the incident. Each alternative must be designed so that, as a package of one or more actions, the alternative would make the environment and public whole. Only those alternatives considered technically feasible and in accordance with applicable laws, regulations, or permits may be considered further under this part. (b) Primary restoration —(1) General. For each alternative, trustees must consider primary restoration actions, including a natural recovery alternative. (2) Natural recovery. Trustees must consider a natural recovery alternative in which no human intervention would be taken to directly restore injured natural resources and services to baseline. (3) Active primary restoration actions. Trustees must consider an alternative comprised of actions to directly restore the natural resources and services to baseline on an accelerated time frame. When identifying such active primary restoration actions, trustees may consider actions that: (i) Address conditions that would prevent or limit the effectiveness of any restoration action; (ii) May be necessary to return the physical, chemical, and/or biological conditions necessary to allow recovery or restoration of the injured natural resources (e.g., replacing substrate or vegetation, or modifying hydrologic conditions); or (iii) Return key natural resources and services, and would be an eff… | |||
| 15:15:4.1.2.5.22.5.33.5 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.54 Restoration selection—evaluation of alternatives. | NOAA | (a) Evaluation standards. Once trustees have developed a reasonable range of restoration alternatives under § 990.53 of this part, they must evaluate the proposed alternatives based on, at a minimum: (1) The cost to carry out the alternative; (2) The extent to which each alternative is expected to meet the trustees' goals and objectives in returning the injured natural resources and services to baseline and/or compensating for interim losses; (3) The likelihood of success of each alternative; (4) The extent to which each alternative will prevent future injury as a result of the incident, and avoid collateral injury as a result of implementing the alternative; (5) The extent to which each alternative benefits more than one natural resource and/or service; and (6) The effect of each alternative on public health and safety. (b) Preferred restoration alternatives. Based on an evaluation of the factors under paragraph (a) of this section, trustees must select a preferred restoration alternative(s). If the trustees conclude that two or more alternatives are equally preferable based on these factors, the trustees must select the most cost-effective alternative. (c) Pilot projects. Where additional information is needed to identify and evaluate the feasibility and likelihood of success of restoration alternatives, trustees may implement restoration pilot projects. Pilot projects should only be undertaken when, in the judgment of the trustees, these projects are likely to provide the information, described in paragraph (a) of this section, at a reasonable cost and in a reasonable time frame. | ||||
| 15:15:4.1.2.5.22.5.33.6 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.55 Restoration selection—developing restoration plans. | NOAA | (a) General. OPA requires that damages be based upon a plan developed with opportunity for public review and comment. To meet this requirement, trustees must, at a minimum, develop a Draft and Final Restoration Plan, with an opportunity for public review of and comment on the draft plan. (b) Draft Restoration Plan. (1) The Draft Restoration Plan should include: (i) A summary of injury assessment procedures used; (ii) A description of the nature, degree, and spatial and temporal extent of injuries resulting from the incident; (iii) The goals and objectives of restoration; (iv) The range of restoration alternatives considered, and a discussion of how such alternatives were developed under § 990.53 of this part, and evaluated under § 990.54 of this part; (v) Identification of the trustees' tentative preferred alternative(s); (vi) A description of past and proposed involvement of the responsible parties in the assessment; and (vii) A description of monitoring for documenting restoration effectiveness, including performance criteria that will be used to determine the success of restoration or need for interim corrective action. (2) When developing the Draft Restoration Plan, trustees must establish restoration objectives that are specific to the injuries. These objectives should clearly specify the desired outcome, and the performance criteria by which successful restoration will be judged. Performance criteria may include structural, functional, temporal, and/or other demonstrable factors. Trustees must, at a minimum, determine what criteria will: (i) Constitute success, such that responsible parties are relieved of responsibility for further restoration actions; or (ii) Necessitate corrective actions in order to comply with the terms of a restoration plan or settlement agreement. (3) The monitoring component to the Draft Restoration Plan should address such factors as duration and frequency of monitoring needed to gauge progress and success, level of sampling needed to detect success or the need for … | ||||
| 15:15:4.1.2.5.22.5.33.7 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | E | Subpart E—Restoration Planning Phase | § 990.56 Restoration selection—use of a Regional Restoration Plan or existing restoration project. | NOAA | (a) General. Trustees may consider using a Regional Restoration Plan or existing restoration project where such a plan or project is determined to be the preferred alternative among a range of feasible restoration alternatives for an incident, as determined under § 990.54 of this part. Such plans or projects must be capable of fulfilling OPA's intent for the trustees to restore, rehabilitate, replace, or acquire the equivalent of the injured natural resources and services and compensate for interim losses. (b) Existing plans or projects —(1) Considerations. Trustees may select a component of a Regional Restoration Plan or an existing restoration project as the preferred alternative, provided that the plan or project: (i) Was developed with public review and comment or is subject to public review and comment under this part; (ii) Will adequately compensate the environment and public for injuries resulting from the incident; (iii) Addresses, and is currently relevant to, the same or comparable natural resources and services as those identified as having been injured; and (iv) Allows for reasonable scaling relative to the incident. (2) Demand. (i) If the conditions of paragraph (b)(1) of this section are met, the trustees must invite the responsible parties to implement that component of the Regional Restoration Plan or existing restoration project, or advance to the trustees the trustees' reasonable estimate of the cost of implementing that component of the Regional Restoration Plan or existing restoration project. (ii) If the conditions of paragraph (b)(1) of this section are met, but the trustees determine that the scale of the existing plan or project is greater than the scale of compensation required by the incident, trustees may only request funding from the responsible parties equivalent to the scale of the restoration determined to be appropriate for the incident of concern. Trustees may pool such partial recoveries until adequate funding is available to successfully implement the existing plan… | ||||
| 15:15:4.1.2.5.22.6.33.1 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.60 Purpose. | NOAA | The purpose of this subpart is to provide a process for implementing restoration. | ||||
| 15:15:4.1.2.5.22.6.33.2 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.61 Administrative record. | NOAA | (a) Closing the administrative record for restoration planning. Within a reasonable time after the trustees have completed restoration planning, as provided in §§ 990.55 and 990.56 of this part, they must close the administrative record. Trustees may not add documents to the administrative record once it is closed, except where such documents: (1) Are offered by interested parties that did not receive actual or constructive notice of the Draft Restoration Plan and the opportunity to comment on the plan; (2) Do not duplicate information already contained in the administrative record; and (3) Raise significant issues regarding the Final Restoration Plan. (b) Opening an administrative record for restoration implementation. Trustees may open an administrative record for implementation of restoration, as provided in § 990.45 of this part. The costs associated with the administrative record are part of the costs of restoration. Ordinarily, the administrative record for implementation of restoration should document, at a minimum, all Restoration Implementation Phase decisions, actions, and expenditures, including any modifications made to the Final Restoration Plan. | ||||
| 15:15:4.1.2.5.22.6.33.3 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.62 Presenting a demand. | NOAA | [61 FR 500, Jan. 5, 1996, as amended at 67 FR 61493, Oct. 1, 2002] | (a) General. After closing the administrative record for restoration planning, trustees must present a written demand to the responsible parties. Delivery of the demand should be made in a manner that establishes the date of receipt by the responsible parties. (b) When a Final Restoration Plan has been developed. Except as provided in paragraph (c) of this section and in § 990.14(c) of this part, the demand must invite the responsible parties to either: (1) Implement the Final Restoration Plan subject to trustee oversight and reimburse the trustees for their assessment and oversight costs; or (2) Advance to the trustees a specified sum representing all trustee direct and indirect costs of assessment and restoration, discounted as provided in § 990.63(a) of this part. (c) Regional Restoration Plan or existing restoration project. When the trustees use a Regional Restoration Plan or an existing restoration project under § 990.56 of this part, the demand will invite the responsible parties to implement a component of a Regional Restoration Plan or existing restoration project, or advance the trustees' estimate of damages based on the scale of the restoration determined to be appropriate for the incident of concern, which may be the entire project or a portion thereof. (d) Response to demand. The responsible parties must respond within ninety (90) calendar days in writing by paying or providing binding assurance they will reimburse trustees' assessment costs and implement the plan or pay assessment costs and the trustees' estimate of the costs of implementation. (e) Additional contents of demand. The demand must also include: (1) Identification of the incident from which the claim arises; (2) Identification of the trustee(s) asserting the claim and a statement of the statutory basis for trusteeship; (3) A brief description of the injuries for which the claim is being brought; (4) An index to the administrative record; (5) The Final Restoration Plan or Notice of Intent to Use a Regional Restoratio… | |||
| 15:15:4.1.2.5.22.6.33.4 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.63 Discounting and compounding. | NOAA | (a) Estimated future restoration costs. When determining estimated future costs of implementing a Final Restoration Plan, trustees must discount such future costs back to the date the demand is presented. Trustees may use a discount rate that represents the yield on recoveries available to trustees. The price indices used to project future inflation should reflect the major components of the restoration costs. (b) Past assessment and emergency restoration costs. When calculating the present value of assessment and emergency restoration costs already incurred, trustees must compound the costs forward to the date the demand is presented. To perform the compounding, trustees may use the actual U.S. Treasury borrowing rate on marketable securities of comparable maturity to the period of analysis. For costs incurred by state or tribal trustees, trustees may compound using parallel state or tribal borrowing rates. (c) Trustees are referred to Appendices B and C of OMB Circular A-94 for information about U.S. Treasury rates of various maturities and guidance in calculation procedures. Copies of Appendix C, which is regularly updated, and of the Circular are available from the OMB Publications Office (202-395-7332). | ||||
| 15:15:4.1.2.5.22.6.33.5 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.64 Unsatisfied demands. | NOAA | [61 FR 500, Jan. 5, 1996, as amended at 67 FR 61493, Oct. 1, 2002] | (a) If the responsible parties do not agree to the demand within ninety (90) calendar days after trustees present the demand, the trustees may either file a judicial action for damages or present the uncompensated claim for damages to the Oil Spill Liability Trust Fund, as provided in section 1012(a)(4) of OPA (33 U.S.C. 2712(a)(4)) or seek an appropriation from the Oil Spill Liability Trust Fund as provided in section 1012(a)(2) of OPA (33 U.S.C. 2712(a)(2)). (b) Judicial actions and claims must be filed within three (3) years after the Final Restoration Plan or Notice of Intent to Use a Regional Restoration Plan or Existing Restoration Project is made publicly available, in accordance with 33 U.S.C. 2717(f)(1)(B) and 2712(h)(2). | |||
| 15:15:4.1.2.5.22.6.33.6 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.65 Opening an account for recovered damages. | NOAA | (a) General. Sums recovered by trustees in satisfaction of a natural resource damage claim must be placed in a revolving trust account. Sums recovered for past assessment costs and emergency restoration costs may be used to reimburse the trustees. All other sums must be used to implement the Final Restoration Plan or all or an appropriate component of a Regional Restoration Plan or an existing restoration project. (b) Joint trustee recoveries —(1) General. Trustees may establish a joint account for damages recovered pursuant to joint assessment activities, such as an account under the registry of the applicable federal court. (2) Management. Trustees may develop enforceable agreements to govern management of joint accounts, including agreed-upon criteria and procedures, and personnel for authorizing expenditures out of such joint accounts. (c) Interest-bearing accounts. Trustees may place recoveries in interest-bearing revolving trust accounts, as provided by section 1006(f) of OPA (33 U.S.C. 2706(f)). Interest earned on such accounts may only be used for restoration. (d) Escrow accounts. Trustees may establish escrow accounts or other investment accounts. (e) Records. Trustees must maintain appropriate accounting and reporting procedures to document expenditures from accounts established under this section. (f) Oil Spill Liability Trust Fund. Any sums remaining in an account established under this section that are not used either to reimburse trustees for past assessment and emergency restoration costs or to implement restoration must be deposited in the Oil Spill Liability Trust Fund, as provided by section 1006(f) of OPA (33 U.S.C. 2706(f)). | ||||
| 15:15:4.1.2.5.22.6.33.7 | 15 | Commerce and Foreign Trade | IX | E | 990 | PART 990—NATURAL RESOURCE DAMAGE ASSESSMENTS | F | Subpart F—Restoration Implementation Phase | § 990.66 Additional considerations. | NOAA | (a) Upon settlement of a claim, trustees should consider the following actions to facilitate implementation of restoration: (1) Establish a trustee committee and/or memorandum of understanding or other agreement to coordinate among affected trustees, as provided in § 990.14(a)(3) of this part; (2) Develop more detailed workplans to implement restoration; (3) Monitor and oversee restoration; and (4) Evaluate restoration success and the need for corrective action. (b) The reasonable costs of such actions are included as restoration costs. | ||||
| 24:24:4.1.3.1.23.1.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | A | Subpart A—Purpose, Applicability, Formula, and Definitions | § 990.100 Purpose. | HUD | This part implements section 9(f) of the United States Housing Act of 1937 (1937 Act), (42 U.S.C. 1437g). Section 9(f) establishes an Operating Fund for the purposes of making assistance available to public housing agencies (PHAs) for the operation and management of public housing. In the case of unsubsidized housing, the total expenses of operating rental housing should be covered by the operating income, which primarily consists of rental income and, to some degree, investment and non-rental income. In the case of public housing, the Operating Fund provides operating subsidy to assist PHAs to serve low, very low, and extremely low-income families. This part describes the policies and procedures for Operating Fund formula calculations and management under the Operating Fund Program. | |||||
| 24:24:4.1.3.1.23.1.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | A | Subpart A—Purpose, Applicability, Formula, and Definitions | § 990.105 Applicability. | HUD | (a) Applicability of this part. (1) With the exception of subpart I of this part, this part is applicable to all PHA rental units under an Annual Contributions Contract (ACC). This includes PHAs that have not received operating subsidy previously, but are eligible for operating subsidy under the Operating Fund Formula. (2) This part is applicable to all rental units managed by a resident management corporation (RMC), including a direct-funded RMC. (b) Inapplicability of this part. (1) This part is not applicable to Indian Housing, section 5(h) and section 32 homeownership projects, the Housing Choice Voucher Program, the section 23 Leased Housing Program, or the section 8 Housing Assistance Payments Programs. (2) With the exception of subpart J of this part, this part is not applicable to the Mutual Help Program or the Turnkey III Homeownership Opportunity Program. | |||||
| 24:24:4.1.3.1.23.1.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | A | Subpart A—Purpose, Applicability, Formula, and Definitions | § 990.110 Operating fund formula. | HUD | (a) General formula. (1) The amount of annual contributions (operating subsidy) each PHA is eligible to receive under this part shall be determined by a formula. (2) In general, operating subsidy shall be the difference between formula expense and formula income. If a PHA's formula expense is greater than its formula income, then the PHA is eligible for an operating subsidy. (3) Formula expense is an estimate of a PHA's operating expense and is determined by the following three components: Project Expense Level (PEL), Utility Expense Level (UEL), and other formula expenses (add-ons). Formula expense and its three components are further described in subpart C of this part. Formula income is an estimate for a PHA's non-operating subsidy revenue and is further described in subpart D of this part. (4) Certain portions of the operating fund formula ( e.g. , PEL) are calculated in terms of per unit per month (PUM) amounts and are converted into whole dollars by multiplying the PUM amount by the number of eligible unit months (EUMs). EUMs are further described in subpart B of this part. (b) Specific formula. (1) A PHA's formula amount shall be the sum of the three formula expense components calculated as follows: {[(PEL multiplied by EUM) plus (UEL multiplied by EUM) plus add-ons] minus (formula income multiplied by EUM)}. (2) A PHA whose formula amount is equal to or less than zero is still eligible to receive operating subsidy equal to its most recent actual audit cost for its Operating Fund Program. (3) Operating subsidy payments will be limited to the availability of funds as described in § 990.210(c). (c) Non-codified formula elements. This part defines the major components of the Operating Fund Formula and describes the relationships of these various components. However, this part does not codify certain secondary elements that will be used in the revised Operating Fund Formula. HUD will more appropriately provide this information in non-codified guidance, such as a Handbook, Federal Register notice… | |||||
| 24:24:4.1.3.1.23.1.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | A | Subpart A—Purpose, Applicability, Formula, and Definitions | § 990.115 Definitions. | HUD | The following definitions apply to the Operating Fund program: 1937 Act means the United States Housing Act of 1937 (42 U.S.C. 1437 et seq. ). Annual contributions contract (ACC) is a contract prescribed by HUD for loans and contributions, which may be in the form of operating subsidy, whereby HUD agrees to provide financial assistance and the PHA agrees to comply with HUD requirements for the development and operation of its public housing projects. Asset management is a management model that emphasizes project-based management, as well as long-term and strategic planning. Current consumption level is the amount of each utility consumed at a project during the 12-month period that ended the June 30th prior to the beginning of the applicable funding period. Eligible unit months (EUM) are the actual number of PHA units in eligible categories expressed in months for a specified time frame and for which a PHA receives operating subsidy. Formula amount is the amount of operating subsidy a PHA is eligible to receive, expressed in whole dollars, as determined by the Operating Fund Formula. Formula expense is an estimate of a PHA's operating expense used in the Operating Fund Formula. Formula income is an estimate of a PHA's non-operating subsidy revenue used in the Operating Fund Formula. Funding period is the calendar year for which HUD will distribute operating subsidy according to the Operating Fund Formula. Operating Fund is the account/program authorized by section 9 of the 1937 Act for making operating subsidy available to PHAs for the operation and management of public housing. Operating Fund Formula (or Formula) means the data and calculations used under this part to determine a PHA's amount of operating subsidy for a given period. Operating subsidy is the amount of annual contributions for operations a PHA receives each funding period under section 9 of the 1937 Act as determined by the Operating Fund Formula in this part. Other operating costs (add-ons) means PHA expenses that are r… | |||||
| 24:24:4.1.3.1.23.1.41.5 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | A | Subpart A—Purpose, Applicability, Formula, and Definitions | § 990.116 Environmental review requirements. | HUD | The environmental review procedures of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)(C)) and the implementing regulations at 24 CFR parts 50 and 58 are applicable to the Operating Fund Program. | |||||
| 24:24:4.1.3.1.23.10.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | J | Subpart J—Financial Management Systems, Monitoring, and Reporting | § 990.310 Purpose—General policy on financial management, monitoring and reporting. | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 80 FR 75943, Dec. 7, 2015] | All PHA financial management systems, reporting, and monitoring of program performance and financial reporting shall be in compliance with the requirements of 2 CFR part 200. Certain HUD requirements provide exceptions for additional specialized procedures that are determined by HUD to be necessary for the proper management of the program in accordance with the requirements of the 1937 Act and the ACC between each PHA and HUD. | ||||
| 24:24:4.1.3.1.23.10.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | J | Subpart J—Financial Management Systems, Monitoring, and Reporting | § 990.315 Submission and approval of operating budgets. | HUD | (a) Required documentation: (1) Prior to the beginning of its fiscal year, a PHA shall prepare an operating budget in a manner prescribed by HUD. The PHA's Board of Commissioners shall review and approve the budget by resolution. Each fiscal year, the PHA shall submit to HUD, in a time and manner prescribed by HUD, the approved Board resolution. (2) HUD may direct the PHA to submit its complete operating budget with detailed supporting information and the Board resolution if the PHA has breached the ACC contract, or for other reasons, which, in HUD's determination, threaten the PHA's future serviceability, efficiency, economy, or stability. When the PHA no longer is operating in a manner that threatens the future serviceability, efficiency, economy, or stability of the housing it operates, HUD will notify the PHA that it no longer is required to submit a complete operating budget with detailed supporting information to HUD for review and approval. (b) If HUD finds that an operating budget is incomplete, inaccurate, includes illegal or ineligible expenditures, contains mathematical errors or errors in the application of accounting procedures, or is otherwise unacceptable, HUD may, at any time, require the PHA to submit additional or revised information regarding the budget or revised budget. | |||||
| 24:24:4.1.3.1.23.10.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | J | Subpart J—Financial Management Systems, Monitoring, and Reporting | § 990.320 Audits. | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 80 FR 75943, Dec. 7, 2015] | All PHAs that receive financial assistance under this part shall submit an acceptable audit and comply with the audit requirements in 2 CFR part 200, subpart F. | ||||
| 24:24:4.1.3.1.23.10.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | J | Subpart J—Financial Management Systems, Monitoring, and Reporting | § 990.325 Record retention requirements. | HUD | The PHA shall retain all documents related to all financial management and activities funded under the Operating Fund for a period of five fiscal years after the fiscal year in which the funds were received. | |||||
| 24:24:4.1.3.1.23.2.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.120 Unit months. | HUD | (a) Some of the components of HUD's Operating Fund Formula are based on a measure known as unit months. Unit months represent a PHA's public housing inventory during a specified period of time. The unit months eligible for operating subsidy in a 12-month period are equal to the number of months that the units are in an operating subsidy-eligible category, adjusted for changes in inventory ( e.g. , units added or removed), as described below. (b) A PHA is eligible to receive operating subsidy for a unit on the date it is both placed under the ACC and occupied. The date a unit is eligible for operating subsidy does not change the Date of Full Availability (DOFA) or the date of the End of Initial Operating Period (EIOP), nor does this provision place a project into management status. | |||||
| 24:24:4.1.3.1.23.2.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.125 Eligible units. | HUD | A PHA is eligible to receive operating subsidy for public housing units under an ACC for: (a) Occupied dwelling units as defined in § 990.140; (b) A dwelling unit with an approved vacancy (as defined in § 990.145); and (c) A limited number of vacancies (as defined in § 990.150). | |||||
| 24:24:4.1.3.1.23.2.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.130 Ineligible units. | HUD | (a) Vacant units that do not fall within the definition of § 990.145 or § 990.150 are not eligible for operating subsidy under this part. (b) Units that are eligible to receive an asset-repositioning fee, as described in § 990.190(h), are not eligible to receive operating subsidy under this subpart. | |||||
| 24:24:4.1.3.1.23.2.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.135 Eligible unit months (EUMs). | HUD | (a) A PHA's total number of EUMs will be calculated for the 12-month period from July 1st to June 30th that is prior to the first day of the applicable funding period, and will consist of eligible units as defined in § 990.140, § 990.145, or § 990.150. (b)(1) The determination of whether a public housing unit satisfies the requirements of § 990.140, § 990.145, or § 990.150 for any unit month shall be based on the unit's status as of either the first or last day of the month, as determined by the PHA. (2) HUD reserves the right to determine the status of any and all public housing units based on information in its information systems. (c) The PHA shall maintain and, at HUD's request, shall make available to HUD, specific documentation of the status of all units, including, but not limited to, a listing of the units, street addresses or physical address, and project/management control numbers. (d) Any unit months that do not meet the requirements of this subpart are not eligible for operating subsidy, and will not be subsidized by the Operating Fund. | |||||
| 24:24:4.1.3.1.23.2.41.5 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.140 Occupied dwelling units. | HUD | A PHA is eligible to receive operating subsidy for public housing units for each unit month that those units are under an ACC and occupied by a public housing-eligible family under lease. | |||||
| 24:24:4.1.3.1.23.2.41.6 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.145 Dwelling units with approved vacancies. | HUD | (a) A PHA is eligible to receive operating subsidy for vacant public housing units for each unit month the units are under an ACC and meet one of the following HUD-approved vacancies: (1) Units undergoing modernization. Vacancies resulting from project modernization or unit modernization (such as work necessary to reoccupy vacant units) provided that one of the following conditions is met: (i) The unit is undergoing modernization ( i.e. , the modernization contract has been awarded or force account work has started) and must be vacant to perform the work, and the construction is on schedule according to a HUD-approved PHA Annual Plan; or (ii) The unit must be vacant to perform the work and the treatment of the vacant unit is included in a HUD-approved PHA Annual Plan, but the time period for placing the vacant unit under construction has not yet expired. The PHA shall place the vacant unit under construction within two federal fiscal years (FFYs) after the FFY in which the capital funds are approved. (2) Special use units. Units approved and used for resident services, resident organization offices, and related activities, such as self-sufficiency and anti-crime initiatives. (b) On a project-by-project basis, subject to prior HUD approval and for the time period agreed to by HUD, a PHA shall receive operating subsidy for the units affected by the following events that are outside the control of the PHA: (1) Litigation. Units that are vacant due to litigation, such as a court order or settlement agreement that is legally enforceable; units that are vacant in order to meet regulatory and statutory requirements to avoid potential litigation (as covered in a HUD-approved PHA Annual Plan); and units under voluntary compliance agreements with HUD or other voluntary compliance agreements acceptable to HUD ( e.g. , units that are being held vacant as part of a court-order, HUD-approved desegregation plan, or voluntary compliance agreement requiring modifications to the units to make them accessible pursuant t… | |||||
| 24:24:4.1.3.1.23.2.41.7 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.150 Limited vacancies. | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 81 FR 12377, Mar. 8, 2016] | (a) Operating subsidy for a limited number of vacancies. HUD will pay operating subsidy for a limited number of vacant units under an ACC. The limited number of vacant units must be equal to or less than 3 percent of the unit months on a project-by-project basis based on the definition of a project under § 990.265 (provided that the number of eligible unit months does not exceed 100 percent of the unit months for a project). (b) Exception for PHAs with 100 or fewer units. Notwithstanding paragraph (a) of this section, a PHA with 100 or fewer units will be paid operating subsidy for up to five vacant units not to exceed 100 percent of the unit months under an ACC. For example, a PHA with an inventory of 100 units and four vacancies during its fiscal year will be eligible for operating subsidy for all 100 units. A PHA with an inventory of 50 units with seven vacancies during its fiscal year will be eligible for operating subsidy for 48 units. | ||||
| 24:24:4.1.3.1.23.2.41.8 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | B | Subpart B—Eligibility for Operating Subsidy; Computation of Eligible Unit Months | § 990.155 Addition and deletion of units. | HUD | (a) Changes in public housing unit inventory. To generate a change to its formula amount within each one-year funding period, PHAs shall periodically ( e.g. , quarterly) report the following information to HUD, during the funding period: (1) New units that were added to the ACC, and occupied by a public housing-eligible family during the prior reporting period for the one-year funding period, but have not been included in the previous EUMs' data; and (2) Projects, or entire buildings in a project, that are eligible to receive an asset repositioning fee in accordance with the provisions in § 990.190(h). (b) Revised EUM calculation. (1) For new units, the revised calculation shall assume that all such units will be fully occupied for the balance of that funding period. The actual occupancy/vacancy status of these units will be included to calculate the PHA's operating subsidy in the subsequent funding period after these units have one full year of a reporting cycle. (2) Projects, or entire buildings in a project, that are eligible to receive an asset repositioning fee in accordance with § 990.190(h) are not to be included in the calculation of EUMs. Funding for these units is provided under the conditions described in § 990.190(h). | |||||
| 24:24:4.1.3.1.23.3.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.160 Overview of calculating formula expenses. | HUD | (a) General. Formula expenses represent the costs of services and materials needed by a well-run PHA to sustain the project. These costs include items such as administration, maintenance, and utilities. HUD also determines a PHA's formula expenses at a project level. HUD uses the following three factors to determine the overall formula expense level for each project: (1)The project expense level (PEL) (calculated in accordance with § 990.165); (2) The utilities expense level (UEL) (calculated in accordance with §§ 990.170, 990.175, 990.180, and 990.185); and (3)Other formula expenses (add-ons) (calculated in accordance with § 990.190). (b) PEL, UEL, and Add-ons. Each project of a PHA has a unique PEL and UEL. The PEL for each project is based on ten characteristics and certain adjustments described in § 990.165. The PEL represents the normal expenses of operating public housing projects, such as maintenance and administration costs. The UEL for each project represents utility expenses. Utility expense levels are based on an incentive system aimed at reducing utility expenses. Both the PEL and UEL are expressed in PUM costs. The expenses not included in these expense levels and which are unique to PHAs are titled “other formula expenses (add-ons)” and are expressed in a dollar amount. (c) Calculating project formula expense. The formula expense of any one project is the sum of the project's PEL and the UEL, multiplied by the total EUMs specific to the project, plus the add-ons. | |||||
| 24:24:4.1.3.1.23.3.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.165 Computation of project expense level (PEL). | HUD | (a) Computation of PEL. The PEL is calculated in terms of PUM cost and represents the costs associated with the project, except for utility and add-on costs. Costs associated with the PEL are administration, management fees, maintenance, protective services, leasing, occupancy, staffing, and other expenses, such as project insurance. HUD will calculate the PEL using regression analysis and benchmarking for the actual costs of Federal Housing Administration (FHA) projects to estimate costs for public housing projects. HUD will use the ten variables described in paragraph (b) of this section and their associated coefficient ( i.e. , values that are expressed in percentage terms) to produce a PEL. (b) Variables. The ten variables are: (1) Size of project (number of units); (2) Age of property (Date of Full Availability (DOFA)); (3) Bedroom mix; (4) Building type; (5) Occupancy type (family or senior); (6) Location (an indicator of the type of community in which a property is located; location types include rural, city central metropolitan, and non-city central metropolitan (suburban) areas); (7) Neighborhood poverty rate; (8) Percent of households assisted; (9) Ownership type (profit, non-profit, or limited dividend); and (10) Geographic. (c) Cost adjustments. HUD will apply four adjustments to the PEL. The adjustments are: (1) Application of a $200 PUM floor for any senior property and a $215 PUM floor for any family property; (2) Application of a $420 PUM ceiling for any property except for New York City Housing Authority projects, which have a $480 PUM ceiling; (3) Application of a four percent reduction for any PEL calculated over $325 PUM, with the reduction limited so that a PEL will not be reduced to less than $325; and (4) The reduction of audit costs as reported for FFY 2003 in a PUM amount. (d) Annual inflation factor. The PEL for each project shall be adjusted annually, beginning in 2005, by the local inflation factor. The local inflation factor shall be the HUD-determined weighte… | |||||
| 24:24:4.1.3.1.23.3.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.170 Computation of utilities expense level (UEL): Overview. | HUD | (a) General. The UEL for each PHA is based on its consumption for each utility, the applicable rates for each utility, and an applicable inflation factor. The UEL for a given funding period is the product of the utility rate multiplied by the payable consumption level multiplied by the inflation factor. The UEL is expressed in terms of PUM costs. (b) Utility rate. The utility rate for each type of utility will be the actual average rate from the most recent 12-month period that ended June 30th prior to the beginning of the applicable funding period. The rate will be calculated by dividing the actual utility cost by the actual utility consumption, with consideration for pass-through costs ( e.g. , state and local utility taxes, tariffs) for the time period specified in this paragraph. (c) Payable consumption level. The payable consumption level is based on the current consumption level adjusted by a utility consumption incentive. The incentive shall be computed by comparing current consumption levels of each utility to the rolling base consumption level. If the comparison reflects a decrease in the consumption of a utility, the PHA shall retain 75 percent of this decrease. Alternately, if the comparison reflects an increase in the consumption of a utility, the PHA shall absorb 75 percent of this increase. (d) Inflation factor for utilities. The UEL shall be adjusted annually by an inflation/deflation factor based upon the fuels and utilities component of the United States Department of Labor, Bureau of Labor Statistics (BLS) Consumer Price Index for All Urban Consumers (CPI-U). The annual adjustment to the UEL shall reflect the most recently published and localized data available from BLS at the time the annual adjustment is calculated. (e) Increases in tenant utility allowances. Increases in tenant utility allowances, as a component of the formula income, as described in § 990.195, shall result in a commensurate increase of operating subsidy. Decreases in such utility allowances shall result in a co… | |||||
| 24:24:4.1.3.1.23.3.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.175 Utilities expense level: Computation of the current consumption level. | HUD | The current consumption level shall be the actual amount of each utility consumed during the 12-month period ending June 30th that is 6 months prior to the first day of the applicable funding period. | |||||
| 24:24:4.1.3.1.23.3.41.5 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.180 Utilities expense level: Computation of the rolling base consumption level. | HUD | (a) General. (1) The rolling base consumption level (RBCL) shall be equal to the average of yearly consumption levels for the 36-month period ending on the June 30th that is 18 months prior to the first day of the applicable funding period. (2) The yearly consumption level is the actual amount of each utility consumed during a 12-month period ending June 30th. For example, for the funding period January 1, 2006, through December 31, 2006, the RBCL will be the average of the following yearly consumption levels: (i) Year 1 = July 1, 2001, through June 30, 2002. (ii) Year 2 = July 1, 2002, through June 30, 2003. (iii) Year 3 = July 1, 2003, through June 30, 2004. In this example, the current year's consumption level will be July 1, 2004, through June 30, 2005. (b) Distortions to rolling base consumption level. The PHA shall have its RBCL determined so as not to distort the rolling base period in accordance with a method prescribed by HUD if: (1) A project has not been in operation during at least 12 months of the rolling base period; (2) A project enters or exits management after the rolling base period and prior to the end of the applicable funding period; or (3) A project has experienced a conversion from one energy source to another, switched from PHA-supplied to resident-purchased utilities during or after the rolling base period, or for any other reason that would cause the RBCL not to be comparable to the current year's consumption level. (c) Financial incentives. The three-year rolling base for all relevant utilities will be adjusted to reflect any financial incentives to the PHA to reduce consumption as described in § 990.185. | |||||
| 24:24:4.1.3.1.23.3.41.6 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.185 Utilities expense level: Incentives for energy conservation/rate reduction. | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 73 FR 61352, Oct. 16, 2008] | (a) General/consumption reduction. If a PHA undertakes energy conservation measures that are financed by an entity other than HUD, the PHA may qualify for the incentives available under this section. For a PHA to qualify for these incentives, the PHA must enter into a contract to finance the energy conservation measures, and must obtain HUD approval. Such approval shall be based on a determination that payments under a contract can be funded from reasonably anticipated energy cost savings. The contract period shall not exceed 20 years. The energy conservation measures may include, but are not limited to: Physical improvements financed by a loan from a bank, utility, or governmental entity; management of costs under the performance contract; or a shared savings agreement with a private energy service company. All such contracts shall be known as energy performance contracts. PHAs may extend an executed energy performance contract with a term of less than 20 years to a term of not more than 20 years, to permit additional energy conservation improvements without the reprocurement of energy performance contractors. The PHA must obtain HUD approval to extend the term of an executed energy performance contract. (1) Frozen rolling base. (i) If a PHA undertakes energy conservation measures that are approved by HUD, the RBCL for the project and the utilities involved may be frozen during the contract period. Before the RBCL is frozen, it must be adjusted to reflect any energy savings resulting from the use of any HUD funding. The RBCL also may be adjusted to reflect systems repaired to meet applicable building and safety codes as well as to reflect adjustments for occupancy rates increased by rehabilitation. The RBCL shall be frozen at the level calculated for the year during which the conservation measures initially shall be implemented. (ii) The PHA operating subsidy eligibility shall reflect the retention of 100 percent of the savings from decreased consumption until the term of the financing agreement is complet… | ||||
| 24:24:4.1.3.1.23.3.41.7 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | C | Subpart C—Calculating Formula Expenses | § 990.190 Other formula expenses (add-ons). | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 80 FR 75943, Dec. 7, 2015] | In addition to calculating operating subsidy based on the PEL and UEL, a PHA's eligible formula expenses shall be increased by add-ons. The allowed add-ons are: (a) Self-sufficiency. A PHA may request operating subsidy for the reasonable cost of program coordinator(s) and associated costs in accordance with HUD's self-sufficiency program regulations and notices. (b) Energy loan amortization. A PHA may qualify for operating subsidy for payments of principal and interest cost for energy conservation measures described in § 990.185(a)(3). (c) Payments in lieu of taxes (PILOT). Each PHA will receive an amount for PILOT in accordance with section 6(d) of the 1937 Act, based on its cooperation agreement or its latest actual PILOT payment. (d) Cost of independent audits. A PHA is eligible to receive operating subsidy equal to its most recent actual audit costs for the Operating Fund Program when an audit is required by the Single Audit Act (31 U.S.C. 7501-7507) (see 2 CFR part 200, subpart F) or when a PHA elects to prepare and submit such an audit to HUD. For the purpose of this rule, the most recent actual audit costs include the associated costs of an audit for the Operating Fund Program only. A PHA whose operating subsidy is determined to be zero based on the formula is still eligible to receive operating subsidy equal to its most recent actual audit costs. The most recent actual audit costs are used as a proxy to cover the cost of the next audit. If a PHA does not have a recent actual audit cost, the PHA working with HUD may establish an audit cost. A PHA that requests funding for an audit shall complete an audit. The results of the audit shall be transmitted in a time and manner prescribed by HUD. (e) Funding for resident participation activities. Each PHA's operating subsidy calculation shall include $25 per occupied unit per year for resident participation activities, including, but not limited to, those described in 24 CFR part 964. For purposes of this section, a unit is eligible to receive resi… | ||||
| 24:24:4.1.3.1.23.4.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | D | Subpart D—Calculating Formula Income | § 990.195 Calculation of formula income. | HUD | [70 FR 54997, Sept. 19, 2005; 70 FR 61367, Oct. 24, 2005; 80 FR 75943, Dec. 7, 2015] | (a) General. For the purpose of the formula, formula income is equal to the amount of rent charged to tenants divided by the respective unit months leased, and is therefore expressed as a PUM. Formula income will be derived from a PHA's year-end financial information. The financial information used in the formula income computation will be the audited information provided by the PHA through HUD's information systems. The information will be calculated using the following PHA fiscal year-end information: (1) April 1, 2003, through March 31, 2004; (2) July 1, 2003, through June 30, 2004; (3) October 1, 2003, through September 30, 2004; and (4) January 1, 2004, through December 31, 2004. (b) Calculation of formula income. To calculate formula income in whole dollars, the PUM amount will be multiplied by the EUMs as described in subpart B of this part. (c) Frozen at 2004 level. After a PHA's formula income is calculated as described in paragraph (a) of this section, it will not be recalculated or inflated for fiscal years 2007 through 2009, unless a PHA can show a severe local economic hardship that is impacting the PHA's ability to maintain some semblance of its formula income (see subpart G of this part—Appeals). A PHA's formula income may be recalculated if the PHA appeals to HUD for an adjustment in its formula. (d) Calculation of formula income when data are inadequate or unavailable. When audited data are unavailable in HUD's information systems for the calculation of formula income, HUD may use an alternative methodology, including, but not limited to, certifications, hard copy reports, and communications with the respective PHAs. (e) Inapplicability of 24 CFR 85.25 (as revised April 1, 2013). Formula income is not subject to the provisions regarding program income in 24 CFR 85.25 (as revised April 1, 2013). | ||||
| 24:24:4.1.3.1.23.5.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | E | Subpart E—Determination and Payment of Operating Subsidy | § 990.200 Determination of formula amount. | HUD | (a) General. The amount of operating subsidy that a PHA is eligible for is the difference between its formula expenses (as calculated under subpart C of this part) and its formula income (as calculated under subpart D of this part). (b) Use of HUD databases to calculate formula amount. HUD shall utilize its databases to make the formula calculations. HUD's databases are intended to be employed to provide information on all primary factors in determining the operating subsidy amount. Each PHA is responsible for supplying accurate information on the status of each of its units in HUD's databases. (c) PHA responsibility to submit timely data. PHAs shall submit data used in the formula on a regular and timely basis to ensure accurate calculation under the formula. If a PHA fails to provide accurate data, HUD will make a determination as to the PHA's inventory, occupancy, and financial information using available or verified data, which may result in a lower operating subsidy. HUD has the right to adjust any or all formula amounts based on clerical, mathematical, and information system errors that affect any of the data elements used in the calculation of the formula. | |||||
| 24:24:4.1.3.1.23.5.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | E | Subpart E—Determination and Payment of Operating Subsidy | § 990.205 Fungibility of operating subsidy between projects. | HUD | (a) General. Operating subsidy shall remain fully fungible between ACC projects until operating subsidy is calculated by HUD at a project level. After subsidy is calculated at a project level, operating subsidy can be transferred as the PHA determines during the PHA's fiscal year to another ACC project(s) if a project's financial information, as described more fully in § 990.280, produces excess cash flow, and only in the amount up to those excess cash flows. (b) Notwithstanding the provisions of paragraph (a) of this section and subject to all of the other provisions of this part, the New York City Housing Authority's Development Grant Project Amendment Number 180, dated July 13, 1995, to Consolidated Annual Contributions Contract NY-333, remains in effect. | |||||
| 24:24:4.1.3.1.23.5.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | E | Subpart E—Determination and Payment of Operating Subsidy | § 990.210 Payment of operating subsidy. | HUD | (a) Payments of operating subsidy under the formula. HUD shall make monthly payments equal to 1/12 of a PHA's total annual operating subsidy under the formula by electronic funds transfers through HUD's automated disbursement system. HUD shall establish thresholds that permit PHAs to request monthly installments. Requests by PHAs that exceed these thresholds will be subject to HUD review. HUD approvals of requests that exceed these thresholds are limited to PHAs that have an unanticipated and immediate need for disbursement. (b) Payments procedure. In the event that the amount of operating subsidy has not been determined by HUD as of the beginning of the funding period, operating subsidy shall be provided monthly, quarterly, or annually based on the amount of the PHA's previous year's formula or another amount that HUD may determine to be appropriate. (c) Availability of funds. In the event that insufficient funds are available, HUD shall have discretion to revise, on a pro rata basis, the amounts of operating subsidy to be paid to PHAs. | |||||
| 24:24:4.1.3.1.23.5.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | E | Subpart E—Determination and Payment of Operating Subsidy | § 990.215 Payments of operating subsidy conditioned upon reexamination of income of families in occupancy. | HUD | (a) General. Each PHA is required to reexamine the income of each family in accordance with the provisions of the ACC, the 1937 Act, and HUD regulations. Income reexaminations shall be performed annually, except as provided in the 1937 Act, in HUD regulations, or in the MTW agreements. A PHA must be in compliance with all reexamination requirements in order to be eligible to receive full operating subsidy. A PHA's calculations of rent and utility allowances shall be accurate and timely. (b) A PHA in compliance. A PHA shall submit a certification that states that the PHA is in compliance with the annual income reexamination requirements and its rent and utility allowance calculations have been or will be adjusted in accordance with current HUD requirements and regulations. (c) A PHA not in compliance. Any PHA not in compliance with annual income reexamination requirements at the time of the submission of the calculation of operating subsidy shall furnish to the responsible HUD field office a copy of the procedures it is using to achieve compliance and a statement of the number of families that have undergone reexamination during the 12 months preceding the current funding cycle. If, on the basis of this submission or any other information, HUD determines that the PHA is not substantially in compliance with all of the annual income reexamination requirements, HUD shall withhold payments to which the PHA may be entitled under this part. Payment may be withheld in an amount equal to HUD's estimate of the loss of rental income to the PHA resulting from its failure to comply with the requirements. | |||||
| 24:24:4.1.3.1.23.6.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | F | Subpart F—Transition Policy and Transition Funding | § 990.220 Purpose. | HUD | This policy is aimed at assisting all PHAs in transitioning to the new funding levels as determined by the formula set forth in this rule. PHAs will be subject to a transition funding policy that will either increase or reduce their total operating subsidy for a given year. | |||||
| 24:24:4.1.3.1.23.6.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | F | Subpart F—Transition Policy and Transition Funding | § 990.225 Transition determination. | HUD | [70 FR 54997, Sept. 19, 2005; 70 FR 61367, Oct. 24, 2005] | The determination of the amount and period of the transition funding shall be based on the difference in subsidy levels between the formula set forth in this part and the formula in effect prior to implementation of the formula set forth in this part. The difference in subsidy levels will be calculated using FY 2004 data. When actual data are not available for one of the formula components needed to calculate the formula of this part for FY 2004, HUD will use alternate data as a substitute ( e.g. , unit months available for eligible unit months, etc.) If the difference between these formulas indicates that a PHA shall have its operating subsidy reduced as a result of this formula, the PHA will be subject to a transition policy as indicated in § 990.230. If the difference between these formulas indicates that a PHA will have its operating subsidy increased as a result of this formula, the PHA will be subject to the transition policy as indicated in § 990.235. | ||||
| 24:24:4.1.3.1.23.6.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | F | Subpart F—Transition Policy and Transition Funding | § 990.230 PHAs that will experience a subsidy reduction. | HUD | [70 FR 54997, Sept. 19, 2005; 70 FR 61367, Oct. 24, 2005, as amended at 72 FR 45874, Aug. 15, 2007] | (a) For PHAs that will experience a reduction in their operating subsidy, as determined in § 990.225, such reductions will have a limit of: (1) 5 percent of the difference between the two funding levels in the first year of implementation of the formula contained in this part; (2) 24 percent of the difference between the two funding levels in the second year of implementation of the formula contained in this part; (3) 43 percent of the difference between the two levels in the third year of implementation of the formula contained in this part; (4) 62 percent of the difference between the two levels in the fourth year of implementation of the formula contained in this part; and (5) 81 percent of the difference between the two levels in the fifth year of implementation of the formula contained in this part. (b) The full amount of the reduction in the operating subsidy level shall be realized in the sixth year of implementation of the formula contained in this part. (c) For example, a PHA has a subsidy reduction from $1 million, under the formula in effect prior to implementation of the formula contained in this part, to $900,000, under the formula contained in this part using FY 2004 data. The difference would be calculated at $100,000 ($1 million − $900,000 = $100,000). In the first year, the subsidy reduction would be limited to $5,000 (5 percent of the difference). Thus, the PHA would receive an operating subsidy amount pursuant to this rule plus a transition-funding amount of $95,000 (the $100,000 difference between the two subsidy amounts minus the $5,000 reduction limit). (d) If a PHA can demonstrate a successful conversion to the asset management requirements of subpart H of this part, as determined under paragraph (f) of this section, HUD will discontinue the reduction at the PHA's next subsidy calculation following such demonstration, as reflected in the schedule in paragraph (e) of this section, notwithstanding § 990.290(c). (e) The schedule for successful demonstration of conversion to asset mana… | ||||
| 24:24:4.1.3.1.23.6.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | F | Subpart F—Transition Policy and Transition Funding | § 990.235 PHAs that will experience a subsidy increase. | HUD | [70 FR 54997, Sept. 19, 2005; 70 FR 61367, Oct. 24, 2005] | (a) For PHAs that will experience a gain in their operating subsidy, as determined in § 990.225, such increases will have a limit of 50 percent of the difference between the two funding levels in the first year following implementation of the formula contained in this part. (b) The full amount of the increase in the operating subsidy level shall be realized in the second year following implementation of the formula contained in this part. (c) For example, a PHA's subsidy increased from $900,000 under the formula in effect prior to implementation of the formula contained in this part to $1 million under the formula contained in this part using FY 2004 data. The difference would be calculated at $100,000 ($1 million−$900,000 = $100,000). In the first year, the subsidy increase would be limited to $50,000 (50 percent of the difference). Thus, in this example the PHA will receive the operating subsidy amount of this rule minus a transition-funding amount of $50,000 (the $100,000 difference between the two subsidy amounts minus the $50,000 transition amount). (d) The schedule for a PHA whose subsidy would be increased is reflected in the table below. | ||||
| 24:24:4.1.3.1.23.7.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | G | Subpart G—Appeals | § 990.240 General. | HUD | (a) PHAs will be provided opportunities for appeals. HUD will provide up to a two percent hold-back of the Operating Fund appropriation for FY 2006 and FY 2007. HUD will use the hold-back amount to fund appeals that are filed during each of these fiscal years. Hold-back funds not utilized will be added back to the formula within each of the affected fiscal years. (b) Appeals are voluntary and must cover an entire portfolio, not single projects. However, the Assistant Secretary for Public and Indian Housing (or designee) has the discretion to accept appeals of less than an entire portfolio for PHAs with greater than 5,000 public housing units. | |||||
| 24:24:4.1.3.1.23.7.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | G | Subpart G—Appeals | § 990.245 Types of appeals. | HUD | (a) Streamlined appeal. This appeal would demonstrate that the application of a specific Operating Fund formula component has a blatant and objective flaw. (b) Appeal of formula income for economic hardship. After a PHA's formula income has been frozen, the PHA can appeal to have its formula income adjusted to reflect a severe local economic hardship that is impacting the PHA's ability to maintain rental and other revenue. (c) Appeal for specific local conditions. This appeal would be based on demonstrations that the model's predictions are not reliable because of specific local conditions. To be eligible, the affected PHA must demonstrate a variance of ten percent or greater in its PEL. (d) Appeal for changing market conditions. A PHA may appeal to receive operating subsidy for vacant units due to changing market conditions, after a PHA has taken aggressive marketing and outreach measures to rent these units. For example, a PHA could appeal if it is located in an area experiencing population loss or economic dislocations that faces a lack of demand for housing in the foreseeable future. (e) Appeal to substitute actual project cost data. A PHA may appeal its PEL if it can produce actual project cost data derived from actual asset management, as outlined in subpart H of this part, for a period of at least two years. | |||||
| 24:24:4.1.3.1.23.7.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | G | Subpart G—Appeals | § 990.250 Requirements for certain appeals. | HUD | (a) Appeals under § 990.245 (a) and (c) must be submitted once annually. Appeals under § 990.245 (a) and (c) must be submitted for new projects entering a PHA's inventory within one year of the applicable Date of Full Availability (DOFA). (b) Appeals under § 990.245 (c) and (e) are subject to the following requirements: (1) The PHA is required to acquire an independent cost assessment of its projects; (2) The cost of services for the independent cost assessment is to be paid by the appellant PHA; (3) The assessment is to be reviewed by a professional familiar with property management practices and costs in the region or state in which the appealing PHA is located. This professional is to be procured by HUD. The professional review and recommendation will then be forwarded to the Assistant Secretary for Public and Indian Housing (or designee) for final determination; and (4) If the appeal is granted, the PHA agrees to be bound to the independent cost assessment regardless of new funding levels. | |||||
| 24:24:4.1.3.1.23.8.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.255 Overview. | HUD | (a) PHAs shall manage their properties according to an asset management model, consistent with the management norms in the broader multi-family management industry. PHAs shall also implement project-based management, project-based budgeting, and project-based accounting, which are essential components of asset management. The goals of asset management are to: (1) Improve the operational efficiency and effectiveness of managing public housing assets; (2) Better preserve and protect each asset; (3) Provide appropriate mechanisms for monitoring performance at the property level; and (4) Facilitate future investment and reinvestment in public housing by public and private sector entities. (b) HUD recognizes that appropriate changes in its regulatory and monitoring programs may be needed to support PHAs to undertake the goals identified in paragraph (a) of this section. | |||||
| 24:24:4.1.3.1.23.8.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.260 Applicability. | HUD | (a) PHAs that own and operate 250 or more dwelling rental units under title I of the 1937 Act, including units managed by a third-party entity (for example, a resident management corporation) but excluding section 8 units, are required to operate using an asset management model consistent with this subpart. (b) PHAs that own and operate fewer than 250 dwelling rental units may treat their entire portfolio as a single project. However, if a PHA selects this option, it will not receive the add-on for the asset management fee described in § 990.190(f). | |||||
| 24:24:4.1.3.1.23.8.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.265 Identification of projects. | HUD | For purposes of this subpart, project means a public housing building or set of buildings grouped for the purpose of management. A project may be as identified under the ACC or may be a reasonable grouping of projects or portions of a project under the ACC. HUD shall retain the right to disapprove of a PHA's designation of a project. PHAs may group up to 250 scattered-site dwelling rental units into a single project. | |||||
| 24:24:4.1.3.1.23.8.41.4 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.270 Asset management. | HUD | As owners, PHAs have asset management responsibilities that are above and beyond property management activities. These responsibilities include decision-making on topics such as long-term capital planning and allocation, the setting of ceiling or flat rents, review of financial information and physical stock, property management performance, long-term viability of properties, property repositioning and replacement strategies, risk management responsibilities pertaining to regulatory compliance, and those decisions otherwise consistent with the PHA's ACC responsibilities, as appropriate. | |||||
| 24:24:4.1.3.1.23.8.41.5 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.275 Project-based management (PBM). | HUD | PBM is the provision of property-based management services that is tailored to the unique needs of each property, given the resources available to that property. These property management services include, but are not limited to, marketing, leasing, resident services, routine and preventive maintenance, lease enforcement, protective services, and other tasks associated with the day-to-day operation of rental housing at the project level. Under PBM, these property management services are arranged, coordinated, or overseen by management personnel who have been assigned responsibility for the day-to-day operation of that property and who are charged with direct oversight of operations of that property. Property management services may be arranged or provided centrally; however, in those cases in which property management services are arranged or provided centrally, the arrangement or provision of these services must be done in the best interests of the property, considering such factors as cost and responsiveness. | |||||
| 24:24:4.1.3.1.23.8.41.6 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.280 Project-based budgeting and accounting. | HUD | [70 FR 54997, Sept. 19, 2005, as amended at 80 FR 75943, Dec. 7, 2015] | (a) All PHAs covered by this subpart shall develop and maintain a system of budgeting and accounting for each project in a manner that allows for analysis of the actual revenues and expenses associated with each property. Project-based budgeting and accounting will be applied to all programs and revenue sources that support projects under an ACC ( e.g. , the Operating Fund, the Capital Fund, etc.). (b)(1) Financial information to be budgeted and accounted for at a project level shall include all data needed to complete project-based financial statements in accordance with Accounting Principles Generally Accepted in the United States of America (GAAP), including revenues, expenses, assets, liabilities, and equity data. The PHA shall also maintain all records to support those financial transactions. At the time of conversion to project-based accounting, a PHA shall apportion its assets, liabilities, and equity to its respective projects and HUD-accepted central office cost centers. (2) Provided that the PHA complies with GAAP and other associated laws and regulations pertaining to financial management ( e.g., 2 CFR part 200it shall have the maximum amount of responsibility and flexibility in implementing project-based accounting. (3) Project-specific operating income shall include, but is not limited to, such items as project-specific operating subsidy, dwelling and non-dwelling rental income, excess utilities income, and other PHA or HUD-identified income that is project-specific for management purposes. (4) Project-specific operating expenses shall include, but are not limited to, direct administrative costs, utilities costs, maintenance costs, tenant services, protective services, general expenses, non-routine or capital expenses, and other PHA or HUD-identified costs which are project-specific for management purposes. Project-specific operating costs also shall include a property management fee charged to each project that is used to fund operations of the central office. Amounts that can be charged to eac… | ||||
| 24:24:4.1.3.1.23.8.41.7 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.285 Records and reports. | HUD | (a) Each PHA shall maintain project-based budgets and fiscal year-end financial statements prepared in accordance with GAAP and shall make these budgets and financial statements available for review upon request by interested members of the public. (b) Each PHA shall distribute the project-based budgets and year-end financial statements to the Chairman and to each member of the PHA Board of Commissioners, and to such other state and local public officials as HUD may specify. (c) Some or all of the project-based budgets and financial statements and information shall be required to be submitted to HUD in a manner and time prescribed by HUD. | |||||
| 24:24:4.1.3.1.23.8.41.8 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | H | Subpart H—Asset Management | § 990.290 Compliance with asset management requirements. | HUD | (a) A PHA is considered in compliance with asset management requirements if it can demonstrate substantially, as described in paragraph (b) of this section, that it is managing according to this subpart. (b) Demonstration of compliance with asset management will be based on an independent assessment. (1) The assessment is to be conducted by a professional familiar with property management practices and costs in the region or state in which the PHA is located. This professional is to be procured by HUD. (2) The professional review and recommendation will then be forwarded to the Assistant Secretary for Public and Indian Housing (or designee) for final determination of compliance to asset management. (c) Upon HUD's determination of successful compliance with asset management, PHAs will then be funded based on this information pursuant to § 990.165(i). (d) PHAs must be in compliance with the project-based accounting and budgeting requirements in this subpart by FY 2007. PHAs must be in compliance with the remainder of the components of asset management by FY 2011. | |||||
| 24:24:4.1.3.1.23.9.41.1 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | I | Subpart I—Operating Subsidy for Properties Managed by Resident Management Corporations (RMCs) | § 990.295 Resident Management Corporation operating subsidy. | HUD | (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC), including a direct funded RMC. (b) Operating subsidy. Subject to paragraphs (c) and (d) of this section, the amount of operating subsidy that a PHA or HUD provides a project managed by an RMC shall not be reduced during the three-year period beginning on the date the RMC first assumes management responsibility for the project. (c) Change factors. The operating subsidy for an RMC-managed project shall reflect changes in inflation, utility rates, and consumption, as well as changes in the number of units in the resident managed project. (d) Exclusion of increased income. Any increased income directly generated by activities by the RMC or facilities operated by the RMC shall be excluded from the calculation of the operating subsidy. (e) Exclusion of technical assistance. Any technical assistance the PHA provides to the RMC will not be included for purposes of determining the amount of funds provided to a project under paragraph (b) of this section. (f) The following conditions may not affect the amounts to be provided under this part to a project managed by an RMC: (1) Income reduction. Any reduction in the subsidy or total income of a PHA that occurs as a result of fraud, waste, or mismanagement by the PHA; and (2) Change in total income. Any change in the total income of a PHA that occurs as a result of project-specific characteristics when these characteristics are not shared by the project managed by the RMC. (g) Other project income. In addition to the operating subsidy calculated in accordance with this part and the amount of income derived from the project (from sources such as rents and charges), the management contract between the PHA and the RMC may specify that income be provided to the project from other legally available sources of PHA income. | |||||
| 24:24:4.1.3.1.23.9.41.2 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | I | Subpart I—Operating Subsidy for Properties Managed by Resident Management Corporations (RMCs) | § 990.300 Preparation of operating budget. | HUD | (a) The RMC and the PHA must submit operating budgets and calculations of operating subsidy to HUD for approval in accordance with § 990.200. The budget will reflect all project expenditures and will identify the expenditures related to the responsibilities of the RMC and the expenditures that are related to the functions that the PHA will continue to perform. (b) For each project or part of a project that is operating in accordance with the ACC amendment relating to this subpart and in accordance with a contract vesting maintenance responsibilities in the RMC, the PHA will transfer into a sub-account of the operating reserve of the PHA an operating reserve for the RMC project. When all maintenance responsibilities for a resident-managed project are the responsibility of the RMC, the amount of the reserve made available to a project under this subpart will be the per-unit cost amount available to the PHA operating reserve, excluding all inventories, prepaids, and receivables at the end of the PHA fiscal year preceding implementation, multiplied by the number of units in the project operated. When some, but not all, maintenance responsibilities are vested in the RMC, the management contract between the PHA and RMC may provide for an appropriately reduced portion of the operating reserve to be transferred into the RMC's sub-account. (c) The RMC's use of the operating reserve is subject to all administrative procedures applicable to the conventionally owned public housing program. Any expenditure of funds from the reserve must be for eligible expenditures that are incorporated into an operating budget subject to approval by HUD. (d) Investment of funds held in the reserve will be in accordance with HUD regulations and guidance. | |||||
| 24:24:4.1.3.1.23.9.41.3 | 24 | Housing and Urban Development | IX | 990 | PART 990—THE PUBLIC HOUSING OPERATING FUND PROGRAM | I | Subpart I—Operating Subsidy for Properties Managed by Resident Management Corporations (RMCs) | § 990.305 Retention of excess revenues. | HUD | (a) Any income generated by an RMC that exceeds the income estimated for the income categories specified in the RMC's management contract must be excluded in subsequent years in calculating: (1) The operating subsidy provided to a PHA under this part; and (2) The funds the PHA provides to the RMC. (b) The RMC's management contract must specify the amount of income that is expected to be derived from the project (from sources such as rents and charges) and the amount of income to be provided to the project from the other sources of income of the PHA (such as operating subsidy under this part, interest income, administrative fees, and rents). These income estimates must be calculated consistent with HUD's administrative instructions. Income estimates may provide for adjustment of anticipated project income between the RMC and the PHA, based upon the management and other project-associated responsibilities (if any) that are to be retained by the PHA under the management contract. (c) Any revenues retained by an RMC under this section may be used only for purposes of improving the maintenance and operation of the project, establishing business enterprises that employ residents of public housing, or acquiring additional dwelling units for lower income families. Units acquired by the RMC will not be eligible for payment of operating subsidy. | |||||
| 7:7:8.1.1.1.31.1.478.1 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | A | Subpart A—Definitions | § 990.1 Meaning of terms. | AMS | [86 FR 5680, Jan. 19, 2021, as amended at 88 FR 82236, Nov. 24, 2023] | Words used in this subpart in the singular form shall be deemed to impart the plural, and vice versa, as the case may demand. For the purposes of provisions and regulations of this part, unless the context otherwise requires, the following terms shall be construed, respectively, to mean: Acceptable hemp THC level. When a laboratory tests a sample, it must report the total delta-9 tetrahydrocannabinol content concentration level on a dry weight basis and the measurement of uncertainty. The acceptable hemp THC level for the purpose of compliance with the requirements of State or Tribal hemp plans or the USDA hemp plan is when the application of the measurement of uncertainty to the reported total delta-9 tetrahydrocannabinol content concentration level on a dry weight basis produces a distribution or range that includes 0.3 percent or less. For example, if the reported total delta-9 tetrahydrocannabinol content concentration level on a dry weight basis is 0.35 percent and the measurement of uncertainty is ±0.06 percent, the measured total delta-9 tetrahydrocannabinol content concentration level on a dry weight basis for this sample ranges from 0.29 percent to 0.41 percent. Because 0.3 percent is within the distribution or range, the sample is within the acceptable hemp THC level for the purpose of plan compliance. This definition of “acceptable hemp THC level” affects neither the statutory definition of hemp, 7 U.S.C. 1639o(1), in the 2018 Farm Bill nor the definition of “marihuana,” 21 U.S.C. 802(16), in the CSA. Act. Agricultural Marketing Act of 1946. Agricultural Marketing Service or AMS. The Agricultural Marketing Service of the U.S. Department of Agriculture. Applicant. (1) A State or Indian Tribe that has submitted a State or Tribal hemp production plan to USDA for approval under this part; or (2) A producer in a State or territory of an Indian Tribe that is not subject to a State or Tribal hemp production plan and who has submitted an application to USDA for a license under the USDA hemp producti… | ||||
| 7:7:8.1.1.1.31.2.478.1 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.2 State and Tribal plans; General authority. | AMS | States or Indian Tribes desiring to have primary regulatory authority over the production of hemp in the State or territory of the Indian Tribe shall submit to the Secretary for approval, through the State department of agriculture (in consultation with the Governor and chief law enforcement officer of the State) or the Tribal government, as applicable, a plan under which the State or Indian Tribe monitors and regulates that production. | |||||
| 7:7:8.1.1.1.31.2.478.2 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.3 State and Tribal plans; Plan requirements. | AMS | [86 FR 5680, Jan. 19, 2021, as amended at 88 FR 82236, Nov. 24, 2023] | (a) General requirements. A State or Tribal plan submitted to the Secretary for approval must include the practice and procedures described in this paragraph (a). (1) A State or Tribal plan must include a practice to collect, maintain, and report to the Secretary relevant, real-time information for each producer licensed or authorized to produce hemp under the State or Tribal plan regarding: (i) Contact information as described in § 990.70(a)(1); (ii) A legal description of the land on which the producer will produce hemp in the State or territory of the Indian Tribe including, to the extent practicable, its geospatial location; and (iii) The status and number of the producer's license or authorization in a format prescribed by USDA. (2) A State or Tribal plan must include a procedure for accurate and effective sampling of hemp that includes the requirements in this paragraph (a)(2). (i) Samples from cannabis plants must be collected within 30 days prior to the anticipated harvest, for total delta-9 tetrahydrocannabinol concentration level testing. Samples must be collected by a sampling agent. Producers may not collect samples from their own growing facilities. (ii) Samples shall be obtained from the flowering tops of plants when flowering tops are present, and shall be approximately five to eight inches in length from the “main stem” (that includes the leaves and flowers), “terminal bud” (that occurs at the end of a stem), or “central cola” (cut stem that could develop into a bud) of the flowering top of the plant. (iii) The method used for sampling must be sufficient at a confidence level of 95 percent that no more than one percent of the plants in each lot would exceed the acceptable hemp THC level and ensure that a representative sample is collected that represents a homogeneous composition of the lot. Alternatively, States and Tribes may adopt a performance-based method that meets the requirements in paragraphs (a)(2)(iii)(A) and (B) of this section. (A) The alternative method must be part of the… | ||||
| 7:7:8.1.1.1.31.2.478.3 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.4 USDA approval of State and Tribal plans. | AMS | (a) General authority. No later than 60 calendar days after the receipt of a State or Tribal plan for a State or Tribal territory in which production of hemp is legal, the Secretary shall: (1) Approve the State or Tribal plan only if the State or Tribal plan complies with this part; or (2) Disapprove the State or Tribal plan if the plan does not comply with this part. USDA shall provide the State or Tribe with written notification of the disapproval and the cause for the disapproval. (b) Amended plans. A State or Tribal government, as applicable, must submit to the Secretary an amended plan if: (1) The Secretary disapproves a State or Tribal plan and the State or Indian Tribe wishes to have primary regulatory authority over hemp production within its State or territory of the Indian Tribe; or (2) The State or Indian Tribe makes substantive revisions to its plan or its laws which alter the way the plan meets the requirements of this part. If this occurs, the State or Tribal government must re-submit the revised plan for USDA approval. Such re-submissions should be provided to USDA within 60 days from the date that the State or Tribal laws and regulations are effective. Producers shall continue to comply with the requirements of the existing plan while such modifications are under consideration by USDA. If State or Tribal government laws or regulations in effect under the USDA-approved plan change but the State or Tribal government does not submit a revised plan within 60 days from the effective date of the new law or regulation, the existing plan is revoked. (3) USDA approval of State or Tribal government plan shall remain in effect unless an amended plan must be submitted to USDA because of a substantive revision to a State's or Tribe's plan, a relevant change in State or Tribal laws or regulations, or approval of the plan is revoked by USDA. (4) Upon USDA approval of a Tribal plan, an Indian Tribe may exercise jurisdiction and therefore primary regulatory authority over all production of hemp in its T… | |||||
| 7:7:8.1.1.1.31.2.478.4 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.5 Audit of State or Tribal plan compliance. | AMS | The Secretary may conduct an audit to determine a State or Indian Tribe's compliance with their approved plan. (a) Frequency of audits. Compliance audits may be scheduled, no more frequently than every three years, based on available resources. Audits may include an onsite-visit, a desk-audit, or both. The USDA may adjust the frequency of audits if deemed appropriate based on program performance, compliance issues, or other relevant factors identified and provided to the State or Tribal governments by USDA. (b) Scope of audit review. The audit may include, but is not limited to, a review of the following: (1) The resources and personnel employed to administer and oversee its approved plan; (2) The process for licensing and systematic compliance review of hemp producers; (3) Sampling methods and laboratory testing requirements and components; (4) Disposal and/or remediation of non-compliant hemp plants or hemp plant material practices, to ensure that correct reporting to the USDA has occurred; (5) Results of and methodology used for the annual inspections of producers; and (6) Information collection procedures and information accuracy ( i.e., geospatial location, contact information reported to the USDA, legal description of land). (c) Audit reports. (1) Audit reports will be issued to the State or Tribal government no later than 60 days after the audit concludes. If the audit reveals that the State or Tribal government is not in compliance with its USDA approved plan, USDA will advise the State or Indian Tribe of non-compliances and the corrective measures that must be completed to come into compliance with the Act and regulations in this part. The USDA will require the State or Indian Tribe to develop a corrective action plan, which must be reviewed and approved by the USDA. The corrective action plan must include a reasonable date by which the State or Indian Tribe will correct make corrections. USDA will approve or deny the corrective action plan within 60 days of its receipt. USDA will conduct… | |||||
| 7:7:8.1.1.1.31.2.478.5 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.6 Violations of State and Tribal plans. | AMS | (a) Producer violations. Producer violations of USDA-approved State and Tribal hemp production plans shall be subject to enforcement in accordance with the terms of this section. (b) Negligent violations. Each USDA-approved State or Tribal plan shall contain provisions relating to negligent producer violations as defined under this part. Producers shall not receive more than one negligent violation per growing season. Negligent violations shall include: (1) Failure to provide a legal description of land on which the producer produces hemp; (2) Failure to obtain a license or other required authorization from the State department of agriculture or Tribal government, as applicable; or (3) Production of cannabis with a total delta-9 tetrahydrocannabinol concentration exceeding the acceptable hemp THC level. Hemp producers do not commit a negligent violation under this paragraph (b)(3) if they make reasonable efforts to grow hemp and the cannabis (marijuana) does not have a total delta-9 tetrahydrocannabinol concentration of more than 1.0 percent on a dry weight basis. (c) Corrective action for negligent violations. Each USDA-approved State or Tribal plan shall provide for the correction of negligent violations. Each corrective action plan shall include, at a minimum, the following terms: (1) A reasonable date by which the producer shall correct the negligent violation. (2) A requirement that the producer periodically report to the State department of agriculture or Tribal government, as applicable, on its compliance with the State or Tribal plan and corrective action plan for a period of not less than the next 2 years from the date of the negligent violation. (3) A producer that negligently violates a State or Tribal plan approved under this part shall not as a result of that violation be subject to any criminal enforcement action by the Federal, State, Tribal, or local government. (4) A producer that negligently violates a State or Tribal plan three times during a 5-year period shall be ineligible to … | |||||
| 7:7:8.1.1.1.31.2.478.6 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.7 Establishing records with USDA Farm Service Agency. | AMS | All producers licensed to produce hemp under an USDA-approved State or Tribal plan shall report hemp crop acreage to FSA and shall provide, at minimum, the following information: (a) Street address and, to the extent practicable, geospatial location for each lot or greenhouse where hemp will be produced. If an applicant operates in more than one location, or is producing under multiple licenses, production information shall be provided for each location. (b) Acreage dedicated to the production of hemp, or greenhouse or indoor square footage dedicated to the production of hemp. (c) License or authorization identifier in a format prescribed by USDA. | |||||
| 7:7:8.1.1.1.31.2.478.7 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | B | Subpart B—State and Tribal Hemp Production Plans | § 990.8 Production under Federal law. | AMS | Nothing in this subpart prohibits the production of hemp in a State or the territory of an Indian Tribe for which a State or Tribal plan is not approved under this subpart if produced in accordance with subpart C of this part, and if the production of hemp is not otherwise prohibited by the State or Indian Tribe. | |||||
| 7:7:8.1.1.1.31.3.478.1 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.20 USDA requirements for the production of hemp. | AMS | (a) General hemp production requirements. The production of hemp in a State or territory of an Indian Tribe where there is no USDA approved State or Tribal plan must be conducted in accordance with this subpart, provided that the production of hemp is not prohibited by the State or territory of an Indian Tribe where production will occur. (b) Convicted felon ban. A person with a State or Federal felony conviction relating to a controlled substance is subject to a 10-year ineligibility restriction on participating in and producing hemp under the USDA plan from the date of the conviction. An exception applies to a person who was lawfully growing hemp under section 7606 of the Agricultural Act of 2014 (7 U.S.C. 5940) before December 20, 2018, and whose conviction also occurred before that date. (c) Falsifying material information on application. Any person who materially falsifies any information contained in an application for a license under the USDA plan shall be ineligible to participate in the USDA plan. | |||||
| 7:7:8.1.1.1.31.3.478.10 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.29 Violations. | AMS | Violations of this part shall be subject to enforcement in accordance with the terms of this section. (a) Negligent violations. Hemp producers are not subject to more than one negligent violation per calendar year. A hemp producer shall be subject to enforcement for negligently: (1) Failing to provide an accurate legal description of land where hemp is produced; (2) Producing hemp without a license; and (3) Producing cannabis exceeding the acceptable hemp THC level. Hemp producers do not commit a negligent violation under this paragraph (a) if they make reasonable efforts to grow hemp and the cannabis does not have a total THC concentration of more than 1.0 percent on a dry weight basis. (b) Corrective action for negligent violations. For each negligent violation, USDA will issue a Notice of Violation and require a corrective action plan from the producer. The producer shall comply with the corrective action plan to cure the negligent violation. Corrective action plans will be in place for a minimum of two (2) years from the date of their approval. Corrective action plans will, at a minimum, include: (1) The date by which the producer shall correct each negligent violation; (2) Steps that will be taken to correct each negligent violation; and (3) A description of the procedures that will demonstrate compliance must be submitted to USDA. (c) Negligent violations and criminal enforcement. A producer who negligently violates this part shall not, as a result of that violation, be subject to any criminal enforcement action by any Federal, State, Tribal, or local government. (d) Subsequent negligent violations. If a subsequent negligent violation occurs while a corrective action plan is in place, a new corrective action plan must be submitted with a heightened level of quality control, staff training, and quantifiable action measures. (e) Negligent violations and license revocation. A producer that negligently violates the license 3 times in a 5-year period shall have their license revoked and be i… | |||||
| 7:7:8.1.1.1.31.3.478.11 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.30 USDA producers; License suspension. | AMS | (a) USDA may issue a notice of suspension to a producer if USDA or its representative receives some credible evidence establishing that a producer has: (1) Engaged in conduct violating a provision of this part; or (2) Failed to comply with a written order from the USDA-AMS Administrator related to negligence as defined in this part. (b) Any producer whose license has been suspended shall not handle or remove hemp or cannabis from the location where hemp or cannabis was located at the time when USDA issued its notice of suspension, without prior written authorization from USDA. (c) Any person whose license has been suspended shall not produce hemp during the period of suspension. (d) A producer whose license has been suspended may appeal that decision in accordance with subpart D of this part. (e) A producer whose license has been suspended and not restored on appeal may have their license restored after a waiting period of one year from the date of the suspension. If the license was issued more than three years prior to the date of restoration, the producer shall submit a new application and criminal history report to USDA. (f) A producer whose license has been suspended may be required to provide, and operate under, a corrective action plan to fully restore their license. | |||||
| 7:7:8.1.1.1.31.3.478.12 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.31 USDA licensees; Revocation. | AMS | USDA shall immediately revoke the license of a USDA licensee if such licensee: (a) Pleads guilty to, or is convicted of, any felony related to a controlled substance; or (b) Made any materially false statement with regard to this part to USDA or its representatives with a culpable mental state greater than negligence; or (c) Is found to be growing cannabis exceeding the acceptable hemp THC level with a culpable mental state greater than negligence or negligently violated this part three times in five years. | |||||
| 7:7:8.1.1.1.31.3.478.13 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.32 Recordkeeping requirements. | AMS | (a) USDA licensees shall maintain records of all hemp plants acquired, produced, handled, disposed of, or remediated as will substantiate the required reports. (b) All records and reports shall be maintained for at least three years. (c) All records shall be made available for inspection by USDA inspectors, auditors, or their representatives during reasonable business hours. The following records must be made available: (1) Records regarding acquisition of hemp plants; (2) Records regarding production and handling of hemp plants; (3) Records regarding storage of hemp plants; and (4) Records regarding disposal and remediation of all cannabis plants that do not meet the definition of hemp. (d) USDA inspectors, auditors, or their representatives shall have access to any premises where hemp plants may be held during reasonable business hours. (e) All reports and records required to be submitted to USDA as part of participation in the program in this part which include confidential data or business information, including but not limited to information constituting a trade secret or disclosing a trade position, financial condition, or business operations of the particular licensee or their customers, shall be received by, and at all times kept in the custody and control of, one or more employees of USDA or their representatives. Confidential data or business information may be shared with applicable Federal, State, Tribal, or local law enforcement or their designee in compliance with the Act. | |||||
| 7:7:8.1.1.1.31.3.478.2 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.21 USDA hemp producer license. | AMS | (a) General application requirements —(1) Requirements and license application. Any person producing or intending to produce hemp must have a valid license prior to producing hemp. A valid license means the license is unexpired, unsuspended, and unrevoked. (2) Application dates. Applicants may submit an application for a license at any time. (3) Required information on application. The applicant shall provide the information requested on the application form, including: (i) Contact information. Full name, residential address, telephone number, and email address. If the applicant is a business entity, the full name of the business, the principal business location address, full name and title of the key participants, title, email address (if available), and employer identification number (EIN) of the business; and (ii) Criminal history report. A current criminal history report for an individual, or if the applicant is a business entity, all key participants, dated within 60 days of the application submission date. A license application will not be considered complete without all required criminal history reports. (4) Submission of completed application forms. Completed application forms shall be submitted to USDA. (5) Incomplete application procedures. Applications missing required information shall be returned to the applicant as incomplete. The applicant may resubmit a completed application. (6) License expiration. USDA-issued hemp producer licenses shall be valid until December 31 of the year three years after the year in which license was issued. (b) License renewals. USDA hemp producer licenses must be renewed prior to license expiration. Licenses are not automatically renewed. Applications for renewal shall be subject to the same terms, information collection requirements, and approval criteria as provided in this subpart for initial applications unless there has been an amendment to the regulations in this part or the law since approval of the initial or last application. (c) Lic… | |||||
| 7:7:8.1.1.1.31.3.478.3 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.22 USDA hemp producer license approval. | AMS | (a) A license shall not be issued unless: (1) The application submitted for USDA review and approval is complete and accurate. (2) The criminal history report(s) submitted with the license application confirms that all key participants to be covered by the license have not been convicted of a felony, under State or Federal law, relating to a controlled substance within the past ten (10) years unless the exception in § 990.20(b) applies. (3) The applicant, if the applicant was previously or is currently licensed, submitted all reports required as a participant in the hemp production program by this part. (4) The application contains no materially false statements or misrepresentations and the applicant has not previously submitted an application with any materially false statements or misrepresentations. (5) The applicant's license is not currently suspended, if the applicant is currently licensed. (6) The applicant is not applying for a license as a stand-in for someone whose license has been suspended, revoked, or is otherwise ineligible to participate. (7) The State or territory of the Indian Tribe where the person produces or intends to produce hemp does not have a USDA-approved plan or has not submitted a plan to USDA for approval and is awaiting USDA's decision. (8) The State or territory of the Indian Tribe where the person produces or intends to produce hemp does not prohibit the production of hemp. (b) USDA shall provide written notification to applicants whether the application has been approved or denied. USDA shall provide written notification to applicants in a State or territory of an Indian Tribe that has submitted a plan to USDA and is awaiting USDA approval that their application is being returned. (1) If an application is approved, a license will be issued. (2) Licenses will be valid until December 31 of the year three after the year in which the license was issued. (3) Licenses may not be sold, assigned, transferred, pledged, or otherwise disposed of, alienated or encumbered. (4) If… | |||||
| 7:7:8.1.1.1.31.3.478.4 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.23 Reporting hemp crop acreage with USDA Farm Service Agency. | AMS | All USDA licensees shall report hemp crop acreage to FSA within 30 days of hemp been planted and shall provide, at a minimum, the following information: (a) Street address and, to the extent practicable, geospatial location of the lot, greenhouse, building, or site where hemp will be produced. All locations where hemp is produced must be reported to FSA. (b) Acreage dedicated to the production of hemp, or greenhouse or indoor square footage dedicated to the production of hemp. (c) The hemp license number. | |||||
| 7:7:8.1.1.1.31.3.478.5 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.24 Responsibility of a USDA licensee prior to harvest. | AMS | USDA licensees must: (a) No more than 30 days prior to the anticipated harvest of cannabis plants, have a sampling agent collect samples from the cannabis plant for total delta-9 tetrahydrocannabinol concentration level testing. (b) Have samples collected from the flowering tops of the plant by cutting the top five to eight inches from the “main stem” (that includes the leaves and flowers), “terminal bud” (that occurs at the end of a stem), ”or “central cola” (cut stem that could develop into a bud) of the flowering top of the plant. Sampling guidelines and training requirements for sampling agents are available from USDA. The method used for sampling must be sufficient at a confidence level of 95 percent that no more than one percent (1%) of the plants in the lot would exceed the acceptable hemp THC level. The method used for sampling must ensure that a representative sample is collected that represents a homogeneous composition of the lot. (c) Have an authorized representative of the USDA licensee present at the growing site during a scheduled sample collection, if possible. (d) Ensure that sampling agents are provided with complete and unrestricted access during business hours to all hemp and other cannabis plants, (whether growing or harvested), all hemp production and storage areas, all land, buildings, and other structures used for the cultivation, handling, and storage of all hemp and other cannabis plants, and all locations listed in the producer license. (e) Not harvest the cannabis crop prior to samples being taken. (f) Use post-harvest samples only for remediated biomass. | |||||
| 7:7:8.1.1.1.31.3.478.6 | 7 | Agriculture | IX | 990 | PART 990—DOMESTIC HEMP PRODUCTION PROGRAM | C | Subpart C—USDA Hemp Production Plan | § 990.25 Standards of performance for detecting total delta-9 tetrahydrocannabinol (THC) concentration levels. | AMS | Analytical testing for purposes of determining total THC in cannabis plants shall meet the standards in this section. (a) Laboratory quality assurance must ensure the validity and reliability of test results. (b) Analytical method selection, validation, and verification must ensure that the testing method used is appropriate (fit for purpose), and that the laboratory can successfully perform the testing. (c) The demonstration of testing validity must ensure consistent, accurate analytical performance. (d) Method performance specifications must ensure analytical tests are sufficiently sensitive for the purposes of the detectability requirements of this part. (e) Laboratory must have an effective disposal procedure for non-compliant samples that do not meet the requirements of this part. (f) Measurement of uncertainty (MU) must be estimated and reported with test results. Laboratories shall use appropriate, validated methods and procedures for all testing activities and evaluate measurement of uncertainty. (g) At a minimum, analytical testing of samples for total THC must use post-decarboxylation or other similarly reliable methods approved by the Secretary. The testing methodology must consider the potential conversion of THCA in hemp into THC and the test result must reflect the total available THC derived from the sum of the THC and THCA content. Testing methodologies meeting the requirements of this paragraph (g) include, but are not limited to, gas or liquid chromatography with detection. (1) The total THC shall be determined and reported on a dry weight basis. Additionally, measurement of uncertainty (MU) must be estimated and reported with test results. Laboratories shall use appropriate, validated methods and procedures for all testing activities and evaluate measurement of uncertainty. (2) Any sample test result exceeding the acceptable hemp THC level shall be conclusive evidence that the lot represented by the sample is not in compliance with this part. (3) After December 31, 2022, USDA licensee… |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE cfr_sections (
section_id TEXT PRIMARY KEY,
title_number INTEGER,
title_name TEXT,
chapter TEXT,
subchapter TEXT,
part_number TEXT,
part_name TEXT,
subpart TEXT,
subpart_name TEXT,
section_number TEXT,
section_heading TEXT,
agency TEXT,
authority TEXT,
source_citation TEXT,
amendment_citations TEXT,
full_text TEXT
);
CREATE INDEX idx_cfr_title ON cfr_sections(title_number);
CREATE INDEX idx_cfr_part ON cfr_sections(part_number);
CREATE INDEX idx_cfr_agency ON cfr_sections(agency);