section_id,title_number,title_name,chapter,subchapter,part_number,part_name,subpart,subpart_name,section_number,section_heading,agency,authority,source_citation,amendment_citations,full_text 46:46:1.0.1.4.24.1.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.01,Subpart 32.01—General,,§ 32.01-1 Incorporation by reference.,USCG,,,"[CGD 88-032, 56 FR 35820, July 29, 1991]","(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register in accordance with 5 U.S.C. 552(a). To enforce any edition other than that specified in paragraph (b) of this section, the Coast Guard must publish notice of change in the Federal Register and make the material available to the public. All approved material is on file at the Coast Guard Headquarters. Contact Commandant (CG-ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509. You may also inspect this material at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. All material is available from the sources indicated in paragraph (b) of this section. (b) American Bureau of Shipping (ABS), ABS Plaza, 16855 Northchase Drive, Houston, TX 77060, 281-877-5800, http://www.eagle.org. (1) Rules for Building and Classing Steel Vessels, 1989, incorporation by reference approved for §§ 32.15-15; 32.60-10; 32.65-40. (2) [Reserved] (c) ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959, 877-909-2786, http://www.astm.org. (1) ASTM D4986-98, Standard Test Method for Horizontal Burning Characteristics of Cellular Polymeric Materials, incorporation by reference approved for § 32.57-10. (2) ASTM F1273-91 (Reapproved 2007), Standard Specification for Tank Vent Flame Arresters (approved December 1, 2007), incorporation by reference approved for § 32.20-10. (d) International Maritime Organization (IMO) Publishing, 4 Albert Embankment, London SE1 7SR, United Kingdom, +44 (0)20 7735 7611, http://www.imo.org . (1) International Convention for the Safety of Life at Sea (SOLAS), as amended, Consolidated Edition, 2009, including Erratum, IBR approved for § 32.56-1(b). (2) [Reserved]" 46:46:1.0.1.4.24.10.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-1 Application—TB/ALL.,USCG,,,,"(a) The provisions of this subpart, except § 32.40-60 and § 32.40-65, apply to all tankships of 100 gross tons and over constructed on or after June 15, 1987. (b) Tankships of less than 100 gross tons and manned tank barges must meet the requirements of § 32.40-60. (c) Tankships of 100 gross tons and over constructed prior to June 15, 1987, must meet the requirements of § 32.40-65." 46:46:1.0.1.4.24.10.7.10,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-45 Lighting—T/ALL.,USCG,,,,Each berth must have a light. 46:46:1.0.1.4.24.10.7.11,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-50 Heating and cooling—T/ALL.,USCG,,,,"(a) All manned spaces must be adequately heated and cooled in a manner suitable to the purpose of the space. (b) The heating and cooling system for accommodations must be capable of maintaining a temperature of 21 °C (70 °F) under normal operating conditions without curtailing ventilation. (c) Radiators and other heating apparatus must be so placed and shielded, where necessary, to avoid risk of fire, danger or discomfort to the occupants. Pipes leading to radiators or heating apparatus must be insulated where those pipes create a hazard to persons occupying the space." 46:46:1.0.1.4.24.10.7.12,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-55 Insect screens—T/ALL.,USCG,,,,Provisions shall be made to protect the crew quarters against the admission of insects. 46:46:1.0.1.4.24.10.7.13,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-60 Crew accommodations on tankships of less than 100 gross tons and manned tank barges—TB/ALL.,USCG,,,,"(a) The crew accommodations on all tankships of less than 100 gross tons and all manned tank barges must have sufficient size and equipment, and be adequately constructed to provide for the protection of the crew in manner practicable for the size, facilities, and service of the tank vessel. (b) The crew accommodations must be consistent with the principles underlying the requirements for crew accommodations of tankships of 100 gross tons or more." 46:46:1.0.1.4.24.10.7.14,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,"§ 32.40-65 Crew accommodations on tankships constructed before June 15, 1987—T/ALL.",USCG,,,,"All tankships of 100 gross tons and over constructed before June 15, 1987, may retain previously accepted or approved installations and arrangements so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection." 46:46:1.0.1.4.24.10.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-5 Intent—T/ALL.,USCG,,,,"The accommodations provided for officers and crew on all vessels must be securely constructed, properly lighted, heated, drained, ventilated, equipped, located, arranged and insulated from undue noise, heat and odors." 46:46:1.0.1.4.24.10.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-10 Location of crew spaces—T/ALL.,USCG,,,,"(a) Crew quarters must not be located farther forward in the vessel than a vertical plane located at 5 percent of the vessel's length abaft the forward side of the stem at the designed summer load water line. However, for vessels in other than ocean or coastwise service, this distance need not exceed 8.5 meters (28 feet). For the purposes of this paragraph, the vessel's length must be as defined in § 43.15-1 of subchapter E (Load Lines) of this chapter. Unless approved by the Commandant, no section of the deck head of the crew spaces may be below the deepest load line. (b) There must be no direct communication, except through solid, close fitted doors or hatches between crew spaces and chain lockers, or machinery spaces." 46:46:1.0.1.4.24.10.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-15 Construction—T/ALL.,USCG,,,,"All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable and sanitary condition." 46:46:1.0.1.4.24.10.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-20 Sleeping accommodations—T/ALL.,USCG,,,,"(a) Where practicable, each licensed officer shall be provided with a separate stateroom. (b) Sleeping accommodations for the crew must be divided into rooms, no one of which may berth more than 4 persons. (c) Each room must be of such size that there is at least 2.78 square meters (30 square feet) of deck area and a volume of at least 5.8 cubic meters (210 cubic feet) for each person accommodated. The clear head room must not be less than 190 centimeters (75 inches). In measuring sleeping accommodations any furnishings contained therein for the use of the occupants are not to be deducted from the total volume or from the deck area. (d) Each person shall have a separate berth and not more than one berth may be placed above another. The berth must be composed of materials not likely to corrode. The overall size of a berth must not be less than 68 centimeters (27 inches) wide by 190 centimeters (75 inches) long, except by special permission of the Commandant. Where two tiers of berths are fitted, the bottom of the lower berth must not be less than 30 centimeters (12 inches) above the deck. The berths must not be obstructed by pipes, ventilating ducts, or other installations. (e) A locker must be provided for each person accommodated in a room." 46:46:1.0.1.4.24.10.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-25 Washrooms and toilet rooms—T/ALL.,USCG,,,,"(a) At least 1 toilet, 1 washbasin, and 1 shower or bathtub must be provided for each 8 members or portion thereof in the crew who do not occupy sleeping accommodations to which private or semi-private facilities are attached. (b) The toilet rooms and washrooms must be located convenient to the sleeping quarters of the crew to which they are allotted but must not open directly into such quarters except when they are provided as private or semi-private facilities. (c) All washbasins, showers, and bathtubs must be equipped with adequate plumbing, including hot and cold running water. All toilets must be installed with adequate plumbing for flushing. (d) At least 1 washbasin must be fitted in each toilet room, except where private or semi-private facilities are provided and washbasins are installed in the sleeping rooms. (e) Where more than 1 toilet is located in a space or compartment, each toilet must be separated by partitions." 46:46:1.0.1.4.24.10.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-30 Messrooms—T/ALL.,USCG,,,,"(a) Messrooms must be located as near to the galley as is practicable except where the messroom is equipped with a steam table. (b) Each messroom must seat the number of persons expected to eat in the messroom at one time." 46:46:1.0.1.4.24.10.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-35 Hospital space—T/ALL.,USCG,,,,"(a) Each vessel which in the ordinary course of its trade makes voyages of more than 3 days duration between ports and which carries a crew of 12 or more, must be provided with a hospital space. This space must be situated with due regard to the comfort of the sick so that they may receive proper attention in all weathers. (b) The hospital must be suitably separated from other spaces and must be used for the care of the sick and for no other purpose. (c) The hospital must be fitted with berths in the ratio of 1 berth to every 12 members of the crew or portion thereof who are not berthed in single occupancy rooms, but the number of berths need not exceed 6. (d) The hospital must have a toilet, washbasin, and bathtub or shower conveniently situated. Other necessary suitable equipment such as a clothes locker, a table, and a seat must be provided." 46:46:1.0.1.4.24.10.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.40,Subpart 32.40—Accommodations for Officers and Crew,,§ 32.40-40 Other spaces—T/ALL.,USCG,,,,"Each vessel must have— (a) Sufficient facilities where the crew may wash and dry their own clothes, including at least 1 sink supplied with hot and cold fresh water; (b) Recreation spaces; and (c) A space or spaces of adequate size available on an open deck to which the crew has access when off duty." 46:46:1.0.1.4.24.11.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.45,Subpart 32.45—Electrical Installations,,§ 32.45-1 Installation and details.,USCG,,,"[CGD 74-125A, 47 FR 15230, Apr. 8, 1982]","The installation of all electrical engineering or interior communications systems, together with the details of design, construction, and installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter." 46:46:1.0.1.4.24.12.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-1 Cargo pumps for tank vessels constructed on or after November 10, 1936—TB/ALL.",USCG,,,,"On all tank vessels, the construction or conversion of which is started on or after November 10, 1936, the cargo pumps shall be designed and installed to minimize the danger of sparking. Special care shall be exercised in the design of packing spaces in order to secure ample depth and accessibility of glands. Where cargo pump shafts pierce gastight bulkheads, stuffing boxes with readily accessible gastight glands shall be provided." 46:46:1.0.1.4.24.12.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,§ 32.50-3 Cargo discharge—TB/ALL.,USCG,,,,"(a) Pumps or other acceptable means shall be used to discharge cargo from gravity type cargo tanks vented at gauge pressures of 4 pounds per square inch or less. (b) The use of compressed air as the primary means of discharging cargo from such tanks is prohibited." 46:46:1.0.1.4.24.12.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-5 Cargo pump gauges on tank vessels constructed on or after November 10, 1936—TB/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 73-254, 40 FR 40163, Sept. 2, 1975]","(a) [Reserved] (b) A pressure gage shall be installed for each pump discharge, and it shall be located at a point visible with respect to the pump controls." 46:46:1.0.1.4.24.12.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-10 Cargo pumps on tank vessels with independent cargo tanks which were constructed prior to November 10, 1936—TB/ALL.",USCG,,,,"(a) Cargo pumps on tank vessels, the construction or conversion of which was started prior to November 10, 1936, may be located in a hold space containing independent cargo tanks or on deck. If the pump driving unit is of the type permitted in cargo pumprooms, it also may be located in the hold space. If other types of driving units are used, they shall be located on deck or in an engine compartment. If the pump drive shaft passes through decks or bulkheads into a hold space or pumproom, it shall be provided with suitable stuffing boxes at such points." 46:46:1.0.1.4.24.12.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-15 Cargo piping on tank vessels constructed on or after July 1, 1951—TB/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 80-009, 48 FR 36458, Aug. 11, 1983]","(a) On all tank vessels, the construction or conversion of which is started on or after July 1, 1951, the cargo piping shall be: (1) A fixed cargo piping system shall be installed on a tank vessel carrying Grade A, B, or C cargo. The piping shall be arranged so as to avoid excessive stresses at the joints. For sizes exceeding 2 inches in diameter, flanged, welded, or other approved types of joints shall be employed. Packing material shall be suitable for the cargo carried. Connections at bulkheads shall be made so that the plating does not form part of a flanged joint. Piping may be carried through bunker spaces and deep tanks provided it is run through a pipe tunnel. The tunnel may be omitted where the pipe is extra heavy, all joints are welded, and bends are installed to provide for expansion and contraction. (2) Tank vessels carrying only Grades D and E cargo may use a portable piping system in lieu of a fixed piping system meeting the requirements of paragraph (a)(1) of this section, provided: (i) The hose complies with 33 CFR 154.500 or the portable piping complies with part 56 of this chapter; (ii) The connections comply with 33 CFR 156.130; (iii) A shutoff valve is at or near the point of entry into the tank; (iv) Except for the carriage of animal fats and vegetable oils, the system has a closure which forms a vapor-tight seal on the tank opening through which the cargo is transferred, is bolted or dogged in place, and has the hose and drop line connected to it; and (v) Except for the carriage of animal fats and vegetable oils, the system has a metallic drop line which complies with 46 CFR 153.282. (3) Cargo piping shall not pass through spaces containing machinery where sources of vapor ignition are normally present: Provided, That, in special cases the Commandant may permit the piping to pass through such spaces if Grade E liquids only are involved. (b) Valve operating rods in cargo tanks shall be solid, except that tank barges having plug cocks inside the cargo tanks may have operating rods of extra heavy pipe with the annular space between the lubricant tube and the pipe wall sealed with a nonsoluble material to prevent penetration of the cargo. Valve operating rods shall be of ample size, well guided and supported, and attached to the valve stems in a manner so as to prevent the operating rods from working loose. Where the operating rods pass through a deck, gastight stuffing boxes shall be fitted. The leads of operating rods shall be as direct as possible. Valves shall be of suitable design for the intended service. (c) All cargo loading and discharge hose connections shall be fitted with valves or blind flanges." 46:46:1.0.1.4.24.12.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-20 Cargo piping for tank vessels constructed between November 10, 1936, and July 1, 1951—TB/ALL.",USCG,,,,"(a) On tank vessels, the construction or conversion of which is started on or after November 10, 1936, and prior to July 1, 1951, the piping shall be arranged so as to avoid excessive stresses at the joints. For sizes exceeding 2 inches in diameter, flanged, welded, or other approved types of joints shall be employed. Packing material shall be suitable for the cargo carried. Connections at bulkheads shall be made so that the plating does not form part of a flanged joint. Piping may be carried through bunker spaces and deep tanks provided it is run through a pipe tunnel. The tunnel may be omitted where the pipe is extra heavy, all joints are welded, and bends are installed to provide for expansion and contraction. (b) Cargo piping shall not pass through spaces containing machinery where sources of vapor ignition are normally present: Provided, That in special cases the Commandant may permit the piping to pass through such spaces if Grade E liquids only are involved. (c) Valve operating rods in the cargo tanks shall be solid and of ample size, well guided and supported, and attached to the valve stems in a manner to guard against their working loose. Where such valve rods pass through the deck, gas tight stuffing boxes shall be fitted. The leads of valve rods shall be as direct as possible. All valves and fittings shall be of material, design, and manufacture for the intended service on the cargo system; either rising or nonrising stem valves may be used." 46:46:1.0.1.4.24.12.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,"§ 32.50-25 Cargo pumps and piping on tank vessels constructed prior to November 10, 1936—TB/ALL.",USCG,,,,"On tank vessels, the construction or conversion of which was started prior to November 10, 1936, cargo pumps and piping which do not fully comply with the regulations in this subchapter shall be made as nearly equal to the requirements for tank vessels constructed between November 10, 1936, and July 1, 1951, as is necessary in the interest of safety. Cargo pipe lines may pass through cargo pump engine compartments provided no cargo valves are located therein." 46:46:1.0.1.4.24.12.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,§ 32.50-30 Cargo hose—TB/ALL.,USCG,,,"[CGD 80-009, 48 FR 36458, Aug. 11, 1983]","Cargo hose carried on tank vessels must be suitable for oil service and designed to withstand the pressure of the shutoff head of the cargo pump or pump relief valve setting, less static head, but in no case less than 150 pounds per square inch. For additional requirements concerning cargo hose, see 33 CFR 154.500, 155.800 and 156.170." 46:46:1.0.1.4.24.12.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.50,"Subpart 32.50—Pumps, Piping, and Hose for Cargo Handling",,§ 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL.,USCG,,,,"(a) Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). (b) This regulation applies to all installations of this type on tank vessels, but for such installations now on existing tankships at the date of next biennial inspection or October 1, 1963, whichever occurs later." 46:46:1.0.1.4.24.13.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.52,Subpart 32.52—Bilge Systems,,"§ 32.52-1 Bilge pumps on tank vessels constructed or converted on or after November 19, 1952—TB/ALL.",USCG,,,,"The number and arrangement of bilge pumps on each tank vessel shall conform to the requirements of subchapter F (Marine Engineering) of this chapter, except as hereinafter provided in this subpart." 46:46:1.0.1.4.24.13.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.52,Subpart 32.52—Bilge Systems,,"§ 32.52-5 Bilge piping for pump rooms and adjacent cofferdams on tank vessels constructed or converted on or after November 19, 1952—TB/ALL.",USCG,,,,"(a) Provisions shall be made for removing drainage from the pumproom bilges and adjacent cofferdams. A separate bilge pump, ejector, or bilge suction from a cargo pump or cargo stripping pump may be provided for this purpose. The bilge pump shall not be located in nor shall the piping pass through spaces containing machinery where sources of vapor ignition are normally present. (b) Where a bilge suction is provided from a cargo or stripping pump, a stopcheck valve shall be fitted in the suction branch, and an additional stop valve shall be fitted also if the bilge suction branch can be subjected to a head of oil from the filling line. (c) Means shall be provided for controlling the cargo or pump room bilge pumps and their suctions or discharges in order that a flooded pump room may be pumped out. Suitable portable or manually operated pumps may be accepted as complying with this provision, or alternatively, the pump controls shall be arranged so that they are operable from inside the pump room and either from an accessible position outside the pump room, or from the pump room casing above the freeboard deck." 46:46:1.0.1.4.24.13.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.52,Subpart 32.52—Bilge Systems,,"§ 32.52-10 Bilge pumps and piping on tank vessels constructed or converted prior to November 19, 1952—TB/ALL.",USCG,,,,"(a) On tank vessels, the construction or conversion of which was started prior to November 19, 1952, bilge pumps and piping which do not fully comply with the regulations of this subchapter shall be made as nearly equal to the requirements for tank vessels constructed on or after November 19, 1952, as is necessary in the interest of safety. (b) Bilge suctions from hold spaces containing independent cargo tanks may be connected to cargo pumps or stripping pumps, provided the installation complies with the requirements of § 32.52-5(b)." 46:46:1.0.1.4.24.14.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.53,Subpart 32.53—Inert Gas System,,§ 32.53-1 Application—T/ALL.,USCG,,,"[CGD 77-057a, 44 FR 66501, Nov. 19, 1979, as amended by CGD 97-057, 62 FR 51043, Sept. 30, 1997; CGD 95-028, 62 FR 51198, Sept. 30, 1997]","(a) Except as provided in paragraphs (b) and (c) of this section, this subpart applies to: (1) A U.S. crude oil tanker or product carrier of 100,000 DWT tons (metric) or more or combination carrier of 50,000 DWT tons (metric) or more, that has a keel laying date on or after January 1, 1975. (2) A new (as defined in 46 U.S.C. 3701) crude oil tanker or product carrier, or foreign flag crude oil tanker or product carrier of 20,000 DWT tons or more entering the navigable waters of the U.S. (3) A crude oil tanker that is equipped with a cargo tank cleaning system that uses crude oil washing. (4) An existing product carrier of 20,000 deadweight tons (metric) or more that has tank washing machines with a capacity of more than 60 cubic meters per hour after May 31, 1983. (5) Any other U.S. or foreign flag: (i) Crude oil tanker or product carrier of 70,000 deadweight tons (metric) and over after May 31, 1981; (ii) Crude oil tanker between 20,000 and 70,000 deadweight tons (metric) after May 31, 1983; (iii) Product carrier between 40,000 and 70,000 deadweight tons (metric) after May 31, 1983. (b) This subpart does not apply to vessels designed to carry only: (1) Liquefied gas cargo; or (2) Grade E cargo that is carried at a temperature lower than 5 °C below its flash point. (c) This part does not apply to vessels as stated in 46 U.S.C. 3702." 46:46:1.0.1.4.24.14.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.53,Subpart 32.53—Inert Gas System,,§ 32.53-3 Exemptions.,USCG,,,"[CGD 77-057a, 44 FR 66502, Nov. 19, 1979, as amended by CGD 82-063b, 48 FR 29486, June 27, 1983; CGD 88-070, 53 FR 34534, Sept. 7, 1988; CGD 95-072, 60 FR 50461, Sept. 29, 1995; CGD 96-041, 61 FR 50727, Sept. 27, 1996; CGD 97-057, 62 FR 51043, Sept. 30, 1997; USCG-2009-0702, 74 FR 49227, Sept. 25, 2009; USCG-2013-0671, 78 FR 60147, Sept. 30, 2013]","(a) The Deputy for Operations Policy and Capabilities (CG-DCO-D) grants exemptions for crude oil tankers of less than 40,000 deadweight tons not fitted with high capacity tank washing machines, if the vessel's owner can show that compliance would be unreasonable and impracticable due to the vessel's design characteristics. (b) Requests for exemptions must be submitted in writing to: Commandant (CG-OES), Attn: Office of Operating and Environmental Standards, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7509. (c) Each request must be supported by documentation showing that: (1) The system would be detrimental to the safe operation of the vessel; (2) It is physically impracticable to install the system; or (3) Adequate maintenance of the system would be impossible. (d) The vessel's owner may request a conference. The exemption request file will be available for use in the conference and additional arguments or evidence in any form may be presented. The conference will be recorded. The presiding officer summarizes the material presented at the conference and submits written recommendations to the Deputy for Operations Policy and Capabilities (CG-DCO-D). (e) The Deputy for Operations Policy and Capabilities (CG-DCO-D) reviews the exemption request file and decides whether to grant or deny the exemption. The decision shall include an explanation of the basis on which the exemption is granted or denied, and constitutes final agency action." 46:46:1.0.1.4.24.14.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.53,Subpart 32.53—Inert Gas System,,§ 32.53-5 Operation-T/ALL.,USCG,,,"[USCG-2001-10224, 66 FR 48619, Sept. 21, 2001]","Unless the cargo tanks are gas free, the master of each tankship to which this subpart applies shall ensure that the inert gas system is operated as necessary to maintain an inert atmosphere in the cargo tanks." 46:46:1.0.1.4.24.14.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.53,Subpart 32.53—Inert Gas System,,§ 32.53-10 General—T/ALL.,USCG,,,"[CGD 74-127, 41 FR 3843, Jan. 26, 1976, as amended by CGD 95-028, 62 FR 51198, Sept. 30, 1997]","(a) Each tankship to which this subpart applies must have an inert gas system that meets the requirements of this subpart and is approved in accordance with 46 CFR 50.20. (b) Each inert gas system must be designed, constructed and installed in accordance with the provisions of SOLAS II-2, regulation 62, with the following provisions: (1) Acceptable types of water seals include the wet and semiwet type. Other types of seals may be accepted on a case by case basis if approval is given by the Coast Guard Marine Safety Center. (2) If a vapor collection system required to meet part 39 of this subchapter is connected to the inert gas system, the instruction manual required by SOLAS II-2, regulation 62.21 must include procedures relating to vapor collection operations." 46:46:1.0.1.4.24.14.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.53,Subpart 32.53—Inert Gas System,,§ 32.53-30 Positive pressure—T/ALL.,USCG,,,"[USCG-2003-16630, 73 FR 65160, Oct. 31, 2008]",Each inert gas system must be designed to enable the operator to maintain a gas pressure of 100 millimeters (4 inches) of water on filled cargo tanks and during loading and unloading of cargo tanks. 46:46:1.0.1.4.24.15.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-1 Ventilation of tank vessels constructed on or after July 1, 1951—TB/ALL.",USCG,,,,"(a) On all tanks vessels, the construction or conversion of which is started on or after July 1, 1951, all enclosed parts of the vessel, other than cargo, fuel and water tanks, cofferdams and void spaces, shall be provided with efficient means of ventilation. (b) Compartments containing machinery where sources of vapor ignition are normally present shall be ventilated in such a way as to remove vapors from points near the floor level or the bilges. Effective steam or air actuated gas ejectors, blowers or ventilators fitted with heads for natural ventilation, with at least one duct extending to immediately below the floor plates will be approved for this purpose. Machinery spaces below the freeboard deck, in which fuels with flash point of 110 °F or lower are used, shall be equipped with power ventilation. (See § 32.60-20 for other requirements concerning pumprooms.)" 46:46:1.0.1.4.24.15.7.10,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-50 Ventilation of tankships that have a keel laying date on or after January 1, 1975—T/ALL.",USCG,,,"[CGD 74-127, 41 FR 3844, Jan. 26, 1976]","Each tankship that has a keel laying date on or after January 1, 1975, must have deckhouse and superstructure ventilation inlets and outlets and other openings to the exterior arranged to minimize the admission of flammable gas to enclosed spaces that contain a source of ignition." 46:46:1.0.1.4.24.15.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-5 Ventilation of tank vessels constructed between November 10, 1936, and July 1, 1951—TB/ALL.",USCG,,,,"(a) On tank vessels, the construction or conversion of which was started on or after November 10, 1936, and prior to July 1, 1951, all enclosed parts of the vessel, other than cargo, fuel, and water tanks and cofferdams, shall be provided with efficient means of ventilation. (b) Pumprooms and compartments containing machinery where sources of vapor ignition are normally present shall be ventilated in such a way as to remove vapors from points near the floor level or the bilges. Effective steam or air actuated gas ejectors or blowers or ventilators fitted with heads for natural ventilation, will be approved for this purpose. (See § 32.65-20 for other requirements concerning pumprooms.)" 46:46:1.0.1.4.24.15.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-10 Ventilation of tank vessels contracted prior to November 10, 1936—TB/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 66-33, 31 FR 15268, Dec. 6, 1966]","Ventilation of tank vessels, the construction or conversion of which was started prior to November 10, 1936, shall be equal to the requirements of tank vessels constructed before July 1, 1951, where the changes are, in the opinion of the Officer in Charge, Marine Inspection, necessary in the interest of safety." 46:46:1.0.1.4.24.15.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,§ 32.55-15 Ventilation for hold spaces—TB/ALL.,USCG,,,,Hold spaces containing independent cargo tanks shall be considered to be equivalent to cargo pumprooms and shall be ventilated and safeguarded as such. 46:46:1.0.1.4.24.15.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-20 Venting of cargo tanks of tankships constructed on or after July 1, 1951—T/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 73-96, 42 FR 49024, Sept. 26, 1977; CGD 95-028, 62 FR 51198, Sept. 30, 1997]","(a) Venting required. (1) On all tankships, the construction or conversion of which is started on or after July 1, 1951, each cargo tank shall be equipped with a vent. The diameter of a vent shall be not less than 2 1/2 inches. (2) In any case where a venting system is required for a particular grade of liquid, the venting system permitted for a higher grade of liquid may be used instead. (b) Grade A liquids. (1) Cargo tanks in which Grade A liquids are to be transported must be fitted with a venting system consisting of a branch vent line from each cargo tank connected to a vent header which must extend to a height above the weather deck equal to at least 13.1 feet and must terminate at a comparable distance from any living or working space, ventilator inlet, or source of ignition. When special conditions will prevent the vent line or header outlets being permanently installed at a height above the deck of 13.1 feet an adjustable system must be provided which, when extended vertically, is capable of reaching a height of 13.1 feet. (2) A weather hood may be installed at the vent outlet providing it is of such design as not to direct the flow of vapor below the horizontal. (3) The branch vent lines shall consist of either: (i) Pipe with no valves or other hindrances to a free flow of gas; or, (ii) Piping fitted with a pressure vacuum relief valve, provided means are supplied for relieving all internal pressure on cargo tanks by fitting the valve with a positive means for opening its pressure valve to allow free passage of gases through the branch vent line or by the installation of a by-pass fitted with a manually operated stop valve. (4) The vent header shall be fitted with a flame arrester or pressure vacuum relief valve. If a pressure vacuum relief valve is used in the header, means shall be provided for relieving all internal pressure on cargo tanks by fitting the valve with a positive means for opening its pressure valve to allow free passage of gases through the header or by the installation of a by-pass fitted with a manually operated stop valve. A suitable means of relieving pressure shall be fitted in the header in order to prevent excess pressure being built up in the tanks, in the event of overfilling of the latter. The vent header system shall be provided with suitable connections for flushing and draining. The vent header system shall be of sufficient capacity as to be able to carry off all displaced air and vapors during loading of the cargo tanks without opening of ullage plates, cargo hatches, etc. See § 32.20-20 for liquid level gaging requirements. (c) Grade B or C liquids. Cargo tanks in which Grade B or C liquids are to be transported shall be fitted with either individual pressure-vacuum relief valves which shall extend to a reasonable height above the weather deck or shall be fitted with a venting system consisting of branch vent lines connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a flame arrester or a pressure-vacuum relief valve. The vent header system, if fitted, shall be provided with suitable connections for flushing and draining, and if desired, stop valves may be placed in the individual branch vent lines provided that each stop valve is bypassed by a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E liquids only are to be transported shall be fitted with gooseneck vents and flame screens. (e) Tank vents which meet the requirements of SOLAS will be considered equivalent to the provisions of this section." 46:46:1.0.1.4.24.15.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-25 Venting of cargo tanks of tank barges constructed on or after July 1, 1951—B/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 70-10, 35 FR 3709, Feb. 25, 1970]","(a) Venting required. (1) On all tank barges, subject to the provisions of this subchapter the construction or conversion of which is started on or after July 1, 1951, each cargo tank shall be equipped with a vent. The diameter of a vent shall be not less than 2 1/2 inches. (2) In any case where a venting system is required for a particular grade of liquid, the venting system permitted for a higher grade of liquid may be used instead. (b) Grade A, B, or C liquids. Cargo tanks in which Grade A, B, or C liquids are to be transported shall be fitted with either individual pressure-vacuum relief valves which shall extend to a reasonable height above the weather deck or shall be fitted with a venting system consisting of branch vent lines connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a pressure-vacuum relief valve. The vent header system, if fitted, shall be provided with suitable connections for flushing and draining, and if desired, stop valves may be placed in the individual branch vent lines: Provided, That each such stop valve is bypassed by a pressure-vacuum relief valve. (c) Grade D or E liquids. Cargo tanks in which Grade D or E liquids only are to be transported shall be fitted with gooseneck vents and flame screens." 46:46:1.0.1.4.24.15.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-30 Venting of cargo tanks of tank vessels constructed between November 10, 1936, and July 1, 1951—TB/ALL.",USCG,,,,"(a) Venting required. On all tank vessels, the construction or alteration of which is started on or after November 10, 1936, and prior to July 1, 1951, each cargo tank shall be equipped with a vent. The details of the venting system shall meet the requirements of this section, or alternatively, the requirements of either § 32.55-20 or § 32.55-25, as applicable, shall be met. (b) Grade A liquids. (1) Cargo tanks in which Grade A liquids are to be transported shall be fitted with a venting system consisting of branch vent line from each cargo tank connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a flame arrester or pressure-vacuum relief valve. Each branch vent line may be provided with a manually operated control valve, provided it is bypassed with a pressure-vacuum relief valve or each cargo tank to which such a branch vent line is connected is fitted with an independent pressure-vacuum relief valve. The vent header system shall be provided with suitable connections for flushing and draining. (2) In barges with independent tanks carrying Grade A liquids, separate discharge pipes may be fitted to each pressure-vacuum relief valve, or the pressure-vacuum relief valve may be elevated, so that in either case the discharge from such valve will not be less than 7 feet above the deck where practicable. (c) Grade B or C liquids. Cargo tanks in which Grade B or C liquids are to be transported shall be fitted with individual pressure-vacuum relief valves or shall be fitted with a venting system consisting of branch vent lines connected to a vent header which shall extend to a reasonable height above the weather deck and be fitted with a flame arrester or a pressure-vacuum relief valve. (d) Grade D or E liquids. Cargo tanks in which Grade D or E liquids only are to be transported shall be fitted with gooseneck vents and flame screens unless such tanks are vented by pressure-vacuum relief valves or a venting system of branch vent lines and a vent header." 46:46:1.0.1.4.24.15.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-35 Venting of cargo tanks on tank vessels constructed prior to November 10, 1936—TB/ALL.",USCG,,,,"The venting of cargo tanks of tank vessels, the construction or alteration of which was started prior to November 10, 1936, shall be made to equal the requirements of tank vessels constructed before July 1, 1951, where the changes are, in the opinion of the Officer in Charge, Marine Inspection, necessary in the interests of safety: Provided, That on such vessels carrying Grade A cargo the requirements in § 32.55-30(b) shall be met." 46:46:1.0.1.4.24.15.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.55,Subpart 32.55—Ventilation and Venting,,"§ 32.55-45 Venting of cofferdams and void spaces of tank vessels constructed on or after November 10, 1936—TB/ALL.",USCG,,,,"(a) Except as provided in paragraph (b) of this section, on all tank vessels, the construction or conversion of which was started on or after November 10, 1936, cofferdams and void spaces shall be provided with gooseneck vents fitted with a flame screen or pressure-vacuum relief valves. The diameter of a vent shall be not less than 2 1/2 inches. (b) On unmanned tank barges not fitted with fixed bilge systems in the cofferdams and void spaces, vents for cofferdams and void spaces will not be required." 46:46:1.0.1.4.24.16.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-1 Application—T/ALL.,USCG,,,"[CGD 74-127, 41 FR 3844, Jan. 26, 1976, as amended by CGD 95-028, 62 FR 51198, Sept. 30, 1997; USCG-2012-0196, 81 FR 48248, July 22, 2016]","(a) This subpart applies to all tankships that have a keel laying date on or after January 1, 1975. (b) Vessels meeting the structural fire protection requirements of SOLAS, Chapter II-2, Regulations 5, 6, 8, 9, and 11 (incorporated by reference, see § 32.01-1), may be considered equivalent to the provisions of this subpart." 46:46:1.0.1.4.24.16.7.10,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-35 Doors—T/ALL.,USCG,,,,"(a) Casing doors in category A machinery spaces and all elevator doors must be self-closing and must meet the requirements of 46 CFR 72.05-25(b). (b) If a means of holding a door open is used, it must be a magnetic holdback or equivalent device that is operated from the bridge or other suitable remote control position." 46:46:1.0.1.4.24.16.7.11,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-40 Category A machinery spaces: Insulation—T/ALL.,USCG,,,"[CGD 74-127, 41 FR 3844, Jan. 26, 1976, as amended by CGD 74-127, 41 FR 4826, Feb. 2, 1976]","Structural insulation within category A machinery spaces must have a barrier such as metal foil, sheet metal, cementitious coating, or other vapor barrier so that the surface of that insulation is impervious to oil and oil vapors." 46:46:1.0.1.4.24.16.7.12,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-45 Draft stops—T/ALL.,USCG,,,,"(a) Where ceilings or linings are fitted in accommodation, service, or control spaces, “B” Class bulkheads, except those that form passageways, may stop at the ceiling or lining if draft stops of “B” Class construction are fitted between the ceiling or lining and the deck or shell at intervals of 14 meters (45 feet) or less. (b) Spaces behind the linings of stairways and other trunks must have draft stops at each deck." 46:46:1.0.1.4.24.16.7.13,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-50 Combustible veneers—T/ALL.,USCG,,,,"(a) Except as provided in paragraph (b) of this section combustible veneers on bulkheads, linings, and ceilings within accommodation, service, or control spaces must be 2 millimeters (.079 inches) or less in thickness. (b) Veneers on bulkheads, linings, and ceilings in concealed spaces, corridors, stairway enclosures, or control spaces must be an approved interior finish material or a reasonable number of coats of paint." 46:46:1.0.1.4.24.16.7.14,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-55 Control spaces—T/ALL.,USCG,,,,Bulkheads and decks that separate control spaces from adjacent spaces must be “A” Class construction and insulated against fire. 46 CFR table 72.05-10(e) of the Passenger Vessel Regulations may be used as a guide. 46:46:1.0.1.4.24.16.7.15,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-60 Ventilation ducts—T/ALL.,USCG,,,,"(a) Each duct for ventilation of Category A machinery spaces that passes through accommodation, service, or control spaces must be: (1) Constructed of steel and insulated to “A-60” Class; or (2) Constructed of steel, fitted with an automatic fire damper at each boundary where it enters and leaves the Category A machinery space, and insulated to “A-60” Class for a distance of 5 meters (16.4 feet) beyond each machinery space boundary. (b) Each duct for ventilation of accommodation, service, and control spaces that passes through Category A machinery spaces must be constructed of steel and be fitted with an automatic fire damper at each Category A machinery space boundary." 46:46:1.0.1.4.24.16.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-5 General—T/ALL.,USCG,,,,"(a) Except as provided in paragraphs (c) and (d) of this section, each category A machinery space must be aft of the cargo area and pumprooms. (b) Except as provided in paragraphs (c), (d), and (e) of this section, each accommodation space, service space except isolated storage spaces, and control space and each main cargo control station must be aft of: (1) The cargo area; (2) All cargo pumprooms; and (3) All cofferdams that isolate the cargo area from category A machinery spaces. (c) Except as provided in paragraph (e) of this section, any pumproom may be recessed below accommodation, service, and control spaces and recessed into any category A machinery space if the distance between the deckhead of the recess and the underside of the accommodation, service, or control space is at least equal to the height of the recess. (d) Accommodation, service, control and certain machinery spaces, such as spaces for bow thrusters, windlass, and emergency fire pumps, may be located forward of the cargo area and pumprooms if it is demonstrated to the Commandant that the overall degree of safety of the vessel is improved and that the degree of fire and life safety for these spaces is not less than the degree of fire and life safety for similar spaces located aft. (e) On liquefied gas carriers: (1) Main cargo control stations may be located in the cargo area; (2) Accommodation, service, and control spaces may be located over cofferdams that isolate cargo tanks other than integral tanks from category A machinery spaces; (3) Pumprooms may not be recessed into any space below deck." 46:46:1.0.1.4.24.16.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-10 Navigation positions—T/ALL.,USCG,,,,"(a) No navigation position may be above the cargo area unless it is approved by the Commandant as necessary for the safe operation of the vessel. (b) Each navigation position that is above the cargo area must be separated from the deck by an unenclosed space that extends at least 2 meters (6.6 feet) from the deck to the navigation position. (c) Openings to navigation positions above cargo areas, except air locks, must be at least 2.4 meters (7.9 feet) above the deck." 46:46:1.0.1.4.24.16.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-15 Deck spills—T/ALL.,USCG,,,,A coaming or other barrier at least .3 meters (1 foot) higher than adjacent spill containment barrier must be provided to prevent cargo spills from flowing aft of the housefront. 46:46:1.0.1.4.24.16.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-20 Insulation of exterior boundaries: Superstructures and deckhouses—T/ALL.,USCG,,,,"The following exterior boundaries of superstructures and deckhouses that contain accommodation, service, and control spaces, except wheelhouses, must be insulated to “A-60” Class: (a) The exterior boundaries that face the cargo area. (b) The portion of the exterior bulkheads and decks within 3 meters (10 feet) of these boundaries." 46:46:1.0.1.4.24.16.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,"§ 32.56-21 Openings in exterior boundaries: Accommodation, service, and control spaces—T/ALL.",USCG,,,,"The following exterior boundaries of accommodation, service, and control spaces, except wheelhouses, must have no openings, and portlights must be of a fixed type with easily operable steel covers on the inside: (a) The exterior boundaries that face the cargo area. (b) The portion of the exterior boundaries within 3 meters (10 feet) or the length of the vessel divided by 25, whichever is greater, except that the distance need not exceed 5 meters (16.4 feet), of these boundaries." 46:46:1.0.1.4.24.16.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-22 Openings in and insulation of boundaries: Other spaces—T/ALL.,USCG,,,,"If openings are fitted into the following exterior boundaries of any space other than an accommodation, service, or control space, the interior of the space must be insulated to “A-60” Class and the space must not provide access to any accommodation, service, or control space: (a) The exterior boundaries that face the cargo area. (b) The portion of the exterior boundaries within 3 meters (10 feet) or the length of the vessel divided by 25, whichever is greater, except that the distance need not exceed 5 meters (16.4 feet), of these boundaries." 46:46:1.0.1.4.24.16.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-25 Category A machinery spaces: Windows and port lights—T/ALL.,USCG,,,"[CGD 74-127, 41 FR 3844, Jan. 26, 1976, as amended by CGD 74-125A, 47 FR 15230, Apr. 8, 1982]","(a) Except as provided in paragraph (b) of this section and subpart 111.105, of this chapter, boundaries of category A machinery spaces and boundaries of cargo pumprooms must not be pierced for windows or portlights. (b) Skylights that can be closed from outside the spaces they serve may be fitted in boundaries of category A machinery spaces." 46:46:1.0.1.4.24.16.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.56,"Subpart 32.56—Structural Fire Protection for Tank Ships With a Keel Laying Date On or After January 1, 1975",,§ 32.56-30 Category A machinery spaces: Bulkheads and decks—T/ALL.,USCG,,,,"(a) Bulkheads and decks that separate category A machinery spaces from cargo pumprooms must be “A” Class construction. (b) Bulkheads and decks that separate category A machinery spaces or cargo pumprooms, including the pumproom entrance, from accommodation, service, or control spaces must be “A-60” Class construction." 46:46:1.0.1.4.24.17.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.57,"Subpart 32.57—Structural Fire Protection for Tank Vessels Contracted for On or After January 1, 1963",,§ 32.57-1 Application—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 95-028, 62 FR 51198, Sept. 30, 1997]","(a) The provisions of this subpart shall apply to all tank vessels contracted for on or after January 1, 1963. (b) SOLAS-certificated vessels may be considered equivalent to the provisions of this subpart." 46:46:1.0.1.4.24.17.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.57,"Subpart 32.57—Structural Fire Protection for Tank Vessels Contracted for On or After January 1, 1963",,§ 32.57-5 Definitions—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 67-90, 33 FR 1015, Jan. 26, 1968; CGD 74-127, 41 FR 3845, Jan. 26, 1976; CGD 75-032, 41 FR 17910, Apr. 29, 1976]","(a) Standard fire test. A “standard fire test” is one which develops in the test furnace a series of time temperature relationships as follows: (b) “A” Class divisions. “A” Class divisions such as bulkheads and decks, means divisions that are composed of steel or an equivalent metal, suitably stiffened, and made intact with the main structure of the vessel, including the shell, structural bulkheads, or decks. They are constructed so that, if subjected to the standard fire test, they are capable of preventing the passage of flame and smoke for one hour. In addition, they are insulated with approved structural insulation, bulkhead panels, or deck coverings so that the average temperature on the unexposed side does not rise more than 139 °C (250 °F) above the original temperature, nor does the temperature at any one point, including any joint, rise more than 181 °C (325 °F) above the original temperature, within the time listed below: (c) “B” Class bulkheads. Bulkheads of the “B” Class shall be constructed with approved incombustible materials and made intact from deck to deck and to shell or other boundaries. They shall be so constructed that, if subjected to the standard fire test, they would be capable of preventing the passage of flame for one-half hour. (d) “C” Class divisions. Bulkheads or decks of the “C” Class shall be constructed of approved incombustible materials, but need meet no requirements relative to the passage of flame. (e) Steel. Where the term “steel or other equivalent metal” is used in this subpart, it is intended to require a material which, by itself or due to insulation provided, has structural and integrity qualities equivalent to steel at the end of the applicable fire exposure. (f) Approved material. Where in this subpart approved materials are required, they refer to materials approved under the applicable subparts of subchapter Q (Specifications) of this chapter, as follows: (g) Stairtower. A stairtower is a stairway which penetrates more than a single deck within the same enclosure." 46:46:1.0.1.4.24.17.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.57,"Subpart 32.57—Structural Fire Protection for Tank Vessels Contracted for On or After January 1, 1963",,§ 32.57-10 Construction—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 66-33, 31 FR 15268, Dec. 6, 1966; CGFR 67-90, 33 FR 1015, Jan. 26, 1968; CGD 74-127, 41 FR 3845, Jan. 26, 1976; CGD 95-028, 62 FR 51198, Sept. 30, 1997; USCG-1998-4442, 63 FR 52190, Sept. 30, 1998; USCG-1999-5151, 64 FR 67177, Dec. 1, 1999]","(a) The hull, superstructure, structural bulkheads, decks, and deckhouses shall be constructed of steel. Alternately, the Commandant may permit the use of other suitable material in special cases, having in mind the risk of fire. (b) Bulkheads of galleys, paint and lamp lockers, and emergency generator rooms shall be of “A” Class construction. (c) The boundary bulkheads and decks separating the accommodations and control stations from cargo, and machinery spaces and from galleys, main pantries and storerooms other than small service lockers shall be of “A” Class Construction. (d) The following conditions apply within accommodation, service, and control spaces: (1) Corridor bulkheads in accommodation areas shall be of “A” or “B” Class intact from deck to deck Stateroom doors in such bulkheads may have a louver in the lower half. (2) Stairtowers, elevator, dumbwaiter, and other trunks shall be of “A” Class construction. (3) Bulkheads not already specified to be of “A” or “B” Class construction may be of “A”, “B”, or “C” Class Construction. (4) The integrity of any deck in way of a stairway opening, other than a stairtower, shall be maintained by means of “A” or “B” Class divisions or bulkheads and doors at one level. The integrity of a stairtower shall be maintained by “A” Class doors at every level. The doors shall be of the self-closing type. No means shall be provided for locking such doors, except that crash doors or locking devices capable of being easily forced in an emergency may be employed provided a permanent and conspicuous notice to this effect is attached to both sides of the door. Holdback hooks or other means of permanently holding the door open will not be permitted. However, magnetic holdbacks operated from the bridge or from other suitable remote control positions are acceptable. (5) Interior stairs, including stringers and treads shall be of steel or other suitable material having in mind the risk of fire. This is not intended to preclude the use of other material for nosing, walking surfaces, etc., over the steel. (6) Except for washrooms and toilet spaces, deck coverings within accommodation spaces shall be of an approved type. However, overlays for leveling or finishing purposes which do not meet the requirements for an approved deck covering may be used in thicknesses not exceeding 3/8 of an inch. (7) Except as provided in paragraph (d)(7-a) of this section, ceilings, linings, and insulation, including pipe and duct laggings, must be made of approved incombustible material. (7-a) Combustible insulations and vapor barriers that have a maximum extent of burning of 122 millimeters (5 inches) or less when tested in accordance with ASTM D 4986, “Standard Test Method for Horizontal Burning Characteristics of Cellular Polymeric Materials” (incorporated by reference, see § 32.01-1), may be used within refrigerated compartments. (8) Any sheathing, furring or holding pieces incidental to the securing of any bulkhead, ceiling, lining, or insulation shall be of approved incombustible materials. (9) Bulkheads, linings and ceilings may have a combustible veneer within a room not to exceed 2 millimeters (.079 inch) in thickness. However, combustible veneers, trim, decorations, etc., shall not be used in corridors or hidden spaces. This is not intended to preclude the use of an approved interior finish or a reasonable number of coats of paint. (e) Wood hatch covers may be used between cargo spaces or between stores spaces. Hatch covers in other locations shall be of steel or equivalent metal construction. Tonnage openings shall be closed by means of steel plates or equivalent metal construction. (f) Nitrocellulose or other highly flammable or noxious fume-producing paints or lacquers shall not be used." 46:46:1.0.1.4.24.18.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.59,Subpart 32.59—Minimum Longitudinal Strength and Plating Thickness Requirements for Unclassed Tank Vessels That Carry Certain Oil Cargoes—TB/ALL,,§ 32.59-1 Minimum section modulus and plating thickness requirements—TB/ALL.,USCG,,,"[CGD 91-209, 58 FR 52602, Oct. 8, 1993]","(a) As used in this section, Rule means the current Rules of the American Bureau of Shipping or other recognized classification society, as appropriate for the vessel's present service and regardless of the year the vessel was constructed. (b) The requirements of this section apply to all in-service, unclassed tank vessels certificated to carry a pollution category I oil cargo listed in 46 CFR Table 30.25-1. (c) For all vessels except those limited on their Certificate of Inspection to river routes only, the minimum midship section modulus must be— (1) At least 90 percent of that required by Rule; or (2) Where there is no specific Rule requirement, at least 100 percent of that which is necessary to meet the bending moment developed under a full load condition in still water, using a permissible bending stress of 12.74 kN/cm 2 (1.30 t/cm 2 , 8.25 Ltf/in 2 ). (d) Within the 40-percent midship length, the average flange and web thicknesses of each longitudinal stiffener must be as follows: (1) For deck and bottom stiffeners: at least 85 percent of Rule thickness, unless a buckling analysis demonstrates that lesser thicknesses can be safely tolerated. However, the average thickness must never be less than 80 percent of Rule thickness; and (2) For side stiffeners: at least 75 percent of Rule thickness. (e) Within the 40-percent midship length, the average thickness for longitudinal strength plating must be at least as follows: (1) Weather deck: 75 percent of Rule thickness; (2) Hatch: 70 percent of Rule thickness; (3) Trunk: 75 percent of Rule thickness; (4) Sheer strake: 75 percent of Rule thickness; (5) Outer sideshell: 75 percent of Rule thickness; (6) Inner sideshell: 75 percent of Rule thickness; (7) Outer bottom; 75 percent of Rule thickness; (8) Inner bottom: 70 percent of Rule thickness; (9) Keel: 75 percent of Rule thickness; (10) Bulkheads: 75 percent of Rule thickness." 46:46:1.0.1.4.24.19.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,"§ 32.60-1 Scantlings, material, and workmanship—TB/ALL.",USCG,,,,"(a) All tank vessels, the construction or conversion of which is started on or after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. The hull and deckhouses shall be of steel or iron construction except that the pilothouse and decks over quarters may be constructed of wood. Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. (b) See subpart 32.57 for structural fire protection requirements for tank vessels contracted for on or after January 1, 1963." 46:46:1.0.1.4.24.19.7.10,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-45 Segregation of spaces containing the emergency source of electric power—TB/ALL.,USCG,,,,"(a) The provisions of this section shall apply to all vessels contracted for on or after October 1, 1958. (b) When a compartment containing the emergency source of electric power, or vital components thereof, adjoins a space containing either the ship's service generators or machinery necessary for the operation of the ship's service generators, all common bulkheads and/or decks shall be protected by approved “structural insulation” or other approved material. This protection shall be such as to be capable of preventing an excessive temperature rise in the space containing the emergency source of electric power, or vital components thereof, for a period of at least one hour in the event of fire in the adjoining space. Bulkheads or decks meeting Class A-60 requirements, as defined by § 72.05-10 of subchapter H (Passenger Vessels) of this chapter, will be considered as meeting the requirements of this paragraph." 46:46:1.0.1.4.24.19.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-5 Subdivision of cargo space—TB/ALL.,USCG,,,,The cargo space shall be divided into tight compartments as necessary to avoid excessive stresses and to provide stability. 46:46:1.0.1.4.24.19.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,"§ 32.60-10 Segregation of cargo; Grade A, B, C, or D—TB/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 69-72, 34 FR 17481, Oct. 29, 1969]","(a) General. The galleys, living quarters, navigation spaces, general cargo spaces, boiler rooms, and enclosed spaces where sources of vapor ignition are normally present, shall be segregated from cargo tanks by cofferdams or pump rooms or tanks, either empty or used to carry liquid having a flashpoint of 150 °F. or above, or deck spaces enclosed or open. (b) Cargo tank spaces. Cargo tank spaces shall extend to the main deck, with hatches and vents located on the weather deck. Liquids having a flash point of not less than 150 °F. may be carried in the bulk tanks located beyond the segregating cofferdams and/or pump rooms. (c) Enclosed spaces. (1) Cargo and vent piping passing through enclosed spaces immediately above the bulk cargo tanks shall be continuous except that flanged joints connecting pipe sections will be permitted. (2) No openings to cargo tank shall be permitted other than stuffing boxes through which valve control rods or permanently installed gage tapes extend and openings for use of tank cleaning machines. Openings for tank cleaning machines, when not in use, shall be kept closed by means of gastight bolted plates and when in use shall be made essentially gas and watertight by covers through which hose or pipe to the tank cleaning machines extend. (3) The overhead in way of quarters shall be gastight. (d) Stowage spaces. The spaces described in paragraph (c) of this section may be used for stowage purposes and for general cargo provided that adequate ventilation is furnished. (e) Openings. (1) Except as provided in paragraph (c) of this section, there shall be no manholes or other openings from cargo tanks to any other enclosed spaces. An exception may be made to allow direct access from cargo tanks to innerbottoms through gas tight bolted manholes, provided: (i) The innerbottom tanks are voids or ballast tanks only, and (ii) The innerbottom tanks are protected from sources of ignition similar to the cargo tanks, and any bilge or ballast pumping system serving the innerbottom tanks are treated like cargo pumping systems. (2) Any vents, sounding tubes, and similar piping passing through such tanks shall be run in a suitable trunk; or such piping shall have a wall thickness equal to or greater than the innerbottom plating, but not less than schedule 80, and shall be welded continuously on both sides of the innerbottom plating." 46:46:1.0.1.4.24.19.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-15 Segregation of cargo; Grade E—TB/ALL.,USCG,,,,"(a) General. The galleys, living quarters, navigation spaces, general cargo spaces, boilerrooms, and enclosed spaces containing machinery, where sources of vapor ignition are normally present, shall be segregated from the cargo tanks by tight bulkheads and intervening spaces are not required. (b) Cargo tank spaces. Cargo tank spaces can be terminated at any deck with hatches on the same deck, but the vent lines shall be extended to the weather deck. Butterworth openings and extension rods may be located on the tank top." 46:46:1.0.1.4.24.19.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,"§ 32.60-20 Pumprooms on tank vessels carrying Grade A, B, C, D and/or E liquid cargo—TB/ALL.",USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 70-143, 35 FR 19905, Dec. 30, 1970]","(a) Cargo pumps. In tank vessels carrying Grade A, B, C, or D liquid cargo, cargo pumps shall be isolated from source of vapor ignition by gastight bulkheads. A gastight bulkhead between the pumproom and the pump engine room may be pierced for drive shaft and pump engine control rods provided such openings are fitted with stuffing boxes or other approved gland arrangement. A steam driven pump shall not be considered a source of vapor ignition provided the steam temperature does not exceed 500 °F. (b) Ventilation for pumprooms on tank vessels the construction or conversion of which is started between July 1, 1951, and January 1, 1963. (1) Pumprooms of all tank vessels, the construction or conversion of which is started between July 1, 1951, and January 1, 1963, shall be ventilated in such a way as to remove vapors from points near the floor level or bilges. Pumprooms on tankships handling Grade A, B, or C liquid cargo, with machinery located below the freeboard deck, shall be equipped with power ventilation. Pumprooms equipped with power ventilation shall have the ventilation outlets terminate more than six feet from any opening to the interior part of the vessel which normally contains sources of vapor ignition. (2) For all tank vessels, the construction or conversion of which is started between October 1, 1959, and January 1, 1963, the power ventilation shall not produce a source of vapor ignition in either the pumproom or the ventilation systems associated with the pumproom. The capacity of power ventilation units shall be sufficient to effect a complete change of air in not more than 3 minutes, based upon the volume of the pumproom and associated trunks up to the deck at which access from the weather is provided. (c) Ventilation for pumprooms on tank vessels the construction or conversion of which is started on or after January 1, 1963. (1) For all tank vessels, the construction or conversion of which is started on or after January 1, 1963, the cargo pumprooms shall be fitted in accordance with paragraphs (a) and (d) of this section. Cargo pumprooms on these vessels shall be ventilated in such a way as to remove vapors from points near the floor level or bilges. Cargo pumprooms on tank vessels handling Grade A, B, or C liquid cargo, shall be equipped with power ventilation of the exhaust type having capacity sufficient to effect a complete change of air in not more than 3 minutes based upon the volume of the pumproom and associated trunks up to the deck at which access from the weather is provided. (2) The power ventilation units shall not produce a source of vapor ignition in either the pumproom or the ventilation systems associated with the pumproom. Inlets to exhaust ducts shall be provided and located near the floor level at points where concentrations of vapors may be expected. Ventilation from the weather deck shall be provided. Power supply ventilation may be fitted in lieu of natural ventilation, but when fitted shall be arranged to avoid turbulence in the cargo pumproom. Cargo pumprooms equipped with power ventilation shall have the ventilation outlets terminate more than 6 feet from any opening to the interior part of the vessel which normally contains sources of vapor ignition, and shall be so located as to minimize the possibility of recirculating contaminated air through the pumproom. (3) Cargo pumprooms handling Grade D and/or E liquid cargo only shall be fitted with at least two ducts extended to the weather deck, one of which shall be extended to a point near the floor level. This does not preclude installation of power ventilation, if desired. (4) The ventilation required in this paragraph shall be sufficient to properly ventilate the pumproom with the access openings closed. (d) Access. The access to a cargo pumproom in a tank vessel carrying Grade A, B, C, or D liquid cargo shall be from the open deck." 46:46:1.0.1.4.24.19.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-25 Living quarters—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGD 95-028, 62 FR 51198, Sept. 30, 1997]",For living quarters the partitions and sheathing shall be of an approved fire resistive construction. The specification for incombustible materials is in subchapter Q (Specifications) of this chapter. 46:46:1.0.1.4.24.19.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-30 Tank vessels with independent tanks—TB/ALL.,USCG,,,,"(a) Independent cargo tanks may be located in hold spaces or in other cargo tanks; however, a working space of at least 15 inches shall be maintained around each independent tank, or else provisions shall be made for moving such tanks to furnish such working space, except that less than 15 inches around such tanks may be permitted if in the judgment of the Officer in Charge, Marine Inspection, having jurisdiction, a satisfactory inspection of the cargo tanks and hull structure can be made. (b) When an independent cargo tank is located in an enclosed space other than a cargo tank, such enclosed space shall be considered as equivalent to a pumproom and shall be safeguarded as such as required by this subpart. (c) Cargo tanks independent of the hull structure shall be supported in saddles or on foundations of steel or other suitable material and securely attached in place to preclude the cargo from being damaged or shifting as a result of collision. The arrangement shall be such as to permit longitudinal and circumferential, or athwartship and vertical, expansion of the cargo tanks. Each tank shall be supported so as to prevent the concentration of excessive loads on the supporting portion of the shell." 46:46:1.0.1.4.24.19.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-35 Tank vessels carrying Grade A liquid cargo—TB/ALL.,USCG,,,"[CGFR 70-10, 35 FR 3709, Feb. 25, 1970]","(a) Grade A liquids having a Reid vapor pressure in excess of 25 pounds per square inch shall be transported in cargo tanks which are independent of the hull. (b) Barges carrying Grade A liquids having a Reid vapor pressure in excess of 25 pounds per square inch shall be of a Type III barge hull as defined in § 32.63-5(b)(3)." 46:46:1.0.1.4.24.19.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.60,"Subpart 32.60—Hull Requirements for Tank Vessels Constructed On or After July 1, 1951",,§ 32.60-40 Construction and testing of cargo tanks and bulkheads—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 68-82, 33 FR 18805, Dec. 18, 1968]","(a) All cargo tanks vented at gage pressure of 4 pounds per square inch or less shall be constructed and tested as required by standards established by the American Bureau of Shipping or other recognized classification society. The design of cargo tanks integral with the hull and vented at a gage pressure exceeding 4 pounds per square inch but not exceeding 10 pounds per square inch gage pressure will be given special consideration by the Commandant. (b) Cargo tanks vented at a gage pressure exceeding 10 pounds per square inch are considered to be pressure vessels and shall be of cylindrical or similar design and shall meet the requirements of subchapter F (Marine Engineering) of this chapter." 46:46:1.0.1.4.24.2.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.02,Subpart 32.02—Safety Requirements,,§ 32.02-1 Means of escape—T/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965. Redesignated by CGD 88-032, 56 FR 35820, July 29, 1991]","On all tankships where the plans and arrangements will possibly permit, all passageways leading to living quarters, or places where anyone may be regularly employed, shall be provided with not less than two avenues of escape so located that if one of such avenues is not available another may be. The locality and arrangement of such additional means of escape shall be determined by the inspectors as will in their judgment best carry out the purpose for which this provision was made." 46:46:1.0.1.4.24.2.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.02,Subpart 32.02—Safety Requirements,,§ 32.02-5 Communication between deckhouses—TB/OCLB.,USCG,,,"[CGD 95-027, 61 FR 25997, May 23, 1996]","On all tank vessels where the distance between deckhouses is more than 46 meters (150 feet), a fixed means of facilitating communication between both ends of the vessel, such as a raised fore and aft bridge or side tunnels, must be provided. Previously approved arrangements may be retained so long as they are maintained in satisfactory condition to the satisfaction of the Officer in Charge, Marine Inspection." 46:46:1.0.1.4.24.2.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.02,Subpart 32.02—Safety Requirements,,§ 32.02-10 Rails—TB/ALL.,USCG,,,"[CGFR 69-72, 34 FR 17481, Oct. 29, 1969, as amended by CGD 84-073; 52 FR 18362, May 15, 1987; 52 FR 22751, June 15, 1987. Redesignated by CGD 88-032, 56 FR 35820, July 29, 1991]","(a) All tank vessels, except unmanned tank barges, contracted for on or after July 1, 1969, shall have efficient guard rails or bulwarks on decks and bridges. The height of rails or bulwarks shall be at least 39 1/2 inches from the deck except that where this height would interfere with the normal operation of the vessel, a lesser height may be approved by the Commandant. At exposed peripheries of the freeboard and superstructure decks the rails shall be in at least three courses including the top. The opening below the lowest course shall not be more than 9 inches. The courses shall not be more than 15 inches apart. In the case of ships with rounded gunwales, the guard rail supports shall be placed on the flat of the deck. On other decks and bridges the rails shall be in at least two courses, including the top, approximately evenly spaced. All rails shall consist of solid or tubular sections or chains or wire rope or a combination thereof. (b) Where it can be shown to the satisfaction of the Commandant that a vessel is engaged exclusively on voyages of a sheltered nature, the provisions of paragraph (a) of this section may be relaxed. (c) Tank vessels contracted for prior to July 1, 1969, except unmanned tank barges, assigned a deeper load line under part 42 of subchapter E (Load Lines) of this chapter shall have efficient guard rails or bulwarks as required by paragraph (a) of this section. Otherwise, existing rails and bulwarks previously approved will be considered satisfactory so long as they are maintained in good condition. Minor repairs and alterations may be made to the same standards as the original construction. (d) All tank vessels in ocean and coastwise service, except unmanned tank barges, constructed on or after June 15, 1987, must have suitable storm rails installed in all passageways and at the deckhouse sides on weather decks where persons on board might have normal access. Storm rails must be installed on both sides of passageways which are six feet or more in width. Tank vessels to which this paragraph applies constructed prior to June 15, 1987, may retain previously accepted or approved installations so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection." 46:46:1.0.1.4.24.2.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.02,Subpart 32.02—Safety Requirements,,§ 32.02-15 Guards at dangerous places—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec 30, 1965. Redesignated by CGD 88-032, 56 FR 35820, July 29, 1991]","All exposed and dangerous places such as gears and machinery shall be properly protected with covers, guards or rails in order that the danger of accidents may be minimized. On vessels equipped with radio communication, the lead-ins shall be efficiently incased or insulated to insure against accidental shock. Such lead-ins shall be located so as not to interfere with the launching of lifeboats and life rafts." 46:46:1.0.1.4.24.20.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-1 Application—B/ALL.,USCG,,,"[CGFR 70-10, 35 FR 3709, Feb. 25, 1970]","(a) The requirements of this subpart shall apply to all tank barges, the construction or conversion of which is started on or after July 1, 1964, and carrying those cargoes listed in table 30.25-1 which are defined as: (1) Flammable liquids having a Reid vapor pressure in excess of 25 pounds per square inch, absolute, in independent tanks (part 32). (2) Liquefied flammable gases (part 38 of this subchapter)." 46:46:1.0.1.4.24.20.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-5 Barge hull classifications—B/ALL.,USCG,,,,"(a) Each barge subject to the provision of this subpart shall be assigned a hull type number. The Commandant will designate the barge hull types to be used for carrying cargoes in order to insure that the vessel is designed consistent with the degree and nature of the hazard of the commodity carried. (b) For this purpose the barge hull types shall be as follows: (1) Type I barge hull. Barge hulls classed as Type I are those designed to carry products which require the maximum preventive measures to preclude the uncontrolled release of the cargo to the waterways and/or atmosphere. (2) Type II barge hull. Barge hulls classed as Type II are those designed to carry products which require substantial preventive measures to preclude uncontrolled release to the atmosphere, but whose uncontrolled release to the waterways does not constitute a longlasting public or operating personnel hazard, though local and temporary pollution may occur. (3) Type III barge hull. Barge hulls classed as Type III are those designed to carry products of sufficient hazard to require a moderate degree of control." 46:46:1.0.1.4.24.20.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-8 Alternative arrangements—B/ALL.,USCG,,,,"(a) Alternative arrangements, differing from those specifically required by this subpart, may be considered and approved by the Commandant, if it is demonstrated to his satisfaction that a degree of safety is obtained which is consistent with the intent of this subpart." 46:46:1.0.1.4.24.20.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-10 Rakes and coamings—B/ALL.,USCG,,,,"(a) Each barge hull shall be constructed with a suitable blow form (length, shape, and height of headlog) to protect against diving at the maximum speed at which the barge is designed to be towed. In any integrated tow, only the lead barge need comply with this requirement. In any case, the operator of the towing vessel shall be guided by appropriate speed limitations. (b) All open hopper type barge hulls shall be provided with coamings around the hopper space and, additionally, a 36-inch minimum height plowshare breakwater on the forward rake. Coamings shall have a minimum height of 36 inches forward graduated to a minimum height of 24 inches at midlength and 18 inches thereafter." 46:46:1.0.1.4.24.20.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-20 Hull structure—B/ALL.,USCG,,,,"(a) General. In addition to complying with the requirements of § 32.60-1, as applicable, barge hulls of Types I and II shall comply with the provisions of this section. (b) Types I and II barge hull. Under an assumed grounding condition such that the forward rake bulkhead rests upon a pinnacle at the water surface, the maximum hull bending stress shall not exceed the following limits: (1) Independent tanks may be installed in such a manner that they do not contribute to the strength and stiffness of the barge. In such case, the hull stress shall not exceed either 50 percent of the minimum ultimate tensile strength of the material or 70 percent of the yield strength when specified, whichever is greater. (2) The Commandant may consider a reduction in hull stress when independent tanks are installed in such a manner as to contribute to the strength and stiffness of the barge and this is accounted for in determining the effective section modulus of the barge. In such case, the hull stress shall not exceed the percentage stress values prescribed in paragraph (b)(1) of this section multiplied by the quantity (1.5−SWT/UTS), where SWT is the stress calculated without including the effect of the tanks, and UTS is the minimum ultimate tensile strength of the material. The value SWT, however, shall in no case be more than 75 percent of UTS." 46:46:1.0.1.4.24.20.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.63,"Subpart 32.63—Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes",,§ 32.63-25 Cargo tanks and supports—B/ALL.,USCG,,,,"(a) General. Saddles and hold-down securing straps for independent cargo tanks shall be designed to prevent tank failure due to loads induced in the saddles or straps by barge deflection. (b) Collision protection. (1) All independent cargo tanks installed on Type I and Type II barge hulls shall be protected with suitable collision chocks or collision straps to withstand a longitudinal collision load of one and one-half times the weight of the tank and cargo. All other independent cargo tanks shall be provided with suitable collision chocks or collision straps to withstand a longitudinal collision load equal to the weight of the tank and cargo. (2) All cargo tanks shall be so located as to reduce the likelihood of their being damaged in the event of collision. This protection shall be obtained by locating the cargo tanks not less than 4 feet from the side shell and box-end for Type I hulls and 3 feet for Type II barge hulls, and not less than 25 feet from the headlog at the bow for both types. (c) Cargo tank design —(1) Types I and II barge hulls. (i) In addition to requirements provided for in applicable regulations for a specific commodity, cargoes subject to the provisions of this subpart shall be transported in cargo tanks meeting the requirements of this paragraph. Pressure vessel-type cargo tanks shall have sufficient additional strength so as to limit the maximum combined tank stress, including saddle horn and bending stresses, to 1.5 times the maximum allowable hoop stress in still water, and to the yield strength of the tank material or 70 percent of the minimum ultimate tensile strength of the tank material, if less, in the grounded condition as required by § 32.63-20(b). (ii) Gravity type cargo tanks shall have sufficient additional strength to limit the maximum combined tank stress, including saddle horn and bending stresses, to the yield strength of the tank material or 70 percent of the minimum ultimate tensile strength of the tank material, if less, in the grounded condition as required by § 32.63-20(b). (2) Type III barge hulls. In addition to the requirements of this paragraph, pressure vessel-type cargo tanks shall have sufficient additional strength so as to limit the maximum combined stress, including saddle horn and bending stresses, to 1.5 times the maximum allowable hoop stress." 46:46:1.0.1.4.24.21.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-1 Application—TB/ALL.,USCG,,,,"The requirements in this subpart apply to all tank vessels, the construction or conversion of which was started on or after November 10, 1936, and prior to July 1, 1951." 46:46:1.0.1.4.24.21.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,"§ 32.65-5 Scantlings, material, and workmanship—TB/ALL.",USCG,,,,"The hull and deck houses shall be of steel or iron construction except that the pilothouse and decks over quarters may be constructed of wood. Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society." 46:46:1.0.1.4.24.21.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-10 Subdivision of cargo space—TB/ALL.,USCG,,,,The cargo space shall be divided into tight compartments as necessary to avoid excessive stresses and to provide stability. 46:46:1.0.1.4.24.21.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-15 Cofferdams—TB/ALL.,USCG,,,,"Tank vessels equipped to carry Grade A, B, C, or D liquids shall have their galleys, living quarters, general cargo spaces, boiler rooms, and enclosed spaces containing propelling machinery or other machinery where sources of vapor ignition are normally present, segregated from their cargo tanks by cofferdams or equivalent pumprooms, tanks, or air spaces." 46:46:1.0.1.4.24.21.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-20 Pumprooms—TB/ALL.,USCG,,,,"(a) Tank vessels handling Grade A, B, C, or D liquids shall have their cargo pumps isolated from all sources of vapor ignition by gastight bulkheads. Totally enclosed motors of the “explosion proof” type, motors ventilated on both the intake and exhaust by ducts to atmosphere, and engines driven by steam shall not be considered to be sources of vapor ignition. The gastight bulkhead between the pumproom and the pump-engine compartment may be pierced by fixed lights, drive shaft and pump-engine control rods, provided that the shafts and rods are fitted with stuffing boxes where they pass through the gastight bulkheads. The access to a cargo pumproom handling such liquids shall be from the open deck. (See § 32.60-20.0.)" 46:46:1.0.1.4.24.21.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-25 Living quarters—TB/ALL.,USCG,,,,Partitions and sheathing shall be of approved fire-resistive construction. 46:46:1.0.1.4.24.21.7.7,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-30 Tank vessels with independent tanks—TB/ALL.,USCG,,,,"Independent cargo tanks may be located in hold spaces or in other cargo tanks but in all cases a working space of at least 15 inches shall be provided around such independent tanks, or else provisions shall be made for moving them to secure such space. When independent cargo tanks are located in an enclosed space other than a cargo tank, such enclosed space shall be considered as equivalent to a pumproom, and shall be safeguarded as such, as required in the regulations in this subchapter." 46:46:1.0.1.4.24.21.7.8,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-35 Tank vessels carrying Grade A liquids—TB/ALL.,USCG,,,,Cargo tanks for Grade A liquids having a Reid vapor pressure in excess of 25 pounds shall be independent of the hull. 46:46:1.0.1.4.24.21.7.9,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.65,"Subpart 32.65—Hull Requirements for Tank Vessels Constructed On or After November 10, 1936, and Prior to July 1, 1951",,§ 32.65-40 Construction and testing of cargo tanks and bulkheads—TB/ALL.,USCG,,,"[CGFR 65-50, 30 FR 16671, Dec. 30, 1965, as amended by CGFR 68-82, 33 FR 18805, Dec. 18, 1968]","(a) All cargo tanks to be vented at gage pressures of 4 pounds per square inch or less shall be constructed and tested as required by the requirements of the American Bureau of Shipping or other recognized classification society. (b) All cargo tanks to be vented at gage pressures above 4 pounds per square inch shall be considered as pressure vessels and shall meet the requirements for such vessels as to construction and testing, as set forth in subchapter F (Marine Engineering) of this chapter. (c) Gastight bulkheads shall be subjected to a thorough hose test." 46:46:1.0.1.4.24.22.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-1 Application—TB/ALL.,USCG,,,,"All steel hull tank vessels, the construction or conversion of which was started prior to November 10, 1936, shall conform to the requirements in this subpart." 46:46:1.0.1.4.24.22.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-5 Hull requirements; general—TB/ALL.,USCG,,,"[CGFR 66-33, 31 FR 15268, Dec. 6, 1966]","The scantlings, material, and workmanship, the subdivision of cargo spaces, the arrangement of cofferdams, the testing of tanks and cofferdams, shall be at least equivalent to the requirements of a recognized classification society for the particular service specified in the application for the certificate of inspection and permit for the transportation of liquid flammable cargoes in bulk as of the date when the tank vessel was built or as of the date when the vessel was converted into a tank vessel. In the absence of such classification requirements, the Officer in Charge, Marine Inspection, shall satisfy himself that the vessel's structure as specified in this section is safe for the service to be specified in its certificate of inspection." 46:46:1.0.1.4.24.22.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-10 Cofferdams—TB/ALL.,USCG,,,,"Tank vessels carrying Grade A, B, or C liquids shall be required to conform to the construction requirements in regard to vertical cofferdams in § 32.65-15, except that a dry cargo compartment shall be considered to be equivalent to a cofferdam, and except as provided for in § 32.70-20." 46:46:1.0.1.4.24.22.7.4,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-15 Pumprooms—TB/ALL.,USCG,,,,"Tank vessels handling Grade A, B, C or D liquid cargo shall meet the requirements for tank vessels in § 32.65-20 except that the electrical installation shall comply with the requirements of § 32.45-10(c)." 46:46:1.0.1.4.24.22.7.5,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-20 Pump-engine compartment—TB/ALL.,USCG,,,,"No cofferdam will be required between a cargo tank and a compartment containing pumping engines and their auxiliaries which are used exclusively during pumping operations, provided the pumping engine compartment contains no cargo valves and is well ventilated and provided further that internal combustion exhaust within the compartment are completely water jacketed or insulated and that gasoline engine intakes are fitted with effective flame arresters." 46:46:1.0.1.4.24.22.7.6,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.70,"Subpart 32.70—Hull Requirements for Steel Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.70-25 Cargo tanks—TB/ALL.,USCG,,,,"Cargo tanks shall comply with the conditions specified in §§ 32.65-30 and 32.65-35, and shall pass the tests required in § 32.65-40: Provided, however, That less than 15 inches around such tanks may be accepted if in the judgment of the Officer in Charge, Marine Inspection, making the inspection, a satisfactory inspection of the cargo tanks and hull structure can be made." 46:46:1.0.1.4.24.23.7.1,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.75,"Subpart 32.75—Hull Requirements for Wood Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.75-1 Application—TB/ALL.,USCG,,,,"All wood hull tank vessels, the construction or conversion of which was started prior to November 10, 1936, shall conform to the requirements in this subpart." 46:46:1.0.1.4.24.23.7.2,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.75,"Subpart 32.75—Hull Requirements for Wood Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.75-5 Hull requirements; general—TB/ALL.,USCG,,,,"The scantlings, material, and workmanship, and the fitting and fastening of parts shall be at least equivalent to the requirements of a recognized classification society for the particular service specified in the application for certificate of inspection and permit for the transportation of liquid flammable cargoes in bulk as of the date when the tank vessel was built, or as of the date when the vessel was converted into a tank vessel. In the absence of such classification requirements, the Officer in Charge, Marine Inspection, shall satisfy himself that the vessel's structure as specified in this section is safe for the service to be specified in its certificate of inspection." 46:46:1.0.1.4.24.23.7.3,46,Shipping,I,D,32,"PART 32—SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS",32.75,"Subpart 32.75—Hull Requirements for Wood Hull Tank Vessels Constructed Prior to November 10, 1936",,§ 32.75-10 Cargo tanks—TB/ALL.,USCG,,,,"Cargo tanks shall be independent of the wood hull, shall be made of steel or iron, and shall pass the tests required in § 32.65-40 (a), (b). Where cargo tanks in wood hulls are not arranged to provide working space around them they shall be so constructed as to allow inspection of the hull, tanks, and bilges, and they shall be so installed that they can be moved to allow repairs to the hull structure and to themselves."