section_id,title_number,title_name,chapter,subchapter,part_number,part_name,subpart,subpart_name,section_number,section_heading,agency,authority,source_citation,amendment_citations,full_text 46:46:6.0.1.1.5.1.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-0 Preemptive effect.,USCG,,,"[USCG-2020-0519, 89 FR 76704, Sept. 18, 2024]",The regulations in this part have preemptive effect over State or local regulations in the same field. 46:46:6.0.1.1.5.1.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-1 Incorporation by reference.,USCG,,,"[USCG-2020-0519, 89 FR 76704, Sept. 18, 2024]","Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. All approved incorporation by reference (IBR) material is available for inspection at the Coast Guard and at the National Archives and Records Administration (NARA). Contact Coast Guard at: Commandant (CG-ENG-4), U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE, Washington, DC 20593-7509; email typeapproval@uscg.mil or visit www.dco.uscg.mil/CG-ENG-4/. For information on the availability of this material at NARA, visit www.archives.gov/federal-register/cfr/ibr-locations.html or email fr.inspection@nara.gov. The material may be obtained from the International Organization for Standardization (ISO), ISO Central Secretariat, Chemin de Blandonnet 8. CP 401—1214 Vernier, Geneva, Switzerland; phone 41 22 749 01 11; www.iso.org/contact-iso.html. (a) ISO 15364:2021(E), Ships and Marine Technology—Pressure-vacuum valves for cargo tanks and devices to prevent the passage of flame into cargo tanks, Fourth Edition, February 2021 (“ISO 15364”); IBR approved for § 162.017-3(r). (b) [Reserved]" 46:46:6.0.1.1.5.1.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-2 Type.,USCG,,,"[56 FR 35827, July 29, 1991, as amended by USCG-2020-0519, 89 FR 76704, Sept. 18, 2024]",This specification covers the design and construction of pressure-vacuum relief valves intended for use in venting systems on all tank vessels transporting flammable or combustible liquids. 46:46:6.0.1.1.5.1.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,"§ 162.017-3 Materials, construction, and workmanship.",USCG,,,"[CGFR 50-9, 15 FR 1680, Mar. 25, 1950, as amended by CGFR 68-82, 33 FR 18907, Dec. 18, 1968; CGD 88-032, 56 FR 35827, July 29, 1991; CGD 95-072, 60 FR 50467, Sept. 29, 1995; CGD 96-041, 61 FR 50734, Sept. 27, 1996; USCG-2001-10224, 66 FR 48620, Sept. 21, 2001; USCG-2003-16630, 73 FR 65202, Oct. 31, 2008; USCG-2020-0519, 89 FR 76704, Sept. 18, 2024]","(a) The valves shall be of substantial construction and first class workmanship and shall be free from imperfections which may affect its serviceability. (b) Bodies of pressure-vacuum relief valves must be made of bronze or such corrosion-resistant material as may be approved by the Commanding Officer, USCG Marine Safety Center. (c) Valve discs, spindles, and seats shall be made of bronze or such corrosion-resistant material as may be approved by the Commanding Officer, USCG Marine Safety Center. (d) Where springs are employed to actuate the valve discs, the springs shall be made of corrosion-resistant material. Springs plated with corrosion-resistant material are not acceptable. (e) Flame screens shall be made of corrosion-resistant wire. (f) Nonmetallic materials will not be permitted in the construction of the valves, except bushings used in way of moving parts and gaskets may be made of nonmetallic material resistant to attack by the product carried. Nonmetallic diaphragms will be allowed where diaphragm failure will not result in unrestricted flow of cargo vapors to the atmosphere nor in an increase in the pressure or vacuum at which the valve normally releases. (g) The design and construction of the valves must permit maintenance without removal from the line. (h) Valve discs shall be guided by a ribbed cage or other suitable means to prevent binding, and to insure proper seating. Where valve stems are guided by bushings suitably designed to prevent binding and to insure proper seating, the valves need not be fitted with ribbed cages. (i) The disc shall close tight against the valve seat by metal to metal contact, however, resilient seating seals may be provided if the design is such that the disc closes tight against the seat in case the seals are destroyed or in case they carry away. (j) Pressure-vacuum relief valves for venting cargo tanks shall be of not less than 2 1/2 inches nominal pipe size. (k) Bodies of valves shall be designed to withstand a hydrostatic pressure of at least 125 pounds per square inch without rupturing or showing permanent distortion. (l) The valve discs may be solid or made hollow so that weight material may be added to vary the lifting pressure. If hollow discs are employed, a watertight bolted cover shall be fitted to encase the weight material. The pressure at which the discs open shall not exceed 120 percent of the set pressure. (m) The free area through the valve seats at maximum lift shall not be less than the cross-sectional area of the valve inlet connection. (n) Double flame screens of 20 × 20 corrosion-resistant wire mesh with a 1/2 -inch corrosion-resistant separator, or a single screen of 30 × 30 corrosion-resistant wire mesh, shall be fitted on all openings to atmosphere. The net free area through the flame screens shall not be less than 1 1/2 times the cross-sectional area of the vent inlet from the cargo tanks. (o) Valve bodies may have screwed or flanged pipe connections, or such types of connections as may be approved by the Commanding Officer, USCG Marine Safety Center. If flanged, the thickness and drilling shall comply with USA standards for 150-pound bronze flanged fittings. (p) Where design of valve does not permit complete drainage of condensate to attached cargo tank or vent line, the valve body shall be fitted with a plugged drain opening on the side of the atmospheric outlet of not less than 1/2 inch pipe size. (q) Relief pressure adjusting mechanisms shall be permanently secured by means of lockwires, locknuts, or other acceptable means. (r) Pressure-vacuum relief valves constructed in accordance with ISO 15364 (incorporated by reference; see § 162.017-1) meet the requirements of this subpart and are eligible to receive approval by submitting an application in accordance with § 162.017-6." 46:46:6.0.1.1.5.1.1.5,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-4 Inspections and testing.,USCG,,,"[56 FR 35827, July 29, 1991]",Pressure-vacuum relief valves may be inspected and tested at the plant of the manufacturer. An inspector may conduct such tests and examinations as may be necessary to determine compliance with this specification. 46:46:6.0.1.1.5.1.1.6,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-5 Marking.,USCG,,,"[CGFR 68-82, 33 FR 18908, Dec. 18, 1968, as amended by USCG-2001-10224, 66 FR 48620, Sept. 21, 2001]","(a) Each valve shall be legibly marked with the style, type or other designation of the manufacturer, the size, pressure and vacuum setting and name or registered trademark of the manufacturer and Coast Guard approval number. The minimum wording for showing the approval number shall be “USCG/162.017/* *” or “USCG 162.017-* *”. * * Number to be assigned by the Commanding Officer, USCG Marine Safety Center. (b) [Reserved]" 46:46:6.0.1.1.5.1.1.7,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.017,"Subpart 162.017—General Provisions; Valves, Pressure-Vacuum Relief, for Tank Vessels",,§ 162.017-6 Procedure for approval.,USCG,,,"[56 FR 35827, July 29, 1991, as amended by CGD 95-072, 60 FR 50467, Sept. 29, 1995; CGD 96-041, 61 FR 50734, Sept. 27, 1996; USCG-2001-10224, 66 FR 48620, Sept. 21, 2001; USCG-2004-18884, 69 FR 58350, Sept. 30, 2004; USCG-2007-29018, 72 FR 53967, Sept. 21, 2007; USCG-2009-0702, 74 FR 49238, Sept. 25, 2009; USCG-2013-0671, 78 FR 60160, Sept. 30, 2013; USCG-2016-0498, 82 FR 35092, July 28, 2017; USCG-2022-0323, 88 FR 10031, Feb. 16, 2023; USCG-2020-0519, 89 FR 76704, Sept. 18, 2024]","(a) General. Applications for approval must be submitted to the Commanding Officer, U.S. Coast Guard Marine Safety Center. Applications may be submitted electronically, by mail or in-person. Mail or in-person submissions may be delivered to U.S. Coast Guard Stop 7430, 2703 Martin Luther King Jr. Avenue SE, Washington, DC 20593-7430. Information for submitting applications electronically can be found at https://www.uscg.mil/HQ/MSC. (b) Drawings and specifications. Manufacturers desiring approval of a new design or type of pressure-vacuum relief valve shall submit drawings showing the design of the valve, the sizes for which approval is requested, method of operation, thickness and material specification of component parts, diameter of seat opening and lift of discs, mesh and size of wire of flame screens. (c) Pre-approval tests. Before approval is granted, the manufacturer shall have tests conducted, or submit evidence that such tests have been conducted by a properly supervised and inspected test laboratory acceptable to the Commandant (CG-ENG), relative to determining the lift, relieving pressure and vacuum, and flow capacity of a representative sample of the pressure-vacuum relief valve in each size for which approval is desired. Test reports including flow capacity curves must be submitted to the Commanding Officer, USCG Marine Safety Center." 46:46:6.0.1.1.5.2.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,"§ 162.018-1 Applicable specifications, and referenced material.",USCG,,,"[CGFR 68-82, 33 FR 18908, Dec. 18, 1968]","(a) There are no other specifications applicable to this subpart except as noted in this subpart. (b) The following referenced material from industry standards of the issue in effect on the date safety relief valves are manufactured shall form a part of the regulations of this subpart (see §§ 2.-75-17 through 2.75-19 of Subchapter A (Procedures Applicable to the Public) and Subpart 50.15 of Subchapter F (Marine Engineering) of this chapter): (1) ASME (American Society of Mechanical Engineers) Code (see § 50.-15-5 of subchapter F (Marine Engineering) of this chapter): The following paragraph from section VIII of the ASME Code: (i) UG-131, flow rating of valves, see § 162.018-7(a). (i) UG-131, flow rating of valves, see § 162.018-7(a). (2) CGA (Compressed Gas Association) standard: The following standard of the Compressed Gas Association (see § 50.15-20(a) of Subchapter F (Marine Engineering) of this chapter): (i) S-1.2.5.2, Flow test data for safety and relief valves for use on pressure vessels, see § 162.018-7(a). (i) S-1.2.5.2, Flow test data for safety and relief valves for use on pressure vessels, see § 162.018-7(a). (c) A copy of this specification and the referenced material listed in this section, if used, shall be kept on file by the manufacturer, together with the approved plans, specifications, and certificate of approval. It is the manufacturer's responsibility to have the latest issue, including addenda and changes, of the referenced material on hand when manufacturing equipment under this subpart. (1) The ASME Code may be obtained from the American Society of Mechanical Engineers, United Engineering Center, 345 East 47th Street, New York, N.Y. 10017. (2) The CGA standard may be obtained from the Compressed Gas Association, 500 Fifth Avenue, New York, N.Y. 10036." 46:46:6.0.1.1.5.2.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-2 Scope.,USCG,,,"[CGFR 52-43, 17 FR 9540, Oct. 18, 1952]","(a) This specification covers requirements for the design, construction and testing of safety relief valves intended for use on unfired pressure vessels containing liquefied compressed gases installed on merchant vessels subject to inspection by the Coast Guard. (b) [Reserved]" 46:46:6.0.1.1.5.2.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-3 Materials.,USCG,,,"[CGFR 52-43, 17 FR 9540, Oct. 18, 1952, as amended by CGFR 68-82, 33 FR 18908, Dec. 18, 1968; CGD 72-206R, 38 FR 17230, June 29, 1973]","(a) The materials used in the manufacture of safety relief valves shall conform to the applicable requirements of subchapter F (Marine Engineering) of this chapter, except as otherwise specified in this subpart, and shall be resistant to the corrosive or other action of the liquefied compressed gas in the liquid or gas phase. (b) All pressure containing external parts of valves must be constructed of materials melting above 1700 °F. for liquefied flammable gas service. Consideration of lower melting materials for internal pressure-containing parts will be given if their use provides significant improvement to the general operation of the valve. Flange gaskets shall be metal or spiral wound asbestos. (c) Nonferrous materials shall not be used in the construction of valves for anhydrous ammonia or other service where susceptible to attack by the lading. (d) The seats and disks shall be of suitable corrosion resistant material. Seats and disks of cast iron or malleable iron shall not be used. Springs shall be of best quality spring steel consistent with the design of the valve and the service requirement." 46:46:6.0.1.1.5.2.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-4 Construction and workmanship.,USCG,,,"[CGFR 52-43, 17 FR 9540, Oct. 18, 1952]","(a) Safety relief valves shall be of either the internal or external spring-loaded type, suitable for the intended service. (b) Safety relief valve body, base, bonnet and internals shall be designed for a pressure of not less than the set-pressure of the valve. (c) All safety relief valves shall be so constructed that the failure of any part cannot obstruct the free and full discharge of vapors from the valve. (d) The nominal size of a safety relief valve shall be the inside diameter of the inlet opening to the individual valve disk. No safety relief valve shall be smaller than 3/4 inch nor larger than 6 inches. Safety relief valves shall have flanged or welded end inlet connections and either flanged or screwed outlet connections, except outlets exceeding 4 inches in diameter shall be flanged. (e) Safety relief valves shall be of the angle or straight-through type, fitted with side or top outlet discharge connections. (f)(1) Springs shall not show a permanent set exceeding 1 percent of their free length 10 minutes after being released from a cold compression test closing the spring solid. (2) Springs may not be re-set for any pressure more than 10 percent above or 10 percent below that for which the valve is marked. (3) If the operating conditions of a valve are changed so as to require a new spring under paragraph (f)(2) of this section for a different pressure, the valve shall be adjusted by the manufacturer or his authorized representative. (g) The design and construction of safety relief valves shall permit easy access for inspection and repair. (h) Safety relief valves shall be tapped for not less than 1/4 inch pipe size drain at the lowest practicable point where liquid can collect." 46:46:6.0.1.1.5.2.1.5,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-5 Blow-down adjustment and popping tolerance.,USCG,,,"[CGFR 52-43, 17 FR 9541, Oct. 18, 1952, as amended by USCG-2014-0688, 79 FR 58286, Sept. 29, 2014]","(a) Safety relief valves shall be so constructed that no shocks detrimental to the valve or pressure vessel are produced when lifting or closing. Safety relief valves shall be designed to open sharply and reach full lift and capacity at the maximum accumulation. Valve closure after popping shall be clean and sharp. Safety relief valves shall operate satisfactorily without wiredrawing and chattering at any stage of operation. (b) Safety relief valves having adjustable blow-down construction shall be adjusted to close after blowing down not more than 5 percent of the set pressure. Valves shall be adjusted to pop within a tolerance of plus or minus 3 percent of the set pressure, except that for pressures of 70 p.s.i. and below, the tolerance in popping pressure shall not vary more than plus or minus 2 p.s.i." 46:46:6.0.1.1.5.2.1.6,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-6 Marking.,USCG,,,"[CGFR 68-82, 33 FR 18908, Dec. 18, 1968, as amended by USCG-2001-10224, 66 FR 48620, Sept. 21, 2001]","(a) Each safety relief valve shall be plainly marked by the manufacturer with the required data in such a way that the marking will not be obliterated in service. The marking may be stamped on the valve or stamped or cast on a plate securely fastened to the valve. The marking shall include the following data: (1) The name or identifying trademark of the manufacturer. (2) Manufacturer's design or type number. (3) Size ____ inches. (The pipe size of the valve inlet). (4) Set pressure ____ p.s.i. (5) Rated capacity ____ cubic feet per minute of the gas or vapor (at 60 °F. and 14.7 p.s.i.a.). (6) Coast Guard approval number. The minimum wording for showing approval shall be “USCG 162.018/* *” or “USCG 162.018-* * ”. * * Number to be assigned by the Commanding Officer, USCG Marine Safety Center. (b) [Reserved]" 46:46:6.0.1.1.5.2.1.7,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-7 Flow rating tests.,USCG,,,"[CGFR 68-82, 33 FR 18908, Dec. 18, 1968, as amended by USCG-2001-10224, 66 FR 48620, Sept. 21, 2001]","(a) Flow rating of valves shall be conducted in accordance with UG-131 of section VIII of the ASME Code, S-1.2.5.2 of the Compressed Gas Association Standards, or other procedure approved by the Commanding Officer, USCG Marine Safety Center. (b) [Reserved]" 46:46:6.0.1.1.5.2.1.8,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.018,"Subpart 162.018—Safety Relief Valves, Liquefied Compressed Gas",,§ 162.018-8 Procedure for approval.,USCG,,,"[CGFR 52-43, 17 FR 9540, Oct. 18, 1952, as amended by CGFR 68-82, 33 FR 18908, Dec. 18, 1968; CGD 88-070, 53 FR 34536, Sept. 7, 1982; CGD 96-041, 61 FR 50734, Sept. 27, 1996; USCG-2001-10224, 66 FR 48620, Sept. 21, 2001; USCG-2007-29018, 72 FR 53967, Sept. 21, 2007; USCG-2009-0702, 74 FR 49238, Sept. 25, 2009; USCG-2013-0671, 78 FR 60160, Sept. 30, 2013; USCG-2016-0498, 82 FR 35092, July 28, 2017; USCG-2022-0323, 88 FR 10032, Feb. 16, 2023]","(a) General. Safety relief valves for use on pressure vessels containing liquefied compressed gases must be approved by the Commanding Officer, U.S. Coast Guard Marine Safety Center. Applications for approval may be delivered by visitors to the Commanding Officer, Marine Safety Center, U.S. Coast Guard, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593, or transmitted by mail to: Commanding Officer (MSC), Attn: Marine Safety Center, U.S. Coast Guard Stop 7430, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7430, in a written or electronic format. Information for electronic submittals can be found at https://www.uscg.mil/HQ/MSC . (b) Plan submittal. Manufacturers desiring to secure approval of a new design or type of safety relief valve shall submit in quadruplicate detail drawings showing the valve construction, and material specifications of the component parts. In the event the design is changed, amended drawings shall be submitted to the Commanding Officer, USCG Marine Safety Center, for re-approval. (c) Pre-approval tests. (1) Prior to approval of safety relief valves by the Commanding Officer, USCG Marine Safety Center, manufacturers shall have capacity certification tests conducted, in accordance with § 162.018-7 or submit satisfactory evidence that such tests have been conducted and approved by The National Board of Boiler and Pressure Vessel Inspectors or by a properly supervised and inspected test laboratory acceptable to the Commanding Officer, USCG Marine Safety Center. (2) Reports of conducted tests on designs of safety relief valves different from those previously approved shall be submitted by the manufacturer when requesting approval for different designs." 46:46:6.0.1.1.5.3.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.027,Subpart 162.027—Combination Firehose Nozzles,,§ 162.027-1 Scope.,USCG,,,"[USCG-2012-0196, 81 FR 48277, July 22, 2016]",This subpart prescribes requirements for approval of combination firehose nozzles. 46:46:6.0.1.1.5.3.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.027,Subpart 162.027—Combination Firehose Nozzles,,§ 162.027-2 Incorporation by reference.,USCG,,,"[USCG-2012-0196, 81 FR 48277, July 22, 2016]","(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG-ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593-7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. (b) ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428, 877-909-2786, http://www.astm.org. (1) ASTM F1546/F1546 M-96 (Reapproved 2012), Standard Specification for Fire Hose Nozzles, approved May 1, 2012, (“ASTM F 1546”), IBR approved for §§ 162.027-3(a) through (c), and 162.027-4(a) and (d). (2) [Reserved] (c) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617-770-3000, http://www.nfpa.org . (1) NFPA 1964 Standard for Spray Nozzles, 2008 Edition, effective December 31, 2007, IBR approved for §§ 162.027-3(a) through (c), and 162.027-4(a) and (d). (2) [Reserved]" 46:46:6.0.1.1.5.3.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.027,Subpart 162.027—Combination Firehose Nozzles,,"§ 162.027-3 Design, construction, testing, and marking requirements.",USCG,,,"[USCG-2012-0196, 81 FR 48277, July 22, 2016]","(a) Each combination solid stream and water spray firehose nozzle required to be approved under the provisions of this subpart must be of brass or bronze, except for hardware and other incidental parts, which may be of rubber, plastic, or stainless steel, and designed, constructed, tested, and marked in accordance with the requirements of ASTM F 1546 or NFPA 1964 (incorporated by reference, see § 162.027-2). (b) All inspections and tests required by ASTM F 1546 or NFPA 1964 must be performed by an independent laboratory accepted by the Coast Guard under subpart 159.010 of this chapter. A list of independent laboratories accepted by the Coast Guard as meeting subpart 159.010 of this chapter may be obtained by contacting the Commandant (CG-ENG-4). (c) The independent laboratory must prepare a report on the results of the testing and must furnish the manufacturer with a copy of the test report upon completion of the testing required by ASTM F 1546 or NFPA 1964." 46:46:6.0.1.1.5.3.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.027,Subpart 162.027—Combination Firehose Nozzles,,§ 162.027-4 Approval procedures.,USCG,,,"[CGD 95-027, 61 FR 26009, May 23, 1996, as amended by USCG-1999-5151, 64 FR 67185, Dec. 1, 1999. Redesignated and amended by USCG-2012-0196, 81 FR 48277, July 22, 2016]","(a) Firehose nozzles designed, constructed, tested, and marked in accordance with ASTM F 1546 or NFPA 1964 (incorporated by reference, see § 162.027-2) are considered to be approved under the provisions of this chapter. (b) Firehose nozzles designed, constructed, tested and marked in accordance with the provisions of this subpart in effect prior to June 24, 1996, are considered to be approved under the provisions of this chapter. (c) A follow-up program must be established and maintained to ensure that no unauthorized changes have been made to the design or manufacture of type approved firehose nozzles. Acceptable follow-up programs include factory inspection programs administered by the accepted independent laboratory that performed the initial inspections and tests relied on by the type approval holder, or special configuration control programs implemented through a quality control flow chart and core procedures administered by the manufacturer and certified by an international standards agency such as the International Organization for Standardization (ISO). (d) Applicants seeking type approval of firehose nozzles must submit: (1) A cover letter requesting type approval of the equipment; (2) A test report from the accepted independent laboratory showing compliance of the firehose nozzle with ASTM F 1546 or NFPA 1964; (3) A copy of the contract for a follow-up program with the accepted independent laboratory or evidence of an ISO 9001 certified special configuration control program or similar program implemented through a quality control flow chart and core procedure; and (4) Documentation of the firehose nozzle, including an exterior drawing, assembly drawing, components list, and bill of material. (e) All documentation must be either mailed to Commandant (CG-ENG-4), United States Coast Guard, 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593-7509 or electronically submitted to typeapproval@uscg.mil . (f) Upon evaluation of the submittal package and approval by the Commandant, a Coast Guard Certificate of Approval will be issued valid for 5 years so long as the follow-up program for the firehose nozzle is maintained. (g) Upon application, a Certificate of Approval for a firehose nozzle may be renewed for successive 5-year periods without further testing so long as no changes have been made to the products, the follow-up program has been maintained, and no substitutions of or changes to the standards listed in § 162.027-2 have been made." 46:46:6.0.1.1.5.4.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-1 Incorporation by reference.,USCG,,,"[USCG-2012-0196, 81 FR 48277, July 22, 2016]","(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG-ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593-7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . (b) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617-770-3000, http://www.nfpa.org . (1) NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009, IBR approved for § 162.028-2(a). (2) [Reserved] (c) UL (formerly Underwriters Laboratories), 12 Laboratory Drive, P.O. Box 13995, Research Triangle Park, NC 27709, 919-549-1400, http://www.ul.com . (1) UL 8, Standard for Safety for Water Based Agent Fire Extinguishers, Sixth Edition, dated February 28, 2005, as amended through July 27, 2010, IBR approved for § 162.028-3(a). (2) UL 154, Standard for Safety for Carbon-Dioxide Fire Extinguishers, Ninth Edition, dated February 28, 2005, as amended through November 8, 2010, IBR approved for § 162.028-3(a). (3) UL 299, Standard for Safety for Dry Chemical Fire Extinguishers, Eleventh Edition, dated April 13, 2012, IBR approved for § 162.028-3(a). (4) UL 626, Standard for Safety for Water Fire Extinguishers, Eighth Edition, dated February 28, 2005, as amended through November 8, 2010, IBR approved for § 162.028-3(a). (5) UL 711, Standard for Safety for Rating and Fire Testing of Fire Extinguishers, Seventh Edition, dated December 17, 2004, as amended through April 28, 2009, IBR approved for § 162.028-2(a) and 162.028-3(a). (6) UL 2129, Standard for Safety for Halocarbon Clean Agent Fire Extinguishers, Second Edition, dated February 28, 2005, as amended through March 30, 2012, IBR approved for § 162.028-3(a)." 46:46:6.0.1.1.5.4.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-2 Classification.,USCG,,,"[CGFR 60-36, 25 FR 10640, Nov. 5, 1960, as amended by USCG-2012-0196, 81 FR 48278, July 22, 2016]","(a) Portable and semi-portable extinguishers must be marked with a combined number and letter designation. The letter designates the general class of fire for which the extinguisher is suitable as identified in NFPA 10 (incorporated by reference, see § 162.028-1). The number indicates the relative extinguishing potential of the device as rated by UL 711 (incorporated by reference, see § 162.028-1). (b) [Reserved]" 46:46:6.0.1.1.5.4.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-3 Requirements.,USCG,,,"[USCG-2012-0196, 81 FR 48278, July 22, 2016]","(a) In addition to the requirements of this subpart, every portable fire extinguisher must be tested and listed for marine use by a recognized laboratory as defined in 46 CFR 159.001-3, and must comply with the following standards (incorporated by reference, see § 162.028-1), as appropriate: (1) UL 8; (2) UL 154; (3) UL 299; (4) UL 626; (5) UL 711; and (6) UL 2129. (b) Every portable fire extinguisher must be self-contained; when charged, it must not require any additional source of extinguishing agent or expellant energy for its operation during the time it is being discharged. It must weigh no more than 50 pounds when fully charged. (c) Every portable fire extinguisher must be supplied with a suitable bracket which will hold the extinguisher securely in its stowage location on vessels or boats, and which is arranged to provide quick and positive release of the extinguisher for immediate use. During vibration testing, the extinguisher must be tested in the marine bracket. (d) Every portable extinguisher may be additionally examined and tested to establish its reliability and effectiveness in accordance with the intent of this specification for a “marine type” portable fire extinguisher when considered necessary by the Coast Guard or by the recognized laboratory." 46:46:6.0.1.1.5.4.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-4 Marine type label.,USCG,,,"[CGFR 60-36, 25 FR 10640, Nov. 5, 1960, as amended by CGFR 64-19, 29 FR 7360, June 5, 1964; USCG-2012-0196, 81 FR 48278, July 22, 2016]","(a) In addition to all other markings, every portable extinguisher must bear a label containing the Coast Guard approval number, thus: “Marine Type USCG Type Approval No. 162.028/____.” (b) All such labels are to be obtained only from the recognized laboratory and will remain under its control until attached to product found acceptable under its inspection and labeling program." 46:46:6.0.1.1.5.4.1.5,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-5 Recognized laboratories.,USCG,,,"[USCG-2012-0196, 81 FR 48278, July 22, 2016]",A list of recognized independent laboratories that can perform approval tests of portable fire extinguishers is available from the Commandant and online at http://cgmix.uscg.mil . 46:46:6.0.1.1.5.4.1.6,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,"§ 162.028-6 Examinations, tests, and inspections.",USCG,,,,"(a) Full examinations, tests, and inspections to determine the suitability of a product for listing and labeling, and to determine conformance of labeled product to the applicable requirements are conducted by the recognized laboratory. Whenever any work is being done on components or the assembly of such product, the manufacturer shall notify the recognized laboratory in order that an inspector may be assigned to the factory to conduct such examinations, inspections, and tests as to satisfy himself that the quality assurance program of the manufacturer is satisfactory, and that the labeled product is in conformance with the applicable requirements. (b) Manufacturers of listed or labeled marine type portable fire extinguishers shall maintain quality control of the materials used, manufacturing methods, and the finished product so as to meet the applicable requirements, and shall make sufficient inspections and tests of representative samples of the extinguishers and various components produced to maintain the quality of the finished product. Records of tests conducted by the manufacturer shall be made available to the laboratory inspector or to the merchant marine inspector, or both, for review upon request. (c) Follow-up check tests, examinations, and inspections of product listed and labeled as a “marine type” portable fire extinguisher acceptable to the Commandant as approved for use on merchant vessels and motorboats may be conducted by the Coast Guard, as well as by the recognized laboratory. (d) The laboratory inspector, or the Coast Guard marine inspector assigned by the Commander of the District in which the factory is located, or both, shall be admitted to any place in the factory where work is being done on listed or labeled product, and either or both inspectors may take samples of parts or materials entering into construction, or final assemblies, for further examinations, inspections or tests. The manufacturer shall provide a suitable place and the apparatus necessary for the performance of the tests which are done at the place of manufacture." 46:46:6.0.1.1.5.4.1.7,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-7 Procedure for listing and labeling.,USCG,,,"[USCG-2012-0196, 81 FR 48278, July 22, 2016]","(a) Manufacturers having models of extinguishers they believe are suitable for marine service may make application for listing and labeling of such product as a “marine-type” portable fire extinguisher by addressing a request directly to a recognized laboratory. The laboratory will inform the submitter as to the requirements for inspection, examinations, and testing necessary for such listing and labeling. All costs in connection with the examinations, tests, inspections, listing, and labeling are payable by the manufacturer. (b) [Reserved]" 46:46:6.0.1.1.5.4.1.8,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.028,"Subpart 162.028—Extinguishers, Fire, Portable, Marine Type",,§ 162.028-8 Termination of listing or labeling.,USCG,,,"[CGFR 60-36, 25 FR 10640, Nov. 5, 1960, as amended by CGD 72-214R, 38 FR 6880, Mar. 14, 1973]","(a) Listing or labeling as a marine type portable fire extinguisher acceptable to the Commandant as approved for use on inspected vessels and motorboats, may be terminated, withdrawn, cancelled, or suspended by written notice to the recognized laboratory from the Commandant, or by written notice to the manufacturer from the recognized laboratory or from the Commandant, under the following conditions: (1) When the manufacturer does not desire to retain the service. (2) When the listed product is no longer being manufactured. (3) When the manufacturer's own program does not provide suitable assurance of the quality of the listed or labeled product being manufactured. (4) When the product manufactured no longer conforms to the current applicable requirements. (5) When service experience or laboratory or U.S. Coast Guard reports indicate a product is unsatisfactory. (b) [Reserved]" 46:46:6.0.1.1.5.5.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-1 Incorporation by reference.,USCG,,,"[USCG-2012-0196, 81 FR 48278, July 22, 2016]","(a) Certain material is incorporated by reference into this part with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in this section, the Coast Guard must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the U.S. Coast Guard, Office of Design and Engineering Standards (CG-ENG), 2703 Martin Luther King Jr. Avenue SE., Stop 7509, Washington, DC 20593-7509, and is available from the sources listed below. It is also available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . (b) National Fire Protection Association (NFPA), 1 Batterymarch Park, Quincy, MA 02169, 617-770-3000, http://www.nfpa.org . (1) NFPA 10, Standard for Portable Fire Extinguishers, 2010 Edition, effective December 5, 2009, IBR approved for § 162.039-2(a). (2) [Reserved] (c) UL (formerly Underwriters Laboratories), 12 Laboratory Drive, P.O. Box 13995, Research Triangle Park, NC 27709, 919-549-1400, http://www.ul.com . (1) UL 8, Standard for Safety for Water Based Agent Fire Extinguishers, Sixth Edition, dated February 28, 2005, as amended through July 27, 2010, IBR approved for § 162.039-3(a). (2) UL 154, Standard for Safety for Carbon-Dioxide Fire Extinguishers, Ninth Edition, dated February 28, 2005, as amended through November 8, 2010, IBR approved for § 162.039-3(a). (3) UL 299, Standard for Safety for Dry Chemical Fire Extinguishers, Eleventh Edition, dated April 13, 2012, IBR approved for § 162.039-3(a). (4) UL 626, Standard for Safety for Water Fire Extinguishers, Eighth Edition, dated February 28, 2005, as amended through November 8, 2010, IBR approved for § 162.039-3(a). (5) UL 711, Standard for Safety for Rating and Fire Testing of Fire Extinguishers, Seventh Edition, dated December 17, 2004, as amended through April 28, 2009, IBR approved for §§ 162.039-2(a) and 162.039-3(a). (6) UL 2129, Standard for Safety for Halocarbon Clean Agent Fire Extinguishers, Second Edition, dated February 28, 2005, as amended through March 30, 2012, IBR approved for § 162.039-3(a)." 46:46:6.0.1.1.5.5.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-2 Classification.,USCG,,,"[CGFR 65-9, 30 FR 11487, Sept. 8, 1965, as amended by USCG-2012-0196, 81 FR 48279, July 22, 2016]","(a) Portable and semi-portable extinguishers must be marked with a combined number and letter designation. The letter designates the general class of fire for which the extinguisher is suitable as identified in NFPA 10 (incorporated by reference, see § 162.039-1). The number indicates the relative extinguishing potential of the device as rated by UL 711 (incorporated by reference, see § 162.039-1). (b) [Reserved]" 46:46:6.0.1.1.5.5.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-3 Requirements.,USCG,,,"[USCG-2012-0196, 81 FR 48279, July 22, 2016]","(a) In addition to the requirements of this subpart, every semi-portable fire extinguisher must be tested and listed for marine use by a recognized laboratory as defined in 46 CFR 159.001-3, and must comply with the following standards (incorporated by reference, see § 162.039-1), as appropriate: (1) UL 8; (2) UL 154; (3) UL 299; (4) UL 626; (5) UL 711; and (6) UL 2129. (b) Every semi-portable fire extinguisher must be self-contained; when charged, it must not require any additional source of extinguishing agent or expellant energy for its operation during the time it is being discharged. It must weigh more than 50 pounds, when fully charged. (c) Every semi-portable fire extinguisher must be supplied with a suitable bracket which will hold the extinguisher securely in its stowage location on vessels or boats, and which is arranged to provide quick and positive release of the extinguisher for immediate use. (d) Every semi-portable extinguisher may be additionally examined and tested to establish its reliability and effectiveness in accordance with the intent of this specification for a “marine type” semi-portable fire extinguisher when considered necessary by the Coast Guard or by the recognized laboratory." 46:46:6.0.1.1.5.5.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-4 Marine type label.,USCG,,,"[USCG-2012-0196, 81 FR 48279, July 22, 2016]","(a) In addition to all other markings, every semi-portable extinguisher must bear a label containing the “marine type” listing manifest issued by a recognized laboratory. This label will include the Coast Guard approval number, thus: “Marine Type USCG Type Approval No. 162.039/______.” (b) All such labels are to be obtained only from the recognized laboratory and will remain under its control until attached to a product found acceptable under its inspection and labeling program." 46:46:6.0.1.1.5.5.1.5,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-5 Recognized laboratories.,USCG,,,"[USCG-2012-0196, 81 FR 48279, July 22, 2016]","(a) A list of recognized independent laboratories that can perform approval tests of semi-portable fire extinguishers is available from the Commandant and online at http://cgmix.uscg.mil . (b) [Reserved]" 46:46:6.0.1.1.5.5.1.6,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,"§ 162.039-6 Examinations, tests, and inspections.",USCG,,,,"(a) Full examinations, tests, and inspections to determine the suitability of a product for listing and labeling, and to determine conformance of labeled product to the applicable requirements are conducted by the recognized laboratory. Whenever any work is being done on components or the assembly of such product, the manufacturer shall notify the recognized laboratory in order that an inspector may be assigned to the factory to conduct such examinations, inspections, and tests as to satisfy himself that the quality assurance program of the manufacturer is satisfactory, and that the labeled product is in conformance with the applicable requirements. (b) Manufacturers of listed or labeled marine type semiportable fire extinguishers shall maintain quality control of the materials used, manufacturing methods, and the finished product so as to meet the applicable requirements, and shall make sufficient inspections and tests of representative samples of the extinguishers and various components produced to maintain the quality of the finished product. Records of tests conducted by the manufacturer shall be made available to the laboratory inspector or to the Coast Guard marine inspector, or both, for review upon request. (c) Followup check tests, examinations, and inspections of product listed and labeled as a “marine type” semiportable fire extinguisher acceptable to the Commandant as approved for use on merchant vessels and motorboats may be conducted by the Coast Guard, as well as by the recognized laboratory. (d) The laboratory inspector, or the Coast Guard merchant marine inspector assigned by the Commander of the District in which the factory is located, or both, shall be admitted to any place in the factory where work is being done on listed or labeled product, and either or both inspectors may take samples of parts or materials entering into construction, of final assemblies, for further examinations, inspections, or tests. The manufacturer shall provide a suitable place and the apparatus necessary for the performance of the tests which are done at the place of manufacture." 46:46:6.0.1.1.5.5.1.7,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-7 Procedure for listing and labeling.,USCG,,,"[CGFR 65-9, 30 FR 11487, Sept. 8, 1965, as amended by USCG-2012-0196, 81 FR 48279, July 22, 2016]","(a) Manufacturers having models of extinguishers they believe are suitable for marine service may make application for listing and labeling of such product as a “marine type” semi-portable fire extinguisher by addressing a request directly to a recognized laboratory. The laboratory will inform the submitter as to the requirements for inspections, examinations, and testing necessary for such listing and labeling. All costs in connection with the examinations, tests, and inspections, listings and labelings are payable by the manufacturer. (b) [Reserved]" 46:46:6.0.1.1.5.5.1.8,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.039,"Subpart 162.039—Extinguishers, Fire, Semi-portable, Marine Type",,§ 162.039-8 Termination of listing or labeling.,USCG,,,,"(a) Listing or labeling as a marine type semiportable fire extinguisher acceptable to the Commandant as approved for use on inspected vessels or motorboats may be terminated, withdrawn, canceled, or suspended by written notice to the recognized laboratory from the Commandant, or by written notice to the manufacturer from the recognized laboratory or from the Commandant under the following conditions: (1) When the manufacturer does not desire to retain the service. (2) When the listed product is no longer being manufactured. (3) When the manufacturer's own program does not provide suitable assurance of the quality of the listed or labeled product being manufactured. (4) When the product manufactured no longer conforms to the current applicable requirements. (b) [Reserved]" 46:46:6.0.1.1.5.6.1.1,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-1 Scope.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3382, Jan. 16, 2009]","(a) This subpart contains— (1) Procedures for approval of 15 ppm separators, oil content meters, and bilge alarms. (2) Design specifications for this equipment; (3) Tests required for approval; (4) Procedures for obtaining designation as a facility authorized to conduct approval tests; (5) Marking requirements; and (6) Factory inspection procedures. (b) [Reserved]" 46:46:6.0.1.1.5.6.1.10,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-17 Separator test rig.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3384, Jan. 16, 2009]","(a) This section contains requirements for test rigs used in approval testing of separators. A diagram of a typical test rig is shown in Figure 162.050-17(a). (b) Each mixture pump on a test rig must— (1) Be a centrifugal pump capable of operating at 1,000 revolutions per minute or more; (2) Have a delivery capacity of at least 1.5 times the maximum throughput at which the separator being tested is designed to operate; (3) Have a maximum delivery pressure that is equal to or greater than the maximum influent pressure at which the separator is designed to operate; and (4) Have either bypass piping to its suction side or a throttle valve or orifice on its discharge side. (c) The inlet piping of the test rig must be sized so that— (1) Influent water flows at a Reynolds Number of at least 10,000; (2) The influent flow rate is between one and three meters per second; and (3) Its length is at least 20 times its inside diameter. (d) Each sample point on a test rig must meet the design requirements described in Figure 162.050-17(d) and must be in a vertical portion of the test rig piping." 46:46:6.0.1.1.5.6.1.11,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-19 Oil content meter and bilge alarm test rig.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3385, Jan. 16, 2009]","(a) This section contains requirements for test rigs used in approval testing of oil content meters and meter. A typical test rig is described in Figure 162.050-19. The mixture pipe shown in Figure 162.050-19 is the portion of test rig piping between the oil injection point and the meter or bilge alarm piping. (b) Each sample point on a test rig must be of the type described in Figure 162.050-17(e) and must be in a vertical portion of the test rig piping. (c) Each test rig must have a centrifugal pump that is designed to operate at 1,000 revolutions per minute or more. (d) The mixture pipe on a test rig must have a uniform inside diameter." 46:46:6.0.1.1.5.6.1.12,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-20 Separator and bilge alarm test fluids.,USCG,,,"[USCG-2004-18939, 74 FR 3385, Jan. 16, 2009]","(a) Tests required in §§ 162.050-23 and 162.050-35 must be performed using the following three types of test fluids: (1) Test Fluid A, which is a marine residual fuel oil in accordance with ISO 8217 (incorporated by reference, see § 162.050-4), type RMG 380 (density at 15 °C not less than 980 kg/m 3 ); (2) Test Fluid B which is a marine distillate fuel oil in accordance with ISO 8217, type DMA (density at 15 °C not less than 830 kg/m 3 ); (3) Test Fluid C must be a mixture of an oil-in-fresh water emulsion, where 1 kg of the mixture consists of: (i) 947.8 g of fresh water; (ii) 25.0 g of Test Fluid A; (iii) 25.0 g of Test Fluid B; (iv) 0.5 g of surfactant (sodium salt of dodecylbenzene sulfonic acid) in the dry form; and (v) 1.7 g of iron oxides, a black ferrosoferric oxide (Fe 3 O 4 ) with a particle size distribution of which 90 percent is less than 10 microns, the remainder having a maximum particle size of 100 microns. (b) Test Fluid C must be prepared as needed for § 162.050-23 or § 162.050-35 by using the following procedures: (1) Measure out 1.2 times the quantity of surfactant required from the WORKSHEET FOR DETERMINING CONSTITUENTS OF TEST FLUID C, see figure 162.050-20; (2) Mix it with fresh water and stir well in a small container to make a mixture until the surfactant has been thoroughly dissolved, but use no more than the minimum amount of water necessary to make a complete solution; (3) Fill clean test fluid tank with fresh water with a quantity 1.2 times the volume of the total quantity of water in Test Fluid C needed for the test described in §§ 162.050-23 and 162.050-35; (4) Operate the centrifugal pump B running at a speed of not less than 3,000 rpm with a flow rate at which the volume of the test fluid has been changed out at least once per minute; (5) Add the surfactant mixture from paragraph (b)(2) of this section first, followed by oil and suspended solids (iron oxides) respectively, both 1.2 times of the required amounts, to the fresh water in the tank; (6) To establish a stable emulsion keep running the centrifugal pump B for one hour and confirm no oil floats on the surface of the test fluid; and (7) After the one hour stated in paragraph (b)(6) of this section, keep running the centrifugal pump B at reduced speed to approximately 10 percent of original flow rate, until the end of the test." 46:46:6.0.1.1.5.6.1.13,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-21 Separator: Design specification.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3388, Jan. 16, 2009]","(a) A separator must be designed to operate in each plane that forms an angle of 22.5° with the plane of its normal operating position. (b) The electrical components of a separator that are to be installed in an explosive atmosphere must be approved by an independent laboratory as components that Underwriters Laboratories Standard 913 (dated April 8, 1976) (incorporated by reference, see § 162.050-4) defines as intrinsically safe for use in a Class I, Group D hazardous location. (c) Each separator component that is a moving part must be designed so that its movement during operation of the separator does not cause formation of static electricity. (d) Each separator must be designed in accordance with the applicable requirements in subchapters F and J of this chapter. (e) Each separator must be designed to be operated both automatically and manually. Each separator must be capable of operating automatically for at least 24 hours. (f) Each separator must be designed so that adjustments to valves or other equipment are not necessary to start it. (g) Each part of a separator that is susceptible to wear and tear must be readily accessible for maintenance in its installed position. (h) A separator must be designed so that it does not rely in whole or in part on dilution of influent mixtures as a means of performing its function." 46:46:6.0.1.1.5.6.1.14,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-23 Separator: Approval tests.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3388, Jan. 16, 2009]","(a) Test Conditions. (1) Each test described in this section must be performed at a throughput and influent pressure equal to the maximum throughput and pressure at which the separator being tested is designed to operate. The tests and each of the steps in the tests must be carried out in the order described in this section. Each test must be performed without time delay between steps in the test. (2) A test rig of the type described in § 162.050-17 must be used in performing each test. (3) If a separator has a supply pump, it must be tested using that pump. If a separator does not have a supply pump, it must be tested using the mixture pump on the test rig. (4) The influent water used in each test must be clean fresh water or clean fresh water in solution with sodium chloride. In either case, the relative density of the water must be no greater than 1.015 at 20 °C. (5) Each test must be conducted at an ambient temperature of between 10 °C and 30 °C. (6) The oil content of each sample must be measured using the method described in § 162.050-39. (7) Influent oil content must be determined during testing by measuring the flow rates of the oil and water that are mixed to form the influent or by use of an oil content meter on the inlet piping of the test rig. If an oil content meter is used, a sample of influent and a meter reading must be taken at the beginning of each test. If the meter reading is not within ±10 percent of the oil content of the sample, the meter readings subsequently taken during the test are unacceptable test results. (8) When collecting a sample at a sample point that has a stop cock, the first minute of fluid flow through the stop cock must not be included in the sample collected. (9) In each test, the separator must be operated in accordance with the procedures described in its instruction manual. (10) No maintenance, including replacement of parts, may be performed on a separator during or between the tests described in this section. (11) A 1 liter sample of each oil to be used in testing must be taken and provided for use in the sample analysis required by § 162.050-39 . (12) The separator may not be operated manually in Test No. 5A. (13) If a separator has an integral bilge alarm, the separator must be tested with the bilge alarm installed. (b) The following tests must be conducted using Test Fluid A: (1) Test No. 1A. The separator is filled with water and started. Next, the separator is fed with pure Test Fluid A for at least 5 minutes and then with a mixture of Test Fluid A and water influent containing Test Fluid A content of between 5,000 and 10,000 ppm until a steady flow rate at a steady, constant ppm occurs. After the flow rate is steady, the influent is fed to the separator for 30 minutes. Samples of separated water effluent are taken after the first 10 and 20 minutes. At the end of the 30-minute period, the air cock on the test rig is opened and, if necessary, the oil and water supply valves are closed to stop the flow of influent. A sample is then taken of the separated water effluent as the effluent flow ceases. (2) Test No. 2A. Repeat Test No. 1A in paragraph (b)(1) of this section using an influent containing approximately 25 percent oil and 75 percent water. Percentage is on a by volume basis. (3) Test No. 3A. The separator is fed with 100 percent Test Fluid A until Fluid A is discharged at the oil discharge outlet of the separator at essentially the same rate that oil is being fed to the separator. The separator is then fed with 100 percent Test Fluid A for 5 additional minutes. If any oily mixture is discharged from the separated water outlet on the separator during the test, that observation is recorded. (4) Test No. 4A. The separator is fed with water for 15 minutes. Samples of the separated water effluent are taken at the beginning of the test and after the first 10 minutes. (5) Test No. 5A. The separator is operated automatically for 3 hours. During the test, the separator is continuously fed with an influent varying from water to a mixture of 25 percent Test Fluid A in water and back to water every 15 minutes. The Test Fluid A concentration in the influent is varied in at least five equal increments during each 15-minute period and the time intervals between the incremental changes are equal. During the last hour, the separator must be inclined at an angle of 22.5° with the plane of its normal operating position. During the last time increment in which the unit is fed a 25 percent Fluid A mixture, a sample of the separated water effluent is taken. If the separator stops at any time during this test, that observation is recorded. (c) The following tests must be conducted using Test Fluid B: (1) Test No. 1B. Repeat Test No. 1A in paragraph (b)(1) of this section using Test Fluid B; and (2) Test No. 2B. Repeat Test No. 2A in paragraph (b)(2) of this section using Test Fluid B. (d) The following tests must be conducted using Test Fluid C: Test No. 1C. The separator is fed with a mixture composed of 6 percent Test Fluid C and 94 percent water by volume such that the emulsified Test Fluid C content is approximately 3,000 ppm in the test water until a steady flow rate occurs. After the flow rate is steady, the influent containing the 6 percent Test Fluid C solution is fed to the separator operating automatically for 3 hours. Samples of separated water effluent are taken at 50 minutes and 100 minutes. At the end of the 3-hour period, the air cock on the test rig is opened and, if necessary, the oil and water supply valves are closed to stop the flow of influent. A sample is then taken of the separated water effluent as the effluent flow ceases." 46:46:6.0.1.1.5.6.1.15,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-25 Cargo monitor: Design specification.,USCG,,,"[44 FR 53359, Sept. 13, 1979, as amended by CGD 76-088c, 48 FR 45727, Oct. 6, 1983; USCG-2004-18939, 74 FR 3389, Jan. 16, 2009]","(a) This section contains requirements that apply to cargo monitors. (b) Each monitor must be designed so that it is calibrated by a means that does not involve manually mixing a known quantity of oil and a known quantity of water to form a mixture and manually feeding the mixture into the monitor. (c) The electrical components of a monitor that are to be installed in an explosive atmosphere must be approved by an independent laboratory as components that Underwriters Laboratories Standard 913 (dated April 8, 1976) (incorporated by reference, see § 162.050-4) defines as intrinsically safe for use in a Class I, Group D hazardous location. (d) Each monitor component that is a moving part must be designed so that its movement during operation of the monitor does not cause formation of static electricity. (e) A monitor must be designed to operate in each plane that forms an angle of 22.5° with the plane of its normal operating position. (f) Each monitor must be designed in accordance with the applicable requirements contained in subchapters F and J of this chapter. (g) Each monitor must be designed so that it records each change in oil content of the mixture it is measuring within 20 seconds after the change occurs. (h) Each monitor must have a device that produces a warning signal and a signal that can be used to actuate valves in a vessel's fixed piping system, when— (1) The oil content of the mixture being measured exceeds the concentration limit set by the operator of the monitor; and (2) Malfunction, breakdown, or other failure of the monitor occurs. (i) Each monitor must have a means to determine whether it is accurately calibrated." 46:46:6.0.1.1.5.6.1.16,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-27 Oil content meter: Approval tests.,USCG,,,"[USCG-2004-18939, 74 FR 3389, Jan. 16, 2009]","This section contains requirements that apply to performing each test. (a) Test conditions. (1) The tests and each step in the tests must be carried out in the order described in this section. Each test must be performed without time delay between steps in the test. No maintenance, including replacement of parts, may be performed on the meter during or between the tests described in this section. (2) A test rig of the type described in § 162.050-19 must be used when performing each test. (3) Each mixture used during the tests must be prepared by combining oil supplied from the oil injection pipe of the test rig and water supplied from the mixture tank of the test rig. However, if the flow of oil through the oil injection pipe becomes intermittent, oil and water may be combined in the mixture tank to form the mixture. (4) A mixture may be circulated through a meter only once during testing. (5) Unless otherwise provided in a specific test, the water used in each test must be clean, fresh water. (6) The oil used in each test, except Test No. 2 in paragraph (c) of this section, must be Arabian light crude oil. (7) Each test must be performed at an ambient temperature of between 10 °C and 30 °C. (8) Unless otherwise provided in a specific test, each test must be performed at the maximum mixture pressure, the maximum flow rate, and the power supply ratings at which the meter is designed to operate. (9) The particulate contaminant described in Test No. 5 in paragraph (f) of this section, if not attapulgite, must be of a type that does not lose more than 3 percent of its weight after ignition and must be insoluble in a 500 ppm mixture. (10) In each test the meter must be operated in accordance with the procedures described in its instructions manual. (11) Unless otherwise provided in a specific test, the centrifugal pump shown in Figure 162.050-19 in § 162.050-19 must be operated at 1,000 revolutions per minute or more in each test. (12) Whenever the oil content of a mixture is recorded, a sample of the mixture must also be taken. The oil content of the sample must be measured using the method described in § 162.050-39. (13) A one-liter sample of each oil to be used in testing must be taken and provided for use in the sample analysis required by § 162.050-39. (b) Test No. 1 Calibration and Zero Test. The meter is calibrated and zeroed to manufacturer's instructions. It is then fed with water for 15 minutes and then with mixtures in the following concentrations: 15 ppm, 50 ppm, 100 ppm, and each additional concentration, in increments of 50 ppm up to the highest oil concentration that can be read on the meter. Each mixture is fed to the meter in the order listed in Table 162.050-27(c) for 15 minutes. Water is fed to the meter for a 15-minute period between each mixture. At the end of each 15-minute period, an oil content reading is obtained and recorded, and a calibration curve must be created. (c) Test No. 2 Response to Different Oil Types Test. (1) If the meter is designed for use with crude oils, it is fed with a mixture of water and the first oil listed in Table 162.050-27(c) at the following concentrations: 15 ppm, 100 ppm, and a concentration that is 90 percent of the highest oil concentration in water that can be read on the meter. Each concentration is fed to the meter in the order listed until a steady reading occurs and is recorded. After each steady reading is recorded, the meter is fed with water for 15 minutes. At the end of each 15-minute period of feeding the meter with water, an oil content reading is again obtained and recorded, and a calibration curve must be created. (2) The steps described in paragraph (c)(1) of this section are repeated using each of the other oils listed in Table 162.050-27(c). A calibration curve must be created for each oil tested. Table 162.050-27( c )—Oil Type and Characteristics (3) If any oil listed in Table 162.050-27(c) is unavailable, an oil with similar properties may be substituted in testing. (4) If the meter will be used with refined oil products, the steps described in paragraph (c)(1) of this section are performed using each of the following: (i) Leaded regular grade automotive gasoline; (ii) Unleaded automotive gasoline; (iii) Kerosene; and (iv) Light diesel or No. 2 fuel oil. (5) If the meter will be used with category C and D oil-like noxious liquid substances to meet the requirements of 33 CFR 151.41(b), the tests described in paragraphs (c) and (d) of this section are to be performed using the substances for which approval is sought. (d) Test No. 3 Response Time Test. (1) The meter is fed with water, zeroed, and then fed with a 100 ppm mixture. The time at which the meter first detects oil in the mixture, the times of reading 63 ppm and 90 ppm, and the time of reaching the highest steady reading of oil content are recorded. The oil content of the mixture at the highest steady reading is also recorded. (2) The metering pump is turned off and the time at which the highest reading starts to decrease, the times of reading 37 ppm and 10 ppm, and the time of returning to the lowest steady oil content reading are recorded. The oil content of the mixture at the lowest steady reading is also recorded. (3) The time interval between first detecting oil in the mixture and reading 63 ppm, and the time interval between the first decrease in the highest reading and reading 37 ppm, are averaged and recorded as the response time for the meter. (e) Test No. 4 Oil Fouling and Calibration Shift Test. (1) The meter is fed with water, zeroed, and then fed with a mixture containing 10 percent oil for one minute. The following must be recorded: (i) Time at which the meter first detects oil; (ii) Time of reading 15 ppm; (iii) Time of reading 100 ppm; (iv) Time of exceeding the highest oil concentration that can be read on the meter; (v) Time of returning to the highest oil concentration that can be read on the meter; (vi) Time of returning to a reading of 100 ppm; (vii) Time of returning to a reading of 15 ppm; and (viii) Time of returning to the lowest steady oil content reading. (2) The oil content of the mixture at the lowest steady reading described in paragraph (e)(1)(viii) of this section is recorded. (3) The meter is fed with water, zeroed, and then fed with oil for 1 minute after which the flow of water is resumed. The times described in paragraph (e)(1) of this section are recorded. (4) If it is necessary to clean the meter after each oil-fouling test for it to return to a zero reading, this fact and the time required to clean and recalibrate the meter must be noted and recorded in the test report. (5) The meter is fed with a 100 ppm mixture until a steady oil content reading is obtained and recorded. (f) Test No. 5 Contaminant Test. (1) The meter is fed with a 15 ppm mixture until a steady oil content reading is obtained and recorded. (2) The meter is fed with a 15 ppm oil mixture of contaminated water consisting of not less than 270 ppm by weight of the clay mineral attapulgite, or similar contaminant that is stable in both fresh and salt water and 30 ppm by weight of iron oxides. The test contaminant should have a particle size distribution with about 30 percent of 10 microns or less and a maximum particle size of 100 microns. The oil content reading, when steady, is recorded. (3) Each of the two contaminants will be mixed sequentially in the following manner: the mixing of attapulgite shall be for a period of not less than 15 minutes so that a homogeneous suspension is formed; then, iron oxides will be added for an additional period of not less than 10 minutes. The mixing process should maintain the contaminants in suspension throughout the test period. (4) The test in paragraph (f)(2) of this section is repeated for 100 and 300 ppm oil mixtures in contaminated water. (g) Test No. 6 Air Entrainment Test. (1) The meter is fed with a 15 ppm mixture until a steady oil content reading is obtained and recorded. (2) Air is injected into the meter test rig before the sample pump or, in the absence of such pump, immediately before any conditioning unit used to prepare the mixture for measurement. Injection must be by needle having an orifice dimension not exceeding 0.5 mm in diameter arranged in line with the sample flow. The quantity of air injected must be 1 percent of the designated flow rate of the sample pump or conditioning unit at the point of injection. (3) Air must be delivered to the system by direct injection or pump via a suitable measuring device designed to permit a constant controllable flow rate within ±10 percent of the required rate of injection for an uninterrupted effective test period of not less than 15 minutes. (4) The oil content reading, when steady, is recorded. (h) Test No. 7 Oil Particle Size—Centrifugal Pump Test. (1) The meter is fed with a 100 ppm mixture until a steady oil content reading is obtained and recorded. (2) The meter is fed with a 100 ppm mixture that has first passed through the centrifugal pump of the test rig. The pump is run at one-fourth of its design speed. The oil content reading, when steady, is recorded. (3) The steps described in paragraph (h)(2) of this section are repeated with the pump running at one-half of its design speed and then repeated at its design speed. (i) Test No. 8 Temperature Test. (1) The steps described in paragraph (h)(1) of this section are repeated. (2) The temperature of the mixture is adjusted to 10 °C and the flow continued until a steady oil content reading is obtained and recorded. (3) The steps described in paragraph (i)(2) of this section are repeated with the temperature of the mixture at 65 °C or the highest mixture temperature at which the meter is designed to operate, whichever is lower. (j) Test No. 9 Sample Pressure or Flow Test. (1) The steps described in paragraph (h)(1) of this section are repeated. (2) If the meter has a positive displacement mixture pump, the mixture pressure is lowered to one-half of the meter's maximum design pressure. If the meter has a centrifugal mixture pump, or is not equipped with a mixture pump, the mixture flow rate is reduced to one-half of the meter's design flow rate. The reduced flow rate or mixture pressure is maintained until a steady oil content reading is obtained and recorded. (3) If the meter has a positive displacement mixture pump, the mixture pressure is increased to twice the meter's design pressure. If the meter has a centrifugal mixture pump or does not have a mixture pump, the mixture flow rate is increased to twice the meter's maximum design flow rate. The increased flow rate or mixture pressure is maintained until a steady oil content reading is obtained and recorded. (k) Test No. 10 Shutoff Test. (1) The steps described in paragraph (h)(1) of this section are repeated. (2) The water and metering pumps on the test rig are stopped for 8 hours after which the steps described in paragraph (h)(1) of this section are repeated. (l) Test No. 11 Supply Voltage Variation Test. (1) The supply voltage to the meter is increased to 110 percent of its design supply voltage. The meter is then fed a 100 ppm mixture for one hour. At the end of the 1-hour period, an oil content reading is obtained and recorded. (2) The steps described in paragraph (l)(1) of this section are repeated with the supply voltage to the meter lowered to 90 percent of its design supply voltage. (3) Upon completing the steps described in paragraph (l)(2) of this section, the supply voltage to the meter is returned to the design rating. (4) The steps described in paragraphs (l)(1) through (l)(3) of this section are repeated varying each power supply to the meter in the manner prescribed in those steps for supply voltage. (m) Test No. 12 Calibration and Zero Drift Test. (1) The meter is calibrated and zeroed. (2) The steps described in paragraph (h)(1) of this section are repeated. (3) A 100 ppm mixture is fed to the meter for 8 hours. At the end of the 8-hour period, an oil content reading is obtained and recorded. (4) The meter is fed with water until a steady oil content reading is obtained and recorded. (n) Test No. 13 Shutdown and Restart Test. (1) All power to the meter is shutoff for one week. After 1 week the meter is restarted, zeroed, and calibrated. (2) The meter is fed with a 100 ppm mixture for 1 hour. An oil content reading is then obtained and recorded. (3) The meter is fed with water for 1 hour. An oil content reading is then obtained and recorded. (4) The steps described in paragraphs (n)(2) and (n)(3) of this section are repeated three additional times. During the last hour in which the meter is fed with a 100 ppm mixture, the meter is inclined at an angle of 22.5° with the plane of its normal operating position." 46:46:6.0.1.1.5.6.1.17,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-33 Bilge alarm: Design specification.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3391, Jan. 16, 2009]","(a) This section contains requirements that apply to bilge alarms. (b) Each bilge alarm must be designed to meet the requirements for an oil content meter in § 162.050-25(b) through (f) and 162.050-25(i), and the requirements in this section. (c) Each bilge alarm must have a device that produces a warning signal, and a signal that can be used to actuate stop valves in a vessel's fixed piping system, when— (1) the oil content of the mixture being measured by the bilge alarm exceeds 15 ppm ±5 ppm, and (2) malfunction, breakdown, or other failure of the bilge alarm occurs. (d) Each bilge alarm must have a ppm display. Emulsions and/or the type of oil must not affect the ppm display. Calibrating the bilge alarm must not be necessary once installed on board the vessel, however, onboard testing in accordance with the manufacturer's operating instructions is permitted for the purposes of checking instrument drift and repeatability of the instrument reading, as well as the ability to re-zero the instrument. The accuracy of the readings must at all times remain within the limits described in paragraph (c)(1) of this section. (e) Each bilge alarm must be designed so that it displays each change in oil content of the mixture it is measuring within 5 seconds after the change occurs. (f) Access to the bilge alarm must require the breaking of a seal, except when— (1) Re-zeroing the instrument; (2) Checking the instrument drift; or (3) Checking the repeatability of the instrument reading. (g) Each bilge alarm must activate its alarm whenever clean water is used for cleaning or zeroing purposes. (h) The bilge alarm must record date, time, alarm status, and operating status of the 15 ppm bilge separator. The recording device must also store data for at least 18 months and be able to display or print a protocol. In the event the 15 ppm bilge alarm is replaced, means must be provided to ensure the data recorded remains available on board for 18 months." 46:46:6.0.1.1.5.6.1.18,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-35 Bilge alarm: Approval tests.,USCG,,,"[USCG-2004-18939, 74 FR 3391, Jan. 16, 2009]","This section contains requirements that apply to bilge alarms. (a) Test Conditions. (1) Each test must be conducted under the conditions prescribed for meters in § 162.050-27(a)(1) through (a)(5), (a)(7), (a)(8), (a)(10), (a)(11), and (a)(13). (2) The tests in this section must be performed using test fluids described in § 162.050-20. (3) The oil content of each sample must be measured using the method described in § 162.050-39. (b) Test No. 1A Calibration and Zero Test. (1) The bilge alarm is calibrated and zeroed to manufacturer's instructions. (2) It is then fed with water for 15 minutes and then with a mixture of Test Fluid A and water in the following concentrations: 0 ppm, 15 ppm, and the highest oil concentration that can be read on the monitor. A sample of the mixture causing actuation of the alarm is taken. The alarm is then fed with water for 15 minutes. (3) Repeat steps in paragraphs (b)(2) of this section first using Test Fluid B and then again with Test Fluid C. Collect samples as required in the test for each run of Test Fluid B and Test Fluid C. (4) If the bilge alarm must be calibrated and re-zeroed between test fluids, this must be noted in the test report. (c) Test No. 2A Contaminant Test. (1) The bilge alarm is fed for 5 minutes with a 10 ppm mixture of Test Fluid B and water. At the end of the 5-minute period an oil content reading is obtained and recorded. (2) The bilge alarm is then fed for 5 minutes with a 10 ppm mixture of Test Fluid B and water contaminated with a 10 ppm concentration of iron oxide. Any change in the bilge alarm reading during the 5 minutes is recorded. (3) Repeat steps in paragraphs (c)(1) and (2) of this section using iron oxide concentrations of 50 ppm and 100 ppm. (4) The bilge alarm is then fed for 5 minutes with a 10 ppm mixture of Test Fluid B and water. At the end of the 5-minute period an oil content reading is obtained and recorded. (5) The bilge alarm is fed for 5 minutes with a 10 ppm mixture of Test Fluid B and fresh water with 6 percent sodium chloride. Any change in the bilge alarm reading is recorded. (d) Test No. 3A Sample Pressure or Flow Test. (1) The bilge alarm is fed with a mixture of Test Fluid B and water and the test fluid content of the mixture is increased until the bilge alarm actuates. The ppm display is recorded and a sample of the mixture causing actuation of the alarm is taken. (2) If the alarm has a positive displacement mixture pump, the mixture pressure is reduced to one-half of the alarm's maximum design pressure. If the alarm has a centrifugal mixture pump or is not equipped with a mixture pump, the mixture flow rate is reduced to one-half of the alarm's maximum design flow rate. After reduction of pressure or flow rate, the oil content in the mixture is increased until the alarm actuates. The ppm display is recorded and a sample of the mixture causing actuation of the alarm is taken. (3) If the alarm has a positive displacement mixture pump, the influent pressure is increased to twice the alarm's minimum design pressure. If the alarm has a centrifugal mixture pump or if the alarm is not equipped with a mixture pump, the influent flow rate is increased to twice the alarm's maximum design flow rate. After increasing the pressure or flow rate, the oil content in the mixture is increased until the alarm actuates. The ppm display is recorded and a sample of the mixture causing actuation is taken. (e) Test No. 4A Shutoff Test. (1) The steps described in paragraph (d)(1) of this section are repeated. (2) The metering and water pumps of the test rig are stopped for 8 hours with the bilge alarm left turned on with no other changes made. (3) The metering and water pumps are started and the Test Fluid B content of the mixture is increased until the bilge alarm actuates. A sample of the mixture causing actuation is taken. The bilge alarm ppm display readings before and after the 8-hour period will be recorded. (f) Test No. 5A Supply Voltage Variation Test. (1) The supply voltage to the bilge alarm is raised to 110 percent of its design supply voltage. The bilge alarm is fed with a mixture of Test Fluid B and water and the test fluid content of the mixture is increased until the bilge alarm actuates. The ppm display is recorded and a sample of the mixture causing actuation is taken. (2) The supply voltage to the alarm is lowered to 90 percent of its design supply voltage. The bilge alarm is fed with a mixture of Test Fluid B and water and the test fluid content of the mixture is increased until the bilge alarm actuates. The ppm display is recorded and a sample of the mixture causing actuation is taken. (3) Upon completion of the steps described in paragraph (f)(2) of this section, the supply voltage to the alarm is returned to its design value. (4) The steps described in paragraphs (f)(1) through (f)(3) of this section are repeated varying each other power supply to the alarm in the manner prescribed in those steps for supply voltage. (g) Test No. 6A Calibration and Zero Drift Test. (1) The steps described in paragraph (b)(1) of this section are repeated and then the steps in paragraph (d)(1) of this section are repeated. (2) The bilge alarm is fed with a 15 ppm mixture of Test Fluid B and water for eight hours and any calibration drift is recorded. Samples of the mixture must be taken at the beginning of the test and at 2-hour intervals until the completion of the 8-hour period. (3) Following the steps in paragraph (g)(2) of this section, the bilge alarm must be run on clean, oil-free water only and any zero drift must be recorded. (h) Test No. 7A Response Time Test. (1) The bilge alarm is fed with a 40 ppm mixture of Test Fluid B and water until the bilge alarm actuates. The time of turning on the metering pump of the test rig and the time of alarm actuation are recorded. The flow rate on the flow meter of the test rig is also recorded. (i) Test No. 8A Shutdown and Restart Test. (1) All power to the bilge alarm is shutoff for 1 week. After 1 week the alarm is then restarted, zeroed, and calibrated. (2) The steps described in paragraph (d)(1) of this section are repeated. Water is then fed to the bilge alarm for 1 hour. (3) The steps described in paragraph (i)(2) of this section are repeated seven additional times. During the last hour, the alarm must be inclined at an angle of 22.5° with the plane of its normal operating position." 46:46:6.0.1.1.5.6.1.19,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-37 Vibration test.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3392, Jan. 16, 2009]","(a) Equipment submitted for Coast Guard approval must first be tested under the conditions prescribed in paragraph (b) of this section. The test must be performed at an independent laboratory that has the equipment to subject the item under test to the vibrating frequencies and amplitudes prescribed in paragraph (b) of this section. The test report submitted with the application for Coast Guard approval must be prepared by the laboratory and must contain the test results. (b)(1) Each oil content meter and bilge alarm and each control of a separator must be subjected to continuous sinusoidal vibration in each of the following directions for a 2 hour period in each direction: (i) Vertically up and down; (ii) Horizontally from side to side; and (iii) Horizontally from end to end. (2) The vibrating frequency must be 80 Hz, except that the vibrating frequency of equipment that has a resonant frequency between 2 Hz and 80 Hz must be the resonant frequency. If the vibrating frequency is between 2 Hz and 13.2 Hz, the displacement amplitude must be ±1 mm. If the vibrating frequency is between 13.2 Hz and 80 Hz, the acceleration amplitude must be ±[(.7)(gravity)]. (c) After completion of the tests specified in paragraph (b) of this section, a search must again be made for resonance and any significant change in the vibration pattern must be noted in the test report." 46:46:6.0.1.1.5.6.1.2,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-3 Definitions.,USCG,,,"[USCG-2004-18939, 74 FR 3382, Jan. 16, 2009]","As used in this subpart— 15 ppm separator means a separator that is designed to remove enough oil from an oil-water mixture to provide a resulting mixture that has an oil concentration of 15 ppm or less. Bilge alarm means an instrument that is designed to measure the oil content of oily mixtures from machinery space bilges and fuel oil tanks that carry ballast and activate an alarm at a set concentration limit and record date, time, alarm status, and operating status of the 15 ppm separator. Independent laboratory means a laboratory that— (1) Has the equipment and procedures necessary to approve the electrical components described in §§ 162.050-21(b) and 162.050-25(c), or to conduct the test described in § 162.050-37(a); and (2) Is not owned or controlled by a manufacturer, supplier, or vendor of separators, oil content meters, or bilge alarms. Oil content meter or meter means a component of the oil discharge monitoring and control system that is designed to measure the oil content of cargo residues from cargo tanks and oily mixtures combined with these residues. PPM means parts per million by volume of oil in water. Response time means the time elapsed between an alteration in the sample being supplied to the bilge alarm and the ppm display showing the correct response." 46:46:6.0.1.1.5.6.1.20,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-39 Measurement of oil content.,USCG,,,"[USCG-2004-18939, 74 FR 3393, Jan. 16, 2009]","The collection and testing of all samples of oil in water from the required test will be accomplished in accordance with ISO 9377-2 (2000), Water Quality—Determination of hydrocarbon oil index-Part 2: Method Using solvent extraction and Gas Chromatography (incorporated by reference, see § 162.050-4)." 46:46:6.0.1.1.5.6.1.3,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-4 Incorporation by reference: Where can I get a copy of the publications mentioned in this part?,USCG,,,"[USCG-2004-18939, 74 FR 3383, Jan. 16, 2009, as amended by USCG-2009-0702, 74 FR 49238, Sept. 25, 2009; USCG-2013-0671, 78 FR 60160, Sept. 30, 2013]","(a) Certain material is incorporated by reference into this subpart with the approval of the Director of the Federal Register under 5 U.S.C. 552(a) and 1 CFR part 51. To enforce any edition other than that specified in paragraph (b) of this section, the Coast Guard must publish a notice of change in the Federal Register and the material must be available to the public. All approved material is available for inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030 or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. Also, it is available for inspection at Coast Guard Headquarters. Contact Commandant (CG-ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue, SE., Washington, DC 20593-7509, telephone 202-372-1379, and is available from the sources indicated in paragraph (b) of this section. (b) American Society for Testing and Materials 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959. (1) ASTM D2777-98, Standard Practice for Determination of Precision and Bias of Applicable Test Methods of Committee D-19 on Water (“ASTM D2777-98”), incorporation by reference approved for § 162.050-15. (2) [Reserved] (c) International Organization for Standardization (ISO) 1, rue de Varembé, Case postale 56, CH-1211 Geneva 20, Switzerland (Internet: http://www.iso.org): (1) International Standard ISO 8217 Third edition 2005-11-01, Petroleum products—Fuels (class F)—Specifications of marine fuels (“ISO 8217”), incorporation by reference approved for § 162.050-20. (2) International Standard ISO 9377-2 First edition 2000-10-15, Water Quality—Determination of hydrocarbon oil index—Part 2: Method using solvent extraction and gas chromatography (“ISO 9377-2”), incorporation by reference approved for § 162.050-39. (d) Underwriters Laboratories, Inc., (UL) 12 Laboratory Drive, Research Triangle Park, NC 27709-3995 (1) Underwriters Laboratories Standard 913 (as revised April 8, 1976), incorporation by reference approved for §§ 162.050-21, 162.050-25. (2) [Reserved]" 46:46:6.0.1.1.5.6.1.4,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-5 Contents of application.,USCG,,,"[44 FR 53359, Sept. 13, 1979, as amended by USCG-1999-6216, 64 FR 53228, Oct. 1, 1999; USCG-2004-18939, 74 FR 3383, Jan. 16, 2009]","(a) An application for approval of a separator, oil content meter, or a bilge alarm must contain the following information: (1) A brief description of the item submitted for approval. (2) The name and address of the applicant and its manufacturing facility. (3) A detailed description of quality control procedures, in-process and final inspections and tests followed in manufacturing the item, and construction and sales record keeping systems maintained. (4) Arrangement drawings and piping diagrams of the item that give the information prescribed by § 56.01-10(d) of this chapter. (5) Detailed electrical plans of the type described in § 110.25-1 of this chapter. (6) An operating and maintenance manual containing detailed and easily understandable instructions on installation, operation, calibration, zeroing, and maintenance of the item. (7) For each monitor and bilge alarm and each control on a separator, the vibration test report described in § 162.050-37. (8) For each oil content meter, a statement of whether it is to be used with crude oils, refined products, or both. (9) A list of the substances used in operating the item that require certification under part 147 of this chapter as articles of ships' stores and supplies. (10) The name of the facility to conduct approval testing. (11) If the applicant intends to use a test rig other than a test rig of the facility, a detailed description of the rig. (b) An applicant may incorporate by reference in his application information that he has submitted in a previous application." 46:46:6.0.1.1.5.6.1.5,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-7 Approval procedures.,USCG,,,"[44 FR 53359, Sept. 13, 1979]","(a) An application for approval of equipment under this subpart must either be delivered by visitors to the Commanding Officer, Marine Safety Center, U.S. Coast Guard, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593, or transmitted by mail to: Commanding Officer (MSC), Attn: Marine Safety Center, U.S. Coast Guard Stop 7430, 2703 Martin Luther King Jr. Avenue SE., Washington, DC 20593-7430, in a written or electronic format. Information for electronic submittals can be found at https://www.uscg.mil/HQ/MSC . (b) The application is examined by the Coast Guard to determine whether the item complies with the design requirements and vibration standard prescribed in this subpart and to determine what probability the item has of passing the approval tests. The applicant is notified of the results of the examination. (c) If examination of the application reveals that it is incomplete, it is returned to the applicant with a statement of reasons why it is incomplete. (d) The applicant must make arrangements for approval testing directly with a testing facility and must provide the facility with a copy of the instructions manual for the equipment to be tested. (e) If applications for approval of a separator have been made for more than one size, the applicant, in lieu of submitting each size for approval testing, may submit each size that has a capacity exceeding 50 cubic meters per hour throughput, if any, and two additional sizes that have a capacity of 50 cubic meters per hour throughput or less. One of the additional sizes must have a capacity that is in the highest quartile of capacities manufactured in the 0-50 cubic meters per hour throughput range and the other must be from the lowest quartile. (f) The approval tests in this subpart must be performed by a facility designated under § 162.050-15. The facility must also be accepted as an independent laboratory by the Coast Guard under subpart 159.010 of this chapter. The facility must perform each test in accordance with the test conditions prescribed in this subpart for the test, prepare a test report for the item if it completes all of the tests, and send the report with three copies to the Commanding Officer, USCG Marine Safety Center. The applicant may observe the tests. If an item does not complete testing, a new application must be made before retesting. (g) The Commanding Officer, USCG Marine Safety Center, sends a copy of the test report to the applicant and advises him whether the item is approved. If the item is approved, an approval certificate is sent to the applicant. The approval certificate lists conditions of approval applicable to the item. (h) A separator is approved under this subpart if— (1) It meets the design requirements in § 162.050-21 and is tested in accordance with this subpart; (2) The oil content of each sample of separated water effluent taken during approval testing is 15 ppm or less; (3) During Test No. 3A an oily mixture is not observed at the separated water outlet of the separator; (4) During Test No. 5A its operation is continuous; and (5) Any substance used in operating the separator that requires certification under part 147 of this chapter as an article of ships' stores or supplies has been certified. (i) An oil content meter is approved under this subpart if— (1) It meets the design requirements in § 162.050-25 and is tested in accordance with this subpart; (2) Each oil content reading recorded during approval testing is ±10 ppm or ±10 percent, whichever is greater, of the oil content of the sample influent mixture taken at the time of the reading; (3) Its response time is twenty (20) seconds or less in Test No. 3CM; (4) The time intervals between successive readings recorded in Test No. 4CM are twenty (20) seconds or less; and (5) Any substance used in operating the monitor that requires certification under part 147 of this chapter as an article of ships' stores or supplies has been certified. (j) A bilge alarm is approved under this subpart if— (1) It meets the design requirements in § 162.050-33 and is tested in accordance with this subpart; (2) The oil content of each sample taken during approval testing is 15 ppm ±5 ppm; (3) Its response time is five seconds or less; and (4) Any substance used in operating the alarm that requires certification under part 147 of this chapter as an article of ships' stores or supplies has been certified." 46:46:6.0.1.1.5.6.1.6,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-9 Test report.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3383, Jan. 16, 2009]","(a) A report of approval testing must contain the following: (1) Name of the testing facility. (2) Name of the applicant. (3) Date of receiving the item for testing and the dates of the tests conducted. (4) Trade name and brief description of the item. (5) A listing of the following properties of the test oils used: (i) Relative density at 15 °C. (ii) Viscosity in centistokes at 37.8 °C. (iii) Flashpoint. (iv) Weight of ash content. (v) Weight of water content. (vi) Relative density at 15 °C. the of water used during testing and the weight of solid content in the water. (vii) The data recorded during each test. (6) A statement that the lab followed the testing procedures prescribed in 46 CFR subpart 162.050. (b) [Reserved]" 46:46:6.0.1.1.5.6.1.7,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-11 Marking.,USCG,,,"[CGD 76-088a, 44 FR 53359, Sept. 13, 1979, as amended by USCG-2004-18939, 74 FR 3383, Jan. 16, 2009]","(a) Each separator, oil content meter, and bilge alarm manufactured under Coast Guard approval must be plainly marked by the manufacturer with the information listed in paragraph (b) of this section. The marking must be securely fastened to the item. (b) Each marking must include the following information: (1) Name of the manufacturer. (2) Name or model number of the item. (3) If the item is a separator, the maximum throughput and the maximum influent pressure at which the separator is designed to operate. (4) The month and year of completion of manufacture. (5) The manufacturer's serial number for the item. (6) The Coast Guard approval number assigned to the item in the certificate of approval. (7) A list of bilge cleaners, solvents, and other chemical compounds that do not impair operation of the item. (8) If the item is an oil content meter, the oils for which use has been approved. (9) If the item is a separator that uses replaceable filter or coalescer elements, the part numbers of the elements." 46:46:6.0.1.1.5.6.1.8,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-13 Factory production and inspection.,USCG,,,"[44 FR 53359, Sept. 13, 1979, as amended by USCG-2001-10224, 66 FR 48621, Sept. 21, 2001]","(a) Equipment manufactured under Coast Guard approval must be of the type described in the current certificate of approval issued for the equipment. (b) Equipment manufactured under Coast Guard approval is not inspected on a regular schedule at the place of manufacture. However, the Commanding Officer, USCG Marine Safety Center, may detail Coast Guard personnel at any time to visit a factory where the equipment is manufactured to conduct an inspection of the manufacturing process." 46:46:6.0.1.1.5.6.1.9,46,Shipping,I,Q,162,PART 162—ENGINEERING EQUIPMENT,162.050,Subpart 162.050—Pollution Prevention Equipment,,§ 162.050-15 Designation of facilities.,USCG,,,"[44 FR 53359, Sept. 13, 1979]","(a) Each request for designation as a facility authorized to perform approval tests must be submitted to the Commandant (CG-ENG) according to § 159.005-1 of this subchapter. (b) Each request must include the following: (1) Name and address of the facility. (2) Each type of equipment the facility proposes to test. (3) A description of the facility's capability to perform approval tests including detailed information on the following: (i) Management organization including personnel qualifications. (ii) Equipment available for conducting sample analysis. (iii) Materials available for approval testing. (iv) Each of the facility's test rigs, if any. (c) The Coast Guard reviews each request submitted to determine whether the facility meets the requirements of paragraphs (g)(1) through (g)(4) of this section. (d) If the facility meets the requirements in paragraphs (g)(1) through (g)(4) of this section, they must obtain 12 samples containing mixtures of oil in water that are within a 10-to-30 ppm range that can be verified by an independent third-party source mutually acceptable to the applying lab and the Coast Guard prior to verification. (e) The facility must measure the oil content of each sample using the method described in § 162.050-39 and report the value of each of the 12 measurements to the Commandant (CG-ENG-3), Systems Engineering Division, 2100 2nd St., SW., Stop 7126, Washington, DC 20593-7126. (f) The measurements must meet the following criteria: (1) Except as provided in paragraph (f)(2) of this section, the absolute value of Tn for each measurement, as determined by the American Society for Testing and Materials, “Standard Practice for Determination of Precision and Bias of Methods of Committee D-19 on Water”, D 2777 (incorporated by reference, see § 162.050-4), must be less than or equal to 2.29 at a confidence level of 0.05. (2) The absolute value of Tn for one measurement may exceed 2.29 if the Tn values for the other eleven measurements are less than or equal to 2.23 at a confidence level of 0.05. If the Tn value for one measurement exceeds 2.29, that measurement is not used in the method described in paragraph (f)(3) of this section. (3) The absolute value of X d must be smaller than u based on the following analysis of paired observations: (i) Calculate the value of X d and S d . This is the mean and standard deviation, respectively, of the differences between the known sample concentrations and the values obtained by the facility with their equipment. The value of X d for the 12 measurements described in paragraph (e) of this section, or for 11 measurements if paragraph (f)(2) of this section applies, must be within the range 1 ≤ X d ≤ + 1. (ii) Determine the appropriate critical value of the Student's t-distribution with (n-1) degrees of freedom for a confidence level of α = 0.01. If all 12 samples meet the criteria of paragraph (f)(1) of this section then (n-1) = 11 and the critical value, is 3.106. If paragraph (f)(2) of this section applies, then (n-1) = 10 and = 3.169. (iii) Compute the value of u, where where n = 12 if all samples meet the criteria of paragraph (f)(1) and n = 11 if paragraph (f)(2) applies. (iv) Compare the absolute value of X d to the value of u. If |X d |